Our website is a unique platform where students can share their papers in a matter of giving an example of the work to be done. If you find papers
matching your topic, you may use them only as an example of work. This is 100% legal. You may not submit downloaded papers as your own, that is cheating. Also you
should remember, that this work was alredy submitted once by a student who originally wrote it.
There are certain factors that ought to be taken into consideration when designing a 10-storey sustainable building. These include the safety and sustainability aspects of the building. A sustainable building is one that promotes efficient use of resources such as water, materials, and energy while reducing the effects on the environment and human health throughout its lifecycle.
In the course of addressing this purpose, the report focuses on the assessment of the potential effects of climate change on buildings while elaborating adaptive strategies for building designs in accordance with the climatic conditions of Melbourne. From the report, it is critical to note that designers and city planners should focus on the adoption and implementation of green housing.
Preview sample
sponsored ads
Hire a pro to write a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
The quality of water sources for the recycled and reuse systems depends on the actual source of water. The sources of alternative water include treated wastewater, superficial groundwater, and stormwater. The 60L case is a commercial retrofit example that harvests rainwater for reuse and recycling. The system also contains onsite technologies that recycle black water and greywater.
The design and construction of buildings should also guarantee the easy escape of water following the subsiding of the flooding occurrence (Prasad & Snow 7). This requires the proper design of foundations and cellars. The positioning of the essential vulnerable equipment should also be as high as possible.
The provision of adequate fire safety measures in a shopping mall is critical since they are accessed by individuals from all walks of life. Research indicates that safety measures in shopping mass are inadequately provided; serious damages are likely to occur in case of a fire. According to Kachenje et al, most large shopping malls have insufficient facilities and fire control measures.
The fire broke in the Bashundhara city shopping complex at around 10 pm, after the firefighters had controlled the fire. The fire broke out on level six of the complex where 11 people were rescued while two others were injured. The cause of the fire remains unknown. The second case study involves the APARTMENT HOUSE (JAPAN GARDEN CITY) FIRE in the year 2009.
The surface floor is as well vital for the fire rescue mechanism. A huge floor as in the Minsheng bank building is key as it gives an immediate zone for assembling in case of a fire outbreak. There must be a protected place in the building for the staff and dwellers to assemble, called a fire assembly area, where everybody goes in case of fire.
The process sub-model is properly modeled as a plug flow because of the higher velocity of the fluid in the tubes. The flue gas sub-model is made up of a convective section and a radiative chamber both interlinked through a shield tube zone. The two sub-models are combined through the tube surface temperature.
Supports are the most important structural members of the bridge (Deng, 1423). Decks have to receive adequate support for a bridge to be functional. The supports have to be built inside the water which may be a complicated process. During the construction of the support columns, various aspects have to be considered and this includes the depth of the river and the soil type.
Materials that are better regarding quality while being lighter at the same time are now available. Such materials can withstand greater loads at reduced costs and increased workability during construction. The construction process is now much faster due to the introduction of a variety of heavy construction equipment that is not only efficient but also costs saving.
Apart from Tim and the two brothers, the organization has an additional civil engineer, three draftsmen, and two administrative staff. After a seven-year stint, Tim moved to Grand Star consultants which boast an international reputation with 45 qualified civil engineers. He was posted to the design section together with some other eight engineers and their supervisor was Fred Finkelman.
The paper has given an overview of the system explaining its functionality and system components. Communication between the components has been explained in the system interactions with the system context looking at some operational issues and aspects of the system. Some challenges of the system have also been highlighted.
The dynamics in helicopters are fully described and the engineering design consideration is given. All the avionics components are discussed including how they interact with each other. The technical, ethical, and other issues that surround the system have been given under the system context. The future challenges of the project have also been noted.
In these times of terrorists, advancement, and weaponry advancement the transportation system are not in the luxurious development, as science needs. In addition, national strategic planning efforts are required in these systems to enhance collaborative and cooperative modes of transportation system measures.
Training and educating workers are not sufficient methods of controlling risks. It is true that the workers may have the required knowledge concerning safety in the workplace but what requires to be done is to adopt better equipment, materials, and other substances which pose less harm to such workers. Personal protective equipment may fail with no warning.
Most conventional processes for treating wastewater have been using power estimation when calculating the power requirements for the treatment plant. Therefore, they have indulged in the use and application of renewable energy as the main source through which they can achieve maximum power at low operational cost.
The accident occurred in Singapore in a building that was in construction. At the time of the accident, the deceased and his co-worker were shifting the location ceiling rose at some pillar columns of the house under construction. It is during the process of terminating cables to a ceiling rose at one column (column C2309) when the deceased was electrocuted to death.
Looking at engineering aspects in terms of systems also allows for the identification of weaknesses, challenges, and problems so that they can be adequately addressed with a lot of ease. The natural gas power plants as an engineering system still require some improvements it their design and operation so as to enhance their efficiency as well as sustainability.
Project management refers to the application of experience, processes, skills, methods, and knowledge to attain the objectives of the project. A project in this case refers to a transient, unique endeavor, carried out to attain planned objectives that could be described based on benefits, outcomes, or outputs.
The calculation is aimed at evaluating the accuracy of the budget estimates, they also give insight into the right implementation plan. Projects are time-bound, they have a defined time frame within which they should be implemented, in order to have prior knowledge of when to commence and end the project, calculation of how long each activity takes should be carried out.
It is from the baseline that the braking performance of an autonomous vehicle is very crucial especially if the terrain and the surfaces are somehow ambiguous. Issues of wheel slippage have been for a long time been a nightmare to most designers with very minimal applicable solutions realized. This report comes up with a unique brake system model that applies the concept of feedback control.
The refinery is Australia’s largest crude oil refinery and offers fuel requirements for the majority of Western Australians and across Australia. BP Kwinana is considered one of the most contemporary refineries in the Southern Hemisphere after major upgrades and investments. BP Kwinana has implemented numerous process control systems that have led to cleaner fuel production.
The procedure is interdisciplinary in nature and integrates the knowledge of computer science and control engineering to industrial processes. A system of process control in engineering supervises the manufacturing environment and controls the flow and processes electronically or mechanically. Controls are undertaken at every stage as designed and set by the users of the system.
With the increase in waste disposal costs, it is wise to work on the maximization of waste efficiency by waste producers. Demolition, construction, and refurbishment, and processes for the supply of materials produce a considerable amount of waste. According to the UK government, the wastes are about 70 million tonnes.
It is evidently clear from the discussion that in the recent past, engineers have managed to develop techniques that are both cost-effective and time-saving. Coupled with proper management, this has resulted in projects being started and finished within literally weeks. Loughor Bridge is an example of such a project.
The main aim of this project is to construct a bridge across the Loughor River.
The fundamental objectives of this project will be;
To construct quality and durable bridge for transportation of people and goods;
To assemble a team of people and materials to deliver the bridge within the stipulated duration.
The Highway Act of 1980 endorsed by UK governments outlines the requirements and conditions that must be met in order to develop and construct highway designs which include bridges. The Active Travel Act 2013 of Wales developed by the National Assembly outlines provisions necessary for mapping active travel routes and other related facilities by the counties and the ministers of local governments.
In most cases, the topology of the land is the main determinant of the bridges that need to be constructed. This considers the stability of the terrain, the length of the bridge that needs to be constructed, and the Loughor Bridge Crossing will be constructed to help connect Cardigan with Swansea. The two locations are divided geographically by the Loughor River.
After all, procurement is interlinked with supplier networks that have in turn a greater impact on quality and related outcomes of the facility. The project management aspect of the bulk solids and powder handling facilities is equally important against the backdrop a fast-changing process engineering environment.
The branch that renders the building operational by providing essential mechanical and electrical services is called Building Engineering Services. Some of these mechanical services include provisions of air conditioning systems, ventilation, and heating while a subset of electrical services relates to power, lighting, and security.
A “state of the art” experimental piggery is required at the Dookie Campus site, which should be able to accommodate 100 sows in an “eco-shelter” piggery. The piggery is to be located near the Bush-land Reserve of the campus. The design of the piggery takes into consideration the total pig population considering the number of boars required and the average litter size.
The BITE is characterized primarily as passive fault management and diagnosis built into airborne systems to support the maintenance process. Another technology used for aircraft maintenance, its functionality is Analysis of failure monitoring results, Reporting & Memorisation of failures, Management of tests.
The research is centered on putting to bear legislation guiding construction as well as the set rules to eliminate deaths and loss of property resulting from the negligence of constructors. The paper will unearth health, safety, and welfare attached to building surveys. Building Surface Accessing is conducted and developing a survey reference system.
The author states that the competence of industrial engineers helps in serving and improving many corporate. It is also deemed a sign of urbanization, evolution, and prosperity. He is impressed with the field that is racing with the time in the product development and production operations.
Fire safety consists of precautions to ensure prevention of reduction of the possibility of the fire outbreak that may cause injuries, deaths, and property loss as well as alert those occupying the building that there is a presence of uncontrolled fire in case of an incident, allow those occupying the building to evacuate the affected areas and survive and to reduce damage to property (Ennals 2002).
The author states that back-up systems, as well as auxiliary systems, offer traditional heat moments when the solar system does not give enough space for heating. Under storage devices, liquid systems apply and do well considering the radiant heating systems. Other instruments include boilers that have radiators for hot water.
According to the findings of the paper, it can be said that the Construction (Design and Management) Regulations (CDM2007) replaced CDM94 or Construction (Design and Management) regulations 1994 and CHSW or Construction (Health, safety, and Welfare) Regulations of 1996. These guidelines are known as the Approved Code of Practice or ACOP.
The beauty of cities is important as it acts positively on population moral while the importance of urban aesthetics derives from the benefiting effects it has on culture. City planners need to keep in mind that aesthetics are important in developing projects that have long-term effects. Aesthetics is a common ground upon which to understand how cities perform.
The report aims at giving detailed comparisons between resilience and toughness for each of the test pieces. The report will also include a discussion of varies factors that have the possibility of affecting the experimental measurements. Tensile testing is a basic material science test that involves subjecting a sample to a controlled tension.
Within the buildings you require air movement to make sure that fresh air is provided to occupants, odour is removed, excessive moisture is removed, and condensation is prevented. Good illumination will ensure that natural daylight assist offer a feel good factor, and to prevent disorders for instance seasonal affective disorder (SAD)
The building is also expected to have a maximum occupancy level of approximately 3000 people. However, the number of the anticipated occupants is far much less and this increases chances of successful escape from the building in case of a fire breakout. Stairs connect within all floors and the building. Accordingly, this report will provide a fire strategy for the building.
56 pages (10005 words)
, Download 2
, Research Proposal
An increasingly popular aspect of classic channel rehabilitation is the integrated improvement of the channel's environmental characteristics as part of the overall rehab. Channel rehabilitation with integrated environmental improvements can include adjustment of the constructed channel alignment to mimic more natural conditions;
The risk differs depending on the contract. There can be two types of contract – lump-sum contract or the cost-plus-fee contract (Roxbury). The economic environment in two cases differs. In the lump-sum contract, work as defined and as required by the contract documents has to be completed within the contract time stated in the agreement.
39 pages (10159 words)
, Download 2
, Research Paper
Transparency must be exhibited by the company at all times. Companies must be responsive to the needs of the customers, who in the first place, are the top priority of Toyota company based on its guiding principles. Accountable officers must readily answer to the public any complaints brought to it due to product defects and other product-related issues.
It is a fact that human genetic engineering happens to be a very controversial and divisive issue. There are people who believe that the man has no right to interfere in the human genetic makeup. Yet, there are supporters of human genetic engineering who believe that genetic engineering can do much good to mankind.
13 pages (3607 words)
, Download 1
, Research Paper
Free
The engineer performs his duty as required. The mechanical engineer has alternative titles that reflect a specialty like Robotics Engineering or an engineering function such as Project Engineering or Consultant. Mechanical engineers are often defined by their high levels of innate curiosity about how things work.
As a reflection after studying mechanical engineering profession at BMW M Series company in-depth, one would be interested in making this career their future career. One reason that may interest one is the reputation that the company has gained for years. In recent years, BMW as a group as stood out to be one of the top companies to work at when it comes to the car industry.
Most Europeans are looking into plans of phasing out the existing nuclear plants replacing them with alternative sources of non-renewable energy. With the global world in concuss about the adverse effects that can be associated with nuclear energy, this sector has continued to witness a big slump in recent times and it seems to be like so in the coming years.
There is a huge shortage of licensed engineers as per an inter-departmental report of the House of Commons Environment. Despite the high standard of commensurate compensation plus is the dignity of aircraft airworthiness maintenance which has resulted in having one of the best safety records, is this persistent increasing demand.
Civil engineering involves the use of various equipment, machines, and computers. Civil engineering helps to establish a long-term development and maintenance of major infrastructure that caters to increases in world population and environmental infrastructure. It offers a variety of career choices in designing, constructing, teaching, research, and management.