StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Suggestions for Reducing the Cost of a Structure - Business Plan Example

Cite this document
Summary
The paper "Suggestions for Reducing the Cost of a Structure" looks at the development of effective construction methods, aims to reduce the costs, and uses the minimal amount. This knowledge will depend on the experience that will be available during the first phases of the development process…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.6% of users find it useful
Suggestions for Reducing the Cost of a Structure
Read Text Preview

Extract of sample "Suggestions for Reducing the Cost of a Structure"

Engineering and Construction] [Suggestions for Cost Reduction] Suggestions for reducing the cost of a structure Introduction It is the target in the field of construction that any building that is to be constructed has to use the least cost possible. This has been done effective by innovating building technologies that will reduce the cost but also be productive. Research has always been done constantly so that possible ways of reducing building costs can be discovered and implemented in the building industry. This does not mean that the buildings should be constructed with low cost with poor quality and design which will later make it more expensive to maintain. It should be constructed at a low cost but at the same time the quality and standard of the building is being maintained. Many ways have ever since been discovered and are being used in most parts of the world in construction. Ways of reducing construction cost 1. Discover new Building technologies The industry should be able to develop new technologies that will assist in increasing the efficiency of the construction 2. Reduce the time set for the construction The time for the construction if reduced, it will help save on the salary spent to pay the workers, the cost of the hired equipment and company sites (Pries & Quigely 2013, p.54). 3. Reuse waste materials and resources Materials that have been used as formwork can be reused in the site until they are completely worn out. 4. Understand the current cost of construction materials and dwellings It is one of the most essential parts of construction and for any contractor who is cost sensitive, it is important to know the cost of property, building permit charges, taxes, and fee for connection of electricity, sewerage and water supply, interest loans that will offer profit to the project. The construction management should also be able to know the current construction cost. 5. Construction methods Construction methods that are effective and not time consuming can be used so that the time that is used could be reduced. This can be done with the arising construction effective technologies. 6. Break down the parts of the building The entire structure is to be divided and classified as per the order of construction and grouped in the way they are related so that it can be possible to know the materials that can be reused and the workers grouped according on their area of skills. This will make the work pore simplified and organized to reduce on excessive costs. 7. Cost allocation The management team should put the costs and the specific work that it will be spent on and see how it can be reduced so as not to affect the quality of the work and not to overwork the stake holders. It can be divided into the following subs as the will be operating: Materials Labor Sub-contractors; this is the sect that receives a larger percentage of the construction cost. Other expenses like the establishment of the project, machines that will be hired or bought and used on the site, and the management of the site and the construction. Technical consultations from other professionals Contractor remunerations If the construction will be able to implement more reliable and industrialized methods of construction then they will able to decrease the hours spent working on the site and also there will be the reduction of the waste materials that may arise in the process of construction. These new methods that will be used on the site will be able to reduce the services of the subcontractors (Younker 2003, p.16). Arranging the production into posts will also help simplify the scope of the construction of the four storey building. The posts may be classified into: Landscaping and Foundation Structure: This is inclusive of the material that will be used and the working hours that will be related with the construction of the structures that will be installed for load bearing. The climatic shells will involve the construction of climate controlling parts of the structure like the roof, outer walls, work that will be done on the finishing the exterior façade including the gutter, plating etc. Installations refers to management able to estimate the cost of plumbing, electrical cabling, and that of the HVAC (heating, ventilation, and air conditioning) systems that will be installed in the four storey building. Interior finishes refers to the cost of the interior amenities should also be estimated and work towards the cost that will be used for construction and the maintenance. Interior finishes include: washrooms, partition walls, painting, cabinetry etc. Establishment refers to the cost that will be used to put up the hoarding of the construction site and any other necessary fencing that will enhance security in the site. And other temporary roads that will be used for movement of machines on the site and the workers to avoid accidents and injuries. Management will be the cost that to be used during the life cycle of the construction to ensure its target is met. The things that will require such costs include: the cost of hiring the materials for scaffolding, machines, and the cost of the managers on site, offices, and other rooms. Technical design will include the cost of other designs except that of the architectural design Remunerations amount to be 10% of the cost of contract. All these costs should be calculated basing on the data of the current costs and those that can be reduced on the estimated costs are reduced. The cost of management will rely on the time that the construction will take, so if the time is minimized as much as possible then the cost to be spent on management will also be reduced. Therefore, the contractor should be able to check the prefabrication and the efficient technological industrial methods because they have a huge impact on the cost of the construction of the structure (Park 1998, p.45). 8. Cut the costs that are not value adding Many constructions have faults and one of the major sectors that form these faults are those that are linked with costs that do not add any value to the building erection. This can be countered by improving on the methods of construction and planning strategically. There should be reduction on the cost that is spent on waste which involves the purchase of excess material that cannot be reused and reduce the theft of construction materials. Some of the things that formulate the costs that are not value adding include: Moisture damages of the exterior walling and other parts that are not well damp proofed. Logistic problems that are brought up by the planning that has different people with different goals in the project. Waste has been analyzed to be arising from all sections: buying excess material, unnecessary transportation, avoidable accidents, therefore it is possible to reduce the cost that is brought up by waste on site (Heller 1971, p.63). Thermal Bridges should be brought up by the varying temperatures between the exterior wall and the exterior parts of the slab, especially the connection between the wall and the balconies. These can lead to growth of moulds due to the low temperatures that are brought by the thermal bridge. The regulations of how to reduce the thermal bridge should be followed to reduce the cost that will be used for maintenance after the walls have been damaged by moisture (Pourghazian 2008, p.12) Conclusion By looking at the development of effective construction methods from the whole process of building, it is possible to reduce the costs and use the minimal amount as much as possible. The knowledge of these methods will depend on the experience that will be available during the first phases of the development process. Reference List Heller, E. D. (1971). Value Management: Value Engineering and Cost Reduction, Addison Wesley Publishing Company, London; U.K. Park, R. (1998). Value Engineering: A Plan for Invention, CRC Press, Cambridge; U.K. Pourghazian H., Sep 2008, Industrial Construction Methods for Cost-Effective and Sustainable Multi-Storey Buildings, Stockholm, Sweden. Pries, K. & Quigely, J. M. (2013). Reducing Process Costs with Lean, Six Sigma, and Value Engineering Techniques, CRC Press, Cambridge; U.K. Younker, D. (2003). Value Engineering: Analysis and Methodology, CRC Press, Cambridge; U.K. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Suggestions for Reducing the Cost of a Structure Business Plan Example | Topics and Well Written Essays - 1250 words, n.d.)
Suggestions for Reducing the Cost of a Structure Business Plan Example | Topics and Well Written Essays - 1250 words. https://studentshare.org/engineering-and-construction/1820973-suggestions-for-reducing-the-cost-of-the-structure
(Suggestions for Reducing the Cost of a Structure Business Plan Example | Topics and Well Written Essays - 1250 Words)
Suggestions for Reducing the Cost of a Structure Business Plan Example | Topics and Well Written Essays - 1250 Words. https://studentshare.org/engineering-and-construction/1820973-suggestions-for-reducing-the-cost-of-the-structure.
“Suggestions for Reducing the Cost of a Structure Business Plan Example | Topics and Well Written Essays - 1250 Words”. https://studentshare.org/engineering-and-construction/1820973-suggestions-for-reducing-the-cost-of-the-structure.
  • Cited: 0 times

CHECK THESE SAMPLES OF Suggestions for Reducing the Cost of a Structure

Management of Honeywell International

This system is market oriented and saves organizations the cost of forecasting and researching the market to see which products they can produce.... The history of Howell dates back to 1999 where the original Honeywell was bought by a company known as Allied Signal and the joining of the two companies proved to be hard because of the different management structure....
5 Pages (1250 words) Essay

Ikea's Global Sourcing Challenge: Indian Rugs and Child Labor

This also allowed IKEA in reducing the cost of the products and expanding their sales prominently.... The retailers and other businesses associate themselves with producers working in the developing countries so that the cost of production can be reduced.... This showed the social responsiveness of the business and prescribed that the organization gives heed to the social issues even at the opportunity cost of business profits (Bartlett, Dessain, and Sjoman, 1-12)....
5 Pages (1250 words) Essay

Global Environment of Business

One of the main problems of this option is the lack of addressing the people component… It may, in fact, not be cost-effective to completely move all the software development to one location and only in the U.... Jane Haas' suggestion to move all software development to the Palo Alto is definitely a worthy option, but is not advisable in a global community and does not fit into the PARC strategy....
24 Pages (6000 words) Essay

Master Dissertation Proposal

However they all share some same (Jablonski, 1991) This dissertation proposal is about implementation of a TQM structure through information technology.... 2004) The aim of this research is to identify quality issues in call centers delivery of service and also to recommend a total quality management structure though information technology.... However little has been done to bring improvements in the structure.... (Au and Choi, 1999) The IT structure is scattered and knowledge sharing is an issue in the industry....
4 Pages (1000 words) Essay

A Quicker Way for the Directors to Pay Dividends

These ratios include: Gross profit is difference obtained between sales turnover and cost of goods or services.... Primarily, it indicates company's level of performance as it accounts other components of operating income other than cost of sales.... The faster way to offset the losses brought forward includes reducing the share premium by transferring such equivalent amount profits (Stretcher and Johnson, 2011).... Nevertheless, the company can acquire finances from other providers of capital if it has a mixed debt structure....
8 Pages (2000 words) Coursework

Management during Low Sales Volume

eriodic review of financial statements should be done in more stringent way for reducing the chances of fraudulent sales data.... So in this case the amount of bonus will increase the amount of total cost of this organization.... Again management has decided to reduce labor cost within the organization for the cost saving purpose.... It is possible for reducing compensation and benefit provided from the end of organization.... In the above mentioned organization, management can use the suggestion box strategy where employees can provide their valuable suggestions for the improvement of organizational procedure....
2 Pages (500 words) Research Paper

Leisure Outfit Ltd (LOL)

This essay analyzes Leisure Outfit Ltd (LOL), that is a very recent company that is making effort to set its foot in the retail outfit industry and as a result of which the company has undertaken loan and overdrafts from the bank along with raising of equity share capital.... hellip; This essay discusses that the liquidity assessment is best conducted with the help of current ratio and acid test ratio....
8 Pages (2000 words) Assignment

Proposed Construction of Two-Storey Elevated Parking

These projects may be undertaken in developing new products or services, realize the organizational change in structure or style, designing a new transport vehicle, developing new information systems, construction of a building and other structures, and so on.... People managing a certain project, aside from meeting the needs and expectations of stakeholders, must have the knowledge, skills, tools, and methods to balance competing demands for scope, time, cost, and quality of the project....
13 Pages (3250 words) Research Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us