Time Overruns in UK Railway Engineering Works - Research Proposal Example

Cite this document
Summary
From the paper "The Causes of Time Over-Runs in UK Railway Engineering Works and Projects", the events in which railway tracks in Rugby, Liverpool, and Shield Junction were closed leading passengers to be stranded, show that concerns about time overruns in railway projects are justified…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.1% of users find it useful
Time Overruns in UK Railway Engineering Works
Read Text Preview

Extract of sample "Time Overruns in UK Railway Engineering Works"

Download file to see previous pages

Time overruns have been referred to as a plague on modern engineering projects as all types of projects are prone to time overruns. Time overrun refers to the variation between the estimated project duration and the actual duration of a project. Passengers in the United Kingdom usually cover a combined distance of over 50 billion. However, every 1 out of 10 trains fails to arrive at their destination on time or fail to arrive altogether. During the 2006/07 period, train passengers in the UK lost 14 million minutes in delays, costing about £1 billion in lost time. This gives us the problem under study and reveals that there is a need for corrective measures in order to save the government and common citizens money and time.

In December 2007, during the period before the Christmas holidays, sever major enhancement projects and renewals were planned for the national rail network. This period was chosen as passenger numbers during the holiday season are usually low. Various contractors were given the task to complete these projects so that the rail would be operational at the turn of the 2008 New Year. The project, however, experienced various times over-runs so that in January 2008, serious disruption of train services was encountered. The disruptions occurred in Rugby, Shields Junction, and Liverpool Street (ORR, 2008).

Time and cost overruns in government projects are many despite the fact that they inconvenience various stakeholders connected with these projects. These over-runs are diverse and their causes are usually interconnected and at times it is hard to narrow down the specific causes of these over-runs.

The engineering plan describes the complex decision-making process that defines and schedules various tasks within a project, from its inception to its conclusion (Pinedo 2009). An engineering, planning function should be able to estimate the resources needed for the project, the time needed for the project as well as any risks that may alter the estimated values.

Cost and time over-runs are usually a result of poor engineering, planning, or some failure within a developed engineering plan. In order to analyze cost and time over-runs, it is important to analyze the engineering plans developed for a given project and determine at what point did the failure begun or what aspects of the plan made it possible for failures to develop without being controlled.

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(TITLE: The causes of time over-runs in UK (United Kingdom) railway Research Proposal, n.d.)
TITLE: The causes of time over-runs in UK (United Kingdom) railway Research Proposal. https://studentshare.org/engineering-and-construction/1818516-title-the-causes-of-time-over-runs-in-uk-united-kingdom-railway-engineering-works-ew-and-projects
(TITLE: The Causes of Time over-Runs in UK (United Kingdom) Railway Research Proposal)
TITLE: The Causes of Time over-Runs in UK (United Kingdom) Railway Research Proposal. https://studentshare.org/engineering-and-construction/1818516-title-the-causes-of-time-over-runs-in-uk-united-kingdom-railway-engineering-works-ew-and-projects.
“TITLE: The Causes of Time over-Runs in UK (United Kingdom) Railway Research Proposal”. https://studentshare.org/engineering-and-construction/1818516-title-the-causes-of-time-over-runs-in-uk-united-kingdom-railway-engineering-works-ew-and-projects.
  • Cited: 0 times

CHECK THESE SAMPLES OF Time Overruns in UK Railway Engineering Works

Safety and Security of Public Transit

Safety and Security of Public Transit Role of Public Transport: Portability and access to employment, community resources, school/ college and health care is provided by public transport.... Over 90 percent of the people who travel by public transport do not own a car hence they have to rely on public transit....
20 Pages (5000 words) Research Paper

Challenges, Strategies, and Risks in Managing the Canary Wharf Megaproject

Introduction Mega-projects are described as multibillion-dollar infrastructure projects normally contracted by governments and delivered by the private sector in what is called a public-private partnership.... Because of the massive scale, investments, and high number of stakeholders involved in these projects, they are often characterized as long-term, indeterminate, complicated and politically sensitive (Marrewijk, Clegg, Pitsis, & Veenswijk, 2008; Turner, 1999; Flyvbjerg, Bruzelius, & Rothengatter, 2003; Koppenjan, 2005)....
44 Pages (11000 words) Dissertation

Newcastle as Postindustrial City

Since time immemorial, cities had been cauldrons of creativity.... Author Daniel Bell has achieved prominence as one of those who established the concept of post-industrial society.... Bell had pushed the concept of changes to the social structure, economy, occupational system, and the values and norms of such countries as the United States and USSR....
16 Pages (4000 words) Essay

The Dilemma of British Railway System

The research 'The Dilemma of British railway System' is based on historical data which are provided by the Network Rail and analysts.... After investigating the poor performance of the British railway system this will allow a systematic evaluation of whether privatization was successful or not.... The private company established to take over the railway operations, Railtrack, manages the signals, station as well its development and maintenance....
40 Pages (10000 words) Case Study

How Does Rainfall Influence the Stability of Natural Slopes

The paper 'How Does Rainfall Influence the Stability of Natural Slopes?... looks at slope stability problems, which will likely develop after timber cutting on steep slopes where most of the soil strength is provided by the binding action of roots.... As roots decay after clearcutting, the value for their relative reinforcement declines....
40 Pages (10000 words) Dissertation

Importance of the Thames Barrier to Protect London from Flooding and to Protect Londons Growth

This report "Importance of the Thames Barrier to Protect London from Flooding and to Protect Londons Growth" discusses the Thames Barrier located downstream of central London, United Kingdom.... It is a magnificently well-built mega-structure of the world.... ... ... ... The purpose of this barrier is to prevent London from being flooded....
14 Pages (3500 words) Report

Fire-Safety in the Channel Tunnel

The Channel Tunnel considered to be the eighth wonder of the world and a commendable engineering feat proved that no conventional designing and engineering molds and safety measures could prevent eventuality and incident like that of a fire.... This fire was the biggest ever challenge for the firemen who arrived on the scene from all over France, uk, and Europe....
9 Pages (2250 words) Case Study

Heathrow Tunnel Collapse 1994

In 1994, a new underground railway tunnel and station were under construction beneath the Central Terminal Area of London's Heathrow airport.... The larges project under construction during that time, Heathrow Express was due to commence operations in June 1998.... The service will operate brand new rolling stock to cut the time from Central London to Heathrow to some 15 minutes and will include check-in facilities at Paddington....
8 Pages (2000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us