Our website is a unique platform where students can share their papers in a matter of giving an example of the work to be done. If you find papers
matching your topic, you may use them only as an example of work. This is 100% legal. You may not submit downloaded papers as your own, that is cheating. Also you
should remember, that this work was alredy submitted once by a student who originally wrote it.
In February 2008, the government of the United Kingdom launched a new strategy for housing known as “Lifetime Homes, Lifetime Neighbourhoods: A National Strategy for Housing in an Ageing Society”. The strategy document identified ageing in UK society as one of the greatest “housing challenges”.
Fire safety management should incorporate the engineering phase where selection and control of materials are done. All the plans are reviewed before new construction is done or re-modeling of the building where certain provisions required by fire code were omitted. The exercise will ensure all the buildings are built to conform to the fire codes.
Preview sample
sponsored ads
Hire a pro to write a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
In this coursework, I will explain conventional Hot and Coldwater Domestic systems with diagrams as well as pipe sizes and fittings. All the systems mentioned here are not only well suited for domestic use but they are equally helpful if you are associated with any business and wish to run it accordingly.
8 pages (2223 words)
, Download 3
, Research Paper
Free
Contaminated water includes harmful substances such as human waste, oils, small particles of materials, soaps, and various industrial chemicals. Contaminated water is not only harmful to health but also for the environment. Many wastewater treatment methods are there which effectively purify the contaminated water.
8 pages (2285 words)
, Download 3
, Literature review
Free
Although biomedical engineering has been there in the past few centuries, its significance has only rising in the past few decades. So new I this study that most people are either not aware of it or are not sure of what it is about. Of course, an important thing is to know about its significant, in the present and in the future.
This methodology of construction is simple in that the timber frame members are joined to each other through the use of an appropriate method such as bolting and nailing to constitute a desirable framework. Timber frame buildings are intricate structures that are prefabricated before assembly. The carpenters are engaged in coming up with sections.
The pressure is noted to fall with respect to the temperature of the room since the volume of air increases due to expansion. Similar experiments are necessary given the scenarios in the study for the purpose of designing buildings in which occupants can be able to vacate prior to an increase in toxicity to an untenable extent as seen in ASET and RSET.
As stated, the capabilities of commercial aircraft have increased considerably. This research paper has examined two of the trendsetting modern aircraft that are bound to determine the future of aviation. In both cases, there has been a switch from 3000 psi hydraulic systems to the 5000 hydraulic system.
There are many theories that guide participants in urban planning. As such, planning can be termed rational planning or democratic planning. While democratic planning recognizes and gives room for public participation in the planning process, rational planning has little to do with public participation (Lane, 2011).
6 pages (1742 words)
, Download 0
, Literature review
Free
Akin to NAT, HRO theory, Callon's precautionary principle, and the Janus effect, HRO theory is not much useful since HRO organizational processes are not more expansively considered. Besides, the Normal Accident Theory concludes that a number of technologies, like nuclear power, must simply be discarded for the reason that they do not deserve the risk.
6 pages (1500 words)
, Download 2
, Research Proposal
he interior noise and vibrating levels whereby the interior design will either keep these levels to a minimum or accelerate the noise and vibrating levels. Consequently, interior trims such as the car-seats and roof covering play a very vital role in the observation of interior
This makes the choice of materials a permanent part of product development. New materials provide features lacking in older materials. This paper relates to the process of identifying the best materials for use in luggage wheels. Its aim
Typically, slip forms are only four feet in height and are mostly used up to heights of 400 feet. This gives a form reuse aspect of 100 where no rearranging is required. In addition, the working areas and finishing scaffolds are among the form assembly hence excluding the requirement of scaffolding.
CFD analysis applications are critical in ensuring the success of the design and development phases of industrial production. They include but are not limited to internal and external fluid flows, gas or liquid flow with heat transfer, real gases, time-dependent flow, heat transfer, transonic regimes, compressible gas, and conjugate heat transfer.
Similar to all other geotechnical structures, pavement performance is dependent on moisture conditions and other environmental factors. Some of the significant elements that affect the amount of moisture in a bound flexible pavement are infiltration and percolation of rainwater and underground water.
It focuses on the Prince2 project management methodology and the PMBOK knowledge areas and how they add value to the project. It also shows the benefit of using the Prince 2 project management methodology. It shows how managers can be hands-on in project activities and even decision-making processes.
Supplier selection is often a common decision problem involving many levels. Various scholars define the supplier selection problem as “which supplier should be selected, and how much quantity of order should be assigned to them”. However, this topic has lately attracted the attention of the majority of scholars as well as business practitioners.
The experiment then entails comparing the results with those obtained from the derivation of the secant assumption formula. The primary purpose of arches is to reduce the bending moments in long-pan structures. However, the rising of the arches creates a horizontal reaction at the supports even when loaded by a shear force.
Generally, the process of identifying, analyzing and evaluating risks is risk assessment. This assessment is best attained by combining actuarial measures and professional judgment. While risks can be dynamic or static, risk assessment measures the consequence and the likelihood of an event (Hillson, 2000).
There is a cutter to which the manufacturers connect to the source of highly pressured water. Water is consequently let out of the nozzle, causing a cut on the material in use by having the constant jet of water sprayed on it. Abrasives such as bauxite and granite are added to the highly pressured water to aid in the process.
The main two themes used in the engineering design process include teamwork and design. Following the steps ensures the users strengthen their understanding of the open-ended design process emphasizing practicality and creativity. The steps of the engineering process ought to be often repeated before one can move to the next step.
The history demonstrates to engineers that rather than consider their personal or business interests while working on projects, they also need to consider stakeholder’s interests. It calls for a need for engineers to acquire interpretive knowledge of Aboriginal cultures, by interacting with people from the community, attempting to speak the language, and understanding the histories and values.
It also ensures that humans avoid systematic encroachment on nature through the destruction of the habitat of other species. The nanotechnology innovations technologies also ensure affordable eco-efficient products, such as solid-state lighting, which ensure that humans can globally access lighting energy fairly.
My first reflection is based on the vignette that presents Dr. Ward Ward’s opinions on the issue of averting the oncoming climate changes in his publication entitled “The possible peak and Decline of Industrial Civilisation”. The world is at the peak of development and much of the focus is placed on growth and more growth (Ward, 2).
Concretes are used in the construction of roads, pavements, sidewalks, and basketball playgrounds among other structures. The use of concrete as a structural material has become common in modern society. Despite the growing use of concrete as a structural material, concrete has a limitation in the sense that it has low tensile strength.
Engineering InnovativenessExecutive SummaryBasically, innovation and engineering work hand in hand in enhancing sustainability in different fields. For many years now, engineers have played a critical role in innovation and improving the society.
The microcontroller takes the input from various sensors installed on the chair covering all the directions and providing corresponding outputs that help users to decide on the safe movement and control of the chair. An analog joystick is installed for movement control. There is a need for an analog-to-digital converter.
The various sections of the report cover the managerial and technical aspects of the company with particular regard to the Mina Abdullah Refinery situated at the Abdullah Port. Moreover, the report provides pertinent information about the engineering aspects; particularly the functions, and execution of engineering roles, and responsibilities.
In conclusion, different technologies and techniques are employed in fulfilling the construction requirements. Concrete and steel are the main materials used in ensuring the structure is stable and fulfills the construction requirements. In addition, different processes and approaches are required in the planning and implementation of any strategy.
The spectral distortion (SD) of the estimated power spectrum envelope is computed over the capacity spectrum on the cardinal plane as the goal measure, which helps in finding the superiority of the capacity spectrum. The variability measure is always carried out upon capacity spectrum produced from 20-30 ms breath of tone.
Torrens Island power station is one of the biggest energy harnessing companies in Australia and the largest in the entire south of Australia. Due to its location and experience of operation, Torrens Island power station provides a better platform for the study of steam power plants. Torrens Island power station is the largest power station in South Australia.
The Navier-Stokes equations show the conservation of momentum, and the continuity equation is a representation of mass conservation. These equations form the center of fluid flow modeling. Solving these equations for given boundary conditions enables the prediction of fluid velocity and pressure in the geometry of flow. Only a small number of analytical solutions.
It is imperative to note that there have been numerous developments that have been made by the government in the city. Some of the key developments include social amenities such as colleges, schools, and health care centers. This has led to the need for more car park facilities that enable people to park their cars efficiently and effectively.
In Buoyant flames, temperatures are high at the upper side of the flame and continue decreasing with increasing height. The flow velocities are also influenced by the proximity to the openings and the number of openings available. In jet flames, the temperatures are high throughout the flame, and the number of openings still influences the flow velocity.
This has come due to the rising need for sustainable ways to dispose of worn-out or waste tires. Currently, rubberized concrete has been used widely, especially in non-structural constructions such as sidewalks and pavements. This has produced a wide range of research literature surrounding the engineering properties of rubberized concrete.
Libya has a good solar regime on the horizontal plane that reaches 7.5KWh/m2 with a range of 3000-3500 hours of sunshine in a year. In 2006 1865 kwp of PV capacity were installed in Libya, with the amount increasing; in rural areas, decentralized electricity system is generally encouraged. In agriculture, PV systems have replaced diesel in supplying water pumps with electricity.
By definition, nuclear energy is the multiple of the mass of the atom by the speed of light squared. This was deduced by Einstein who did numerous experiments to land this conclusion. Nuclear energy was first used successfully by the Manhattan Project where a chain of reactions was observed leading to the creation of bombs.
Natural hazards: these are dangers caused by Mother Nature. Earthquakes, lightning, floods, extreme weather (snow), tsunami, landslides, and tidal currents. Material hazards: these are caused by material that is used in the subsea system. The LPG, dry chemical powders, diesel oil, lubricants used, methanol, and nitrogen are among the material hazards.
The process of supplier selection requires a firm to deploy a tremendous amount of financial resources due to the need to contract suppliers offering high value. A company invests lots of money in its operations. To ensure efficiency, companies are relying on outsourcing complex services and products to different suppliers.
The first step is to design a ‘Mesh’ in FDS06. A ‘Mesh’ is an open space; where the domain will be modeled in it. The Mesh was designed by using the above command; it determined the dimensions along (X, Y, Z) axes; in addition to the number of cells required in each direction (X, Y, Z). Step 2: The command below was used to build up.
The Building Regulation (Approved Document B) dictates that external walls to a building shall be constructed in a manner so as to adequately resist the spread of fire over and/ or through the walls from one building to another, making due consideration for the height, use, and position of the building (The Building Regulations, 2010).
Buildings are rarely built in isolation and once there is a fire outbreak in one, it can easily spread to any nearby buildings. The designer, therefore, has to ensure that such a situation does not occur and in case of fire, it is confined within the walls of one building not only for safety but also for easier management.
The connecting rod forms an integral component of an internal combustion engine. Ideally, the connecting rod is acted upon by a myriad of different loads of different magnitudes. As a functional component, the main function of the connecting rod is to transmit the translational motion of the piston to the rotational motion of the crankshaft.
The resistance of is controlled by varying the thickness of the film layer or by varying the ratio of carbon dust to the ceramic. The mixture is made into a cylindrical shape and the metal wires are connected to each end for electrical conductivity, before coating with insulating material. They are available with a tolerance of ±0.25% to ±5% with less than 1W.
Some sugar mill by-products have nutrients that can be used as culture media for the micro-organisms that can be used in the commercial production of PHB. This paper focuses on the additional design and integration of a PHB production plant to utilize molasses produced by Victoria Sugar Mill in Ingham, located North of Queensland to produce PHB in a more economical way.
The underground railway system has been put in place to solve transport problems on the surface, especially in congested metropolitans. Apparently, the benefits of mass transport in today’s world cannot be gainsaid as people and luggage are able to be transported in large numbers to several destinations.
Satisfaction of customers is part of the company’s core values of operation. The companies operating in the mining of copper in Phonsavan have high standards of customer service relations; the government through its geology department has continued to support them in increasing investment. The town enjoys good infrastructure such as access to electricity and good roads.
The possibility of fire spreading to adjacent buildings depends on the distance separating the two buildings, the fire protection measures provided on the external surfaces of the building, the intensity of the fire, and the risk it poses to the occupants of the building. The requirements cover the provisions for external walls and the roof.
It is an advantageous method and a modern way of tunneling when compared with the predecessor methods of tunnel construction. This system of tunnel approach monitors the deformation of rock masses and designs the effective support systems with the articulate reference to the rock mass type and the deformation characteristic.
Three varieties each of about seven kilograms must be compressed so that their compressed densities range from ninety-five percent to a hundred percent with ten, thirty, and sixty-five blows. Balance of empty mound, pour water to the leading specimen (compact it in five strata by giving ten blows per layer).