StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
The Origin of Fire Engineering and Construction Assignment
7 pages (1825 words) , Download 0 , Assignment
Free
For fire it is necessary that a flammable material must be there, the process of combustion requires high temperature and ample oxygen to maintain express incineration. The flame, which produces the illumination, is a collective energy of several shining particles of smoldering substance and shimmering gases.
Preview sample
Emergency Lighting System Engineering and Construction Case Study
10 pages (2705 words) , Download 0 , Case Study
Free
An emergency lighting system is a lighting system that is mainly used in emergency situations when a building’s main power supply fails either as a result of a fire or a power cut. This abrupt power cut may lead to total darkness which may cause panic and lead to unnecessary movements hence collision and physical danger for the occupants.
Preview sample
sponsored ads
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Water Filled Radiator for Domestic Heating Engineering and Construction Assignment
6 pages (1798 words) , Download 0 , Assignment
Free
Most radiators are built-in vehicles, houses, and electronic devices, among other mechanisms. A radiator emits heat to the environment that surrounds it. This may take place in order to cool the fluid entering the radiator. The construction of water-filled radiators must take into consideration various factors to produce the most efficient radiator.
Preview sample
Foundation Design and Construction Engineering and Construction Assignment
10 pages (2814 words) , Download 0 , Assignment
Free
The construction site is found opposite the Harris building at the meeting point of Hope Street and Corporation Street. ‘It is at the rear of numbers 91a to 87 Friar gate.’ The paper should provide all the necessary details including the place the site is located, potential hazards site history, surrounding buildings and streets, the shape and the size of the site Tomilson 2001).
Preview sample
Digital Camera Charged by Solar Energy and Take 3D Photos Engineering and Construction Assignment
7 pages (1967 words) , Download 1 , Assignment
Free
As the company product development department, we would like to thank you for the support you have accorded us this far. Through evaluation of the market trends and the needs of our product consumers, we have come up with a new product, digital camera charged by solar energy.
Preview sample
Vibration and Its Implications, Active and Passive Methods of Vibration Control Engineering and Construction Coursework
6 pages (1696 words) , Download 1 , Coursework
Free
There are areas where vibration causes fatigue to the machine itself or part of the system that is connected to the machine. Some parts of the machine may also end up weakening, therefore, requiring replacement. Furthermore, in areas that vibration occurs may become weak due to overheating of these areas leading to fatigue. Fatigue is the weakening of the materials that are under stress.
Preview sample
What Engineers Know and How They Know It Engineering and Construction Assignment
7 pages (2079 words) , Download 0 , Assignment
Free
Engineering is a wide discipline that can be viewed from different perspectives such as a profession, art, or skills applied in acquiring mathematical, scientific, practical social, and economic knowledge in order to build and design structures, devices, machines, materials, systems as well as processes (Billington, 2005).
Preview sample
Performance-Based Fire Safety Design Engineering and Construction Assignment
7 pages (1994 words) , Download 0 , Assignment
Free
According to the findings of the paper, it can be said that fire engineering is a vital aspect of all building design processes. Using expert knowledge of the response of people and buildings to fire, our fire engineering team facilitate architectural vision and address client needs, such as business continuity and property protection.
Preview sample
Electrical Wiring for the Lighting Circuit Engineering and Construction Assignment
6 pages (1491 words) , Download 0 , Assignment
Free
Both switches have a live wire and a switched live wire. As soon as the switch is put on, the connection is made between life and switched live wire. Thus this makes the circuit complete and the current flows through the circuit. The bulb glows up. A fuse is used in the active line of a circuit, to protect the circuit from the possibility of a current surge.
Preview sample
Metallurgy and Manufacturing Engineering and Construction Coursework
11 pages (3146 words) , Download 0 , Coursework
Free
Objectives: - for each machining process/operation: describe/sketch the work holding strategy; - for each machining operation: to identify the manufacturing parameters where appropriate; - to write the NC program of CNC machining of the component using ISO G-code, which should be able to run in the CNC machines in the manufacturing workshop.
Preview sample
Analysis of a Dynamic System - Gearbox Modelling Engineering and Construction Case Study
11 pages (3688 words) , Download 0 , Case Study
Free
It is important to consider having the knowledge concerning the simulation using Adams regarding the fault detection all the way to the diagnosis in the gearbox. Following this process, fault detection occurs with similar models while considering the relationship that does exist between signals like parameter estimation, observers, component analysis, and parity equations. 
Preview sample
Operation of the Brake Disc in the Braking System Engineering and Construction Coursework
8 pages (2254 words) , Download 0 , Coursework
Free
The brake disc is sealed using rubber square cut O-ring seals that usually apply pistons on their bore. Disc brakes are considered effective since they do not require return springs in that when brakes are applied the O-rings distort to apply the energy required. Once the brakes are released, the seals retract to their initial position thereby pulling the piston back and releasing the rotor.
Preview sample
Materials and Manufacture - The Production of Brake Discs Engineering and Construction Coursework
10 pages (2776 words) , Download 1 , Coursework
Free
Brakes are devices used to stop or slow an automobile. They are crucial for the safe movement of vehicles. When a vehicle is in motion, it generates kinetic energy. Therefore, for a car to effectively slow down, this energy must decrease. This is achievable through the transformation of kinetic energy into another form of energy.
Preview sample
Engineering Project Management - Projects in Controlled Environments Engineering and Construction Assignment
9 pages (2525 words) , Download 0 , Assignment
Free
There are five main elements around which PRINCE 2 is organized. These elements include: Product-based approach Business justification Structure for a project management team Project flexibility Division of the project into controllable stagesFurther, PRINCE 2 methodology is process-driven and is organized into eight stages or processes which are also divided into about 45 sub-processes.
Preview sample
Mass Spring Damper System Engineering and Construction Assignment
10 pages (2726 words) , Download 0 , Assignment
Free
An MSD is a procedure of analyzing vibrations in a mechanical system through the application of a required damping effect on a vibrating system. Such an analysis is critical in mechanical and structural systems because it helps in the identification of the most appropriate damping effect that should be provided for the respective system to contain vibrations within the system.
Preview sample
Design of a Heat Sink Engineering and Construction Case Study
11 pages (3093 words) , Download 0 , Case Study
Free
A company that produces a wide range of electrical and mechanical equipment and one particular piece of equipment has caused the company extensive problems as it continually fails due to excess heat causing the electrical circuitry/components to fail. They realized that there is a heavy-duty piece of electrical switching equipment that generates a tremendous amount of heat.
Preview sample
Public Transport Infrastructure - Brisbane Bus Rapid Transit System Engineering and Construction Assignment
43 pages (12395 words) , Assignment
Nobody downloaded yet
The report gives a description and justification of the concept scheme for the project to incorporate appropriate preliminary geometry, intermodal access, and integration features with consideration to pedestrian and cyclist, rail, bus, ferry, and private vehicles. The cross-river rail project and the Brisbane subway are the two projects which have been featured. 
Preview sample
Legislation, Regulations, Standards, and Building Codes Engineering and Construction Assignment
21 pages (5451 words) , Download 1 , Assignment
The legislation refers to the preparation and enactment of laws by a legislative body through its lawmaking process, whereas Standards are the documents provided to make sure the work is done is completed with the best technical application consensual wisdom. This includes the processes for selection in making appropriate choices, for ratification.
Preview sample
Categories of Hazards and Disasters Engineering and Construction Assignment
6 pages (1702 words) , Download 0 , Assignment
Free
The energy being released during the explosion is equated to a mass of TNT in order to provide the equivalent amount of damage. This is demonstrated by the equation: Equivalent mass of TNT= mass of explosives (or fuel) x equivalence factor Where: Equivalence factor = energy ratio factor x efficiency factor
Preview sample
Antwerp Construction Company - Occupational Health and Safety, Steel Building Collapse Engineering and Construction Case Study
18 pages (4597 words) , Download 0 , Case Study
Free
Antwerp is an engineering construction company whose main field of operation is in the construction business. The company has created a reputation for itself as one of the best construction companies in the country. It is for this reason that the company has made it a priority to ensure that the needs of its customers are met to the satisfaction of the customers.
Preview sample
Transport Engineering and Planning Applications Engineering and Construction Case Study
11 pages (3159 words) , Download 0 , Case Study
Free
It is essential to have an effective, attractive, amenable, and safe mass transit corridor that will ensure that services are delivered to the people in a manner that is acceptable. In order to have a safe mass transit corridor various features need to be incorporated into the Brisbane cross city underground rail.
Preview sample
Aerogel as an Engineering Material and Its Effectiveness Engineering and Construction Case Study
8 pages (2263 words) , Download 0 , Case Study
Free
The author of the paper states that aerogel is basically made from silicon dioxide that is very amorphous and has grains with sizes between 1.0-10nm which is filled by air forming a 3D structure. Aerogel also has very low conductivities in its various forms, therefore, possessing enormous insulation capacity.
Preview sample
Explanation of the Use of Aerogels Engineering and Construction Case Study
8 pages (2200 words) , Download 0 , Case Study
Free
The first Aerogel was developed in 1931 by Steven.S.Kistler, these were forgotten up to 1970 when the French government began the initiative of seeking a method to use porous materials for the storage of oxygen and other rocket fuels (Mortensen, 2007). The quest led to a major interest in this field like the use of sol-gel chemistry in the preparation of silica Aerogel preparation.
Preview sample
The Available Safe Egress Time or Required Safe Egress Time Principles Engineering and Construction Coursework
12 pages (3202 words) , Download 0 , Coursework
Free
The Available Safe Egress Time or Required Safe Egress Time (ASET RSET) is a preferred choice for fire safety or disaster management owing to its diversity within the fire engineering field. Various technologies that are employed in this field have exhibited the use of this application through its incorporation in making lives safer. 
Preview sample
Hydrogen Generation Center Design Engineering and Construction Case Study
10 pages (2831 words) , Download 0 , Case Study
Free
The occupants of the rooms in the building will be assured of safety while they are in the building and chances of the collapse of the floors or walls of the building will be reduced. There is a lobby that leads to the entrance to the building and measures 3300 mm by 2615 mm. This will create ease of movement between the rooms in the building without resulting in the congestion of the building.
Preview sample
Public Building and Its Construction Components Engineering and Construction Coursework
9 pages (2741 words) , Download 0 , Coursework
Free
The shopping mall is one of the outstanding public buildings in England with branches located in Kingston upon Thames, Berkshire, London, and Bracknell. The building that has a flagship Bentalls store located at the north end has the historic façade of the ancient Bentalls situated at the Southwest corner.
Preview sample
Vertical Axis Wind Turbine Engineering and Construction Case Study
6 pages (1825 words) , Download 0 , Case Study
Free
The forces and velocities involved in a wind turbine are as shown in figure 1 where the resultant vector is and represents a vector sum upstream air velocity and velocity vector of the turbine blade. There is the creation of varying resultant airflow, where there is a positive blade angle of attack for the upstream zone of the machine, with the signs changing downstream.
Preview sample
Factors That May Impinge on the Construction of the Building Engineering and Construction Coursework
6 pages (1719 words) , Download 0 , Coursework
Free
The author of the paper states that the existence of rugged terrain in the selected site may result in difficulty in constructing the foundation for the building. In order to use the selected site, it will be necessary to ensure the surface of the land is leveled and any rocks, pebbles, or stones in the location are removed.
Preview sample
Planning of Bunkering Processes Engineering and Construction Case Study
9 pages (3439 words) , Download 0 , Case Study
Free
Most of the spillages and overflows that do arise are a result of errors by human beings. Such operations should be executed as per the set laws and regulations because the damages caused when the oil spills are not easy to clear up and has serious damaging effects. This paper also provides the personnel with plans on dealing with spillages of oil.
Preview sample
Inputs and Outputs of an Engine Management Systems Engineering and Construction Assignment
9 pages (2503 words) , Download 1 , Assignment
Free
Sensors help cut down fuel consumption and harmful emissions in an engine. They play an important role in boosting engine efficiency. Sensors function to capture and transmit data about the engine operations. The input sensors include the engine airflow sensor. This sensor measures the amount of airflow entering the engine.
Preview sample
Heat Recovery with the Turbo Steamer Engineering and Construction Case Study
11 pages (2982 words) , Download 0 , Case Study
Free
For any heat recovery system to be successful in compatibility with the turbo steamer for Toyota land-cruiser V8 where it will use, the design and modeling take into account that heat recovery system that can withstand various environmental during its use (Endo, 2007). It has been modeled using SolidWorks software focusing on appearance.
Preview sample
Process Safety Engineering: Hazard Analysis and Risk Assessment Engineering and Construction Assignment
10 pages (2662 words) , Download 0 , Assignment
Free
Performance-based regulation has wide use, on a global scale, in the regulation of fire, air and water, and building safety; consumer product safety; transportation safety; worker safety; and energy utilization safety (Behn, 2001). Notably, the approach has wide used in the LPG industry as illustrated by the case of the UK Company which is shifting from the use of fuel oil to LPG.
Preview sample
The Replacement of Propylene Filters Engineering and Construction Assignment
8 pages (1846 words) , Download 0 , Assignment
Free
Researchers have continued to have conflicting opinions regarding what constitutes elements of good procedure. These views have often been different depending on the nature and complexity of industrial, laboratory, or engineering procedures. However, there have been consensuses on some factors. A support person is one of the elements that have been agreed that define a good procedure.
Preview sample
Production Planning and Control of General Motors Company Engineering and Construction Case Study
7 pages (2073 words) , Download 0 , Case Study
Free
General Motors Company uses sales and operations planning for benefits such as improvement of inventory management, increase promotion plans, increase accuracy based on budget forecasting, improving management process of a product's lifecycle, and having a great view of supply and demand across the company. 
Preview sample
Fracture of Natural Fiber Composites Engineering and Construction Assignment
6 pages (1934 words) , Download 0 , Assignment
Free
The jute fiber is used in many industries today, which stipulates that studying its fracture performance was beneficial in showing the additional areas it could be used. It was selected for this process based on many more application issues named in the literature review. Through reinforcing it with the epoxy resin will brand it effective for application in many other areas.
Preview sample
Knowledge of Science and Engineering Fundamentals Engineering and Construction Coursework
8 pages (2237 words) , Download 0 , Coursework
Free
In order to succeed in engineering, it is very important for students to positive attitudes towards the subjects being learned since their attitudes also matter a lot. The knowledge that students acquired in mathematics is well applied when it comes to making analysis and information data when it comes to engineering and another important synthesis that are very important in this unit.
Preview sample
The Importance of Sustainable Housing Engineering and Construction Case Study
15 pages (3909 words) , Download 0 , Case Study
Free
Lewisham house is one of the houses in Australia that have adopted sustainable housing which the main characterization is the use of resources in an efficient manner by adopting environmental sustainability measures. The report dwelt on the water supply system which is used for irrigation and washing.
Preview sample
Vehicle Detection Systems, Motorway Widening, Auxiliary Infrastructure, Driver Information Systems Engineering and Construction Case Study
24 pages (6345 words) , Download 1 , Case Study
Premium+
The current roads have been installed with improved technology safety gadgets like traffic lights for control of traffic and zebra crossings, and speed track gadgets which are placed strategically on the major roads. All these controls seem not to be effective in monitoring traffic, monitoring and notifying the authorities of accidents, speed tracking, and all other traffic involved controls.
Preview sample
Designing a Hydraulic Parking System to Help Alleviate the Problem of Parking in Urban Areas Engineering and Construction Term Paper
19 pages (4981 words) , Download 0 , Term Paper
Free
The design and construction of buildings are stories to accommodate offices and for residential. These people have extra income that will support a comfortable life such as owning a car. This car can not be parked anywhere thus we need a well-designed car park system that can hold many cars economically. 
Preview sample
Fire Engineering and Prescriptive Approaches in Design of the Means of Escape in Building in the UK Engineering and Construction Report
9 pages (2359 words) , Download 0 , Report
Free
The engineers and architects usually are required to follow laid down standards governing the construction industry in the UK. The escape routes in most buildings in the UK are regulated in BS7974, approved document B, and BS9999. This standard requires fire escape means to be designed in a manner that ensures the smoke does not spread across the route.
Preview sample
Optimum Design Specification to Design a Hybrid Vehicle Engineering and Construction Literature review
11 pages (2880 words) , Download 1 , Literature review
Free
The introduction of hybrid vehicles will assist in constituting an essential section of human life that focuses on a clean environment. The reason to come up with hybrid vehicles is that reliance on oil as the fundamental basis of energy to many vehicles contains financial and political consequences.
Preview sample
Structure, Materials and Fire in Construction Engineering and Construction Assignment
9 pages (2746 words) , Download 0 , Assignment
Free
When Portland Cement was invented in the 19th Century did concrete become popular in the Construction Industry. The European engineers are the ones who pioneered current concrete designs together with different construction practices in the 19th century and today, most engineering works are done by use of reinforced concrete, (Ozcebe et al, p.1).
Preview sample
Combustion, Effects of Enclosure Temperatures on Fire Growth, Fire Development by Flowing through the Openings Engineering and Construction Coursework
10 pages (3069 words) , Download 0 , Coursework
Free
In an enclosed fire, there are processes involving the massive move of heat towards and away from the combustible substances as well as the environment. This study tends to introduce the most prevalent of these processes; this section includes a general qualitative description of the chemical and physical phenomena associated with fire.
Preview sample
Principle of ASET & RSET with Regards to Means of Escape Engineering and Construction Math Problem
10 pages (2969 words) , Download 0 , Math Problem
Free
The doorways of a building should be labeled with proper colors or signs that indicate the escape routes in case of fire. When a place where the people has objects and the exit route is far then Available safe escape time to occupants to escape becomes too large as they have to negotiate the route with the object(Chow, Fong, Pang, Lau, and Kong, 2006).
Preview sample
Advanced Hydraulic Engineering Engineering and Construction Lab Report
9 pages (2741 words) , Download 0 , Lab Report
Free
Steady and unsteady 2D and quasi-2D flow models are typically used to assess the water levels and discharges during floods in compound river channels where flow occurs in both the main channel and on the flood plains. The quasi 2D approach is usually to couple a 1D model of the main channel with a series of cells representing the flood plains, whereby each cell is modeled.
Preview sample
Fire Safety Engineering Issues in Formosa Plastics Corporation and the Hotel in Cardiff Engineering and Construction Case Study
13 pages (3290 words) , Download 0 , Case Study
Free
Burns from chemical flames are more dangerous since chemical residue may be deposited on the skin which continuously damages the skin (U.S. Chemical Safety and Hazard Investigation Board, 2006). There was proper communication from control room operators requiring all employees to escape from the building when they smelled the gas.
Preview sample
Engineering Design Practice Engineering and Construction Assignment
10 pages (2287 words) , Download 0 , Assignment
Free
Include diagrams showing heat release rate for thermally thin and thermally thick, charring, and non-charring materials. The heat release rate is the total amount of heat discharged by the gas phase of combustion of a unit mass of fuel discharged by pyrolysis per unit time and per unit area of the burning surface.
Preview sample
The Behaviour of the Materials Used in Construction in Times of Shrinking Engineering and Construction Assignment
12 pages (2841 words) , Download 0 , Assignment
Free
Limiting Oxygen Index test determines minimum oxygen required by fuel to ignite. In this method, a substance is ignited a controlled atmosphere where oxygen is adjusted to determine the minimum amount of oxygen to just sustain burning. This method may the wrong result if the substance that is being used has impurities. 
Preview sample
Different Types of Fire Testing Engineering and Construction Assignment
7 pages (1992 words) , Download 0 , Assignment
Free
Standard test method for surface burning- this is the test for the characteristics of the burning surface of building material. Fire resistance test – the test for resistance to the flame by a material Fire test through penetration firestops this is done through penetration firestops Rapid rise fire test – tests for the rate of fire spreading. (Stollard, Abrahams, 1999)
Preview sample
Concrete Frame and Steel Frame Construction Engineering and Construction Assignment
10 pages (2860 words) , Download 0 , Assignment
Free
Recent studies on the behavior of structural steel during a real fire particularly those that are conducted in the United Kingdom suggest that fire resistance of steel structures is greater when they are connected as a framework. For instance, framed steel has greater fire resistance compared to its individual elements.
Preview sample
2251 - 2300 results of 5632 items
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us