Our website is a unique platform where students can share their papers in a matter of giving an example of the work to be done. If you find papers
matching your topic, you may use them only as an example of work. This is 100% legal. You may not submit downloaded papers as your own, that is cheating. Also you
should remember, that this work was alredy submitted once by a student who originally wrote it.
Just as visual layering finds use in cartography, engineers use the same principles to colour code information displayed on the computers in a manner that it sets a perceptual hierarchy. This results in the derivation of colour palettes in an order that matches the perceptual intention of the user.
There are significant buildings within the market in Hong Kong, which makes it a dire projection into the future. The Hong Kong client wants a state of the art model that can work through the times. The best way to go around all this is to look at better existing residential high-rise apartment towers and not coming up with a new green building.
Preview sample
sponsored ads
Hire a pro to write a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
To prove the functionality of a transformer protected by these means, various simulations are done using the SIMULINK/MATLAB environment, to indicate the generation of the tripping signal based on set algorithms that help in determining the appropriate behavior of the transformer. This is a useful means of avoiding cases of false tripping.
Suez Canal has its history drawn from Pharaoh’s reign making many people visit it and experience the use of Egyptian historical infrastructures, for instance, the pyramids. Suez Canal is also special to many people because of the nature of its plan; design and construction, which people believe contribute to its capability of quick service delivery in cargo handling.
In its engineering perspective, the complexity of the project and its expansive nature called for accurate engineering design and the correct choice of equipment and materials. Right from the commencement of the project, there were certain impacts that included eviction of residents, environmental destruction in terms of clearing forests, among others.
A wide range of materials was used during the construction of the building. It is also evident that the design of the tower is complex due to several structures in the building. It is also evident that the best engineering practices were used during the construction of the complex building. This is indicated by the fact that no serious challenges were reported in relation to engineering.
The location of the structure has also influenced its general pride. It is situated on the shore of Sydney’s harbor. Generally, it is the structural design of the structure that has made it outstanding when compared to other structures that were constructed using the same design such as the Mayan Temple among others.
By 2010, the building, which serves as an observation tower, houses a restaurant and used for broadcasting purposes, became the tallest building in the country even before it reached its full design height of 634 meters. The building reached its full height in 2011 becoming the second tallest building in the world trailing behind Dubai’s Burj Khalifa, which is 828 meters tall.
The uniqueness of the structure is also evident in terms of history and the engineering aspects. It is also evident that the structure has placed a mark in history as it became the tallest building in the world after its completion. On the other hand, it has also placed a mark in terms of engineering and construction for using a large amount of iron during its construction.
Pollution and wastes impact the environment differently based on the toxicity and the nature of the wastes. The following are some impacts of these wastes on air, soil, water, vegetation, and humans. The wastes make the air smell. In addition, wastes create acidification whereby the air reacts with the components creating components that may harm the buildings, animals, and humans.
The transient voltage surge suppressor is used to limit voltages between one point and another. This is made possible through the basic understanding of surge absorption and diversion. The voltage across insulations must be kept safe at all times and as seen in Kirchhoff’s law the surge current shall always flow in the direction of critical insulation.
For the experiment under consideration, the device consists of seven members for statically determinate situations and eight members for statically indeterminate cases as shown in the figure below. Various points of the truss can get subjected to varied loadings and the resultant measurements of strains, forces, and deformations from different members recorded.
As per the user requirements, the 5 Series has the greater engine power, high, rigid aluminum body, smooth and covetable design that provides a hi-tech user experience. Consequently, its contemporary technology design ensures the best and most comfortable interior environment for the driver and passengers.
Before the data analysis was conducted the group drew two graphs comparing the true strains to the experimental strain of two members from the truss as shown in graphs one and two. The members were members of and member four. From the graphs, we can see that there is a difference between the recorded strains and the true strain.
Clearly, psychology has been an outstanding factor to evaluate much in some areas of civil engineering. The managers under the contract should nevertheless involve the role of the human in the whole exercise. Therefore the know-how and the awareness of psychology should be by default be part and parcel of the cultural fabric of all civil constructions e.g. the sports stadium.
The project involved an additional 221 check-in counters. This was to be complemented by an automated baggage handling line which is 9 kilometers in length. Through the use of gates, the need for buses in boarding airplanes was eliminated. The terminal connects to a cocoon-shaped concourse which has a complex architecture.
The information provides details of how the concepts of availability, reliability, maintainability, and safety assessment affect the system. The combination of the factors is also useful in enabling the organizations to reduce the risks that are associated with a systems failure. Different techniques for analyzing the system have also been described in the article.
A truthful sign is a variable signal chronic in on every occasion and plentifulness, which is for the maximum element passed on using the technique for the usage of equalization.
Electric shock was found to be the most serious health risk facing workers in the section. This is particularly because, despite the high voltages used in the section, there is currently no sufficient personal protective equipment to protect the workers from injuries related to electric shock and other welding hazards.
The transfer function facilitates the utilization of MATLAB in establishing the root locus of the system more precisely and with additional parameters incorporated in calculations. RVSL shaft sets the nominal mode utilized in the first experiment where there is no friction within the shaft. The shaft is set to model 1 by this experiment.
The results thus obtained were observed as the summated value of the angles, the design points for the lead compensated poles and zeros, although excluding Pc. The compensator pole requirement was accordingly identified at the angular contribution value, denoted with the difference of the obtained results with 180 degrees.
The paper 'Use of Composite Materials in Mass Production" is a good example of engineering and construction coursework. Composite materials refer to composition materials either naturally occurring or engineered materials comprising of one or more constituent dissimilar materials with varying physical and chemical properties that remain distinct and separate at either microscopic or macroscopic scale within the structure of the final material.
9 pages (2892 words)
, Download 1
, Literature review
Free
The paper “System Thinking Engineering and Its Application in Saudi Vision 2030” is a thoughtful example of the literature review on engineering and construction. Systems thinking are an integral concept in the engineering discipline especially among the systems engineers by providing a vital intellectual underpinning. The concept was established in 1956 by Professor Jay Forrester.
The paper "International Engineering Management - Vietnam TNA " is a good example of an engineering and construction case study. Companies employ different methods to grow and dominate the market. The acquisition is one easy and very stable method of expansion and market domination. This is because most acquired companies are already strategically located and the process only needs improvement techniques.
9 pages (2658 words)
, Download 1
, Research Paper
Free
The paper “Causes of Failures in Large Construction Projects ” is an outstanding variant of the research paper on engineering and construction. The construction industry plays an important role in the growth of a country both economically and socially. Construction provides necessary infrastructure such as schools, roads, and other basic facilities.
The paper “Automotive Production Line - Engineering Management Project” is a convincing variant of the presentation on engineering and construction. Simio software is a tool that is used in designing a country production line for a product. The design of a production line layout for chassis fabrication will help off-road buggies producer schedule process and design the chassis in an easier way.
The paper "Engineering Management - Construction of a Footbridge across Hughes Highway" is a perfect example of an engineering and construction case study. This report is an in-depth analysis of the management process in the construction of a footbridge across Hughes Highway. It details the whole process from a management point of view.
The paper "Engineering Management - Timor Leste Engineer without Border Project " is a good example of an engineering and construction case study. This report is about an energy project undertaken by EWB under the EWB challenge in Timor Leste. Plan Timor Leste and EWB collaboratively identified power supply as being one of the areas which were in need of growth within Lautem in Timor Leste.
The paper "Construction Procurement Methods" is a good example of engineering and construction coursework. Morledge & Smith (2013) defines procurement as the whole process of acquiring materials or goods from third parties (inclusive of logistical aspects). It also refers to overarching functions that describe the processes and activities to acquire services and goods.
The paper "Kitchen Renovation" is a good example of an engineering and construction case study. In January 2013, a fire broke out in my kitchen after somebody left it on overnight. The fire started from the toaster and spread to the curtains, at which point the flames engulfed the entire room. The fire had just consumed the entire kitchen when my family and I were able to smother it.
8 pages (2414 words)
, Download 0
, Research Proposal
Free
The paper "Safety in a Building" is a good example of an engineering and construction research proposal. Renovation project meetings or facility designers are facing a relatively new concept popping up during discussions regarding fire safety and it is about performance-based design. This phenomenon is now commonplace as facilities ingrain special features to attain aesthetic, functional and cost objectives.
The paper "Melbourne Federation Square Project " is an outstanding example of engineering and construction case study. This project report seeks to explore the project management issues that arise within the course of implementation of a project. I chose to examine the Melbourne Federation Square project in particular because it is an indigenous project that sparked a lot of public interest.
The paper “Factors to Be Considered When Making Decisions on the Materials to Be Purchased” is a persuasive variant of the term paper on engineering and construction. The paper gives an insight into two scenarios of constructions project to be undertaken and give the necessary recommendations on the type and nature of the materials to be used in the construction process.
The paper “Pre-Construction Report of Pedestrian Foot Bridge” is an earnest variant of an engineering and construction case study. A footpath bridge is a very essential structure in human movement. Pedestrian or Footpath Bridge is a bridge that is designed for use of pedestrians (Romualdez, 2012).
The paper "Risk Analysis in Construction Projects" is an outstanding example of engineering and construction coursework. Construction work can be perceived to generally encompass any work that is undertaken which is directly linked to the construction, conversion, maintenance, renovation, demolition, fitting-out, commissioning, decommissioning or dismantling a structure.
The paper "Energy Efficiency of the Design of Buildings" is a decent example of an Engineering and Construction assignment. Managing the building process to make sure the dwelling is built in accordance with the approved plans is important to ensure effective outcomes. Engaging the most appropriate ‘expert’ with required qualifications, experience, and licensing/accreditation is important.
The paper "Effect of Energy Efficiency Rating on House Pricing" is a great example of an Engineering & Construction essay. When measuring the energy efficiency rating of a house there is an allocation of point scores for different design features. The design feature which includes the building fabrics, window design, and orientation enables a rating ranging from 0 to 10 to be applied.
The paper "Tilt-up Concrete Construction" is a great example of engineering and construction coursework. Tilt-up construction involves a ready mixed concrete that is placed in horizontal forms at the site of construction where it is then tilted up to form walls. The concrete floor slab of the building is the most preferred casting base in the building structure.
The paper "Application of Structural Principles to Residential Low-Rise Constructions" is a wonderful example of an assignment on engineering and construction. It is necessary for the demolition to be as per the set requirements and following all the safety procedures. The foremost step in the building demolition procedure is the application of the demolition permit.
The paper "Life Cycle Costing and Risk Management" is a wonderful example of an assignment on engineering and construction. The term buildability alludes to all pre-construction activities or exercises in designing all the tasks. This is on the assessment of quality, time, safety performance, and also the cost elements of construction.
The paper "Main Trends in Mechanical Engineering" is an outstanding example of engineering and construction coursework. Mechanical engineering career deals with construction, designing and working with machines. The career is hence diverse and is continually becoming sophisticated with advanced technology.
The paper "Promotion of Closed Systems Rather Than Opens Systems of Procurement in the Construction Industry" is a good example of engineering and construction coursework. The importance that is placed on procurement systems cannot be taken lightly as it is believed that good procurement goes hand in hand with successful projects.
The paper “The Site Suitability for a Tall Building and a High-Quality Design” is a thoughtful example of the presentation on engineering and construction. To come into conclusion some of the building's considerations to consider are 203 Ribbleton Lane, Ribbleton. This is property is located in Ribbleton Lane, 1 mile from the Preston. It has a ground floor and is a location suitable for the retail section.
The paper "Liquidated Damages Are Very Essential in Construction Law " is a perfect example of engineering and construction coursework. Liquidated damages are very essential in construction law as it reduces the conflicts between the owner and the contractor. Liquidated damages are the costs given to a party who has been injured upon breach of a contract.
6 pages (1868 words)
, Download 0
, Research Proposal
Free
The paper "Field Modeling: Computational Fluid Dynamics" is a perfect example of an engineering and construction research proposal. I express my sincere gratitude to my school for allowing me to conduct the research. My sincere thanks go to my professor for his guidance and suggestions in the completion of this project.
The paper "Liquidated Damages Clause and Its Validity" is a great example of engineering and construction coursework. Damages and liquidated damages are both legal terms used when signing the contracts. Damages can be explained as the sum of money mentioned in the contract where the victim is expected to pay in case they breach their contract.
The paper "Liquidated Damages Clause " is a good example of engineering and construction coursework. According to the assumption by law and economist scholars, human beings are rational wealth-maximizers and those individuals can decide to breach a contract when the legal remedy for breaching a contract is associated with expectation damages (Wilkinson-Ryan, 2010).
7 pages (2088 words)
, Download 0
, Research Proposal
Free
The paper "Knowledge of the Behaviour of Fires" is an outstanding example of an engineering and construction research proposal. Though fires are never a desirable thing in buildings this does not prevent their occurrence and when they occur often will result in injuries, death and property being lost [1]. It is due to this that the fire community has increasingly paid attention to addressing this issue.
The paper 'Advantages and Disadvantages of Using Load Bearing Masonry" is a perfect example of an engineering and construction assignment. The load-bearing masonry is solid and durable. The stones or bricks are very strong, making this form of construction strong. There is also the use of reinforced concrete and steel making it extra strong.
The paper 'Construction of Commercial Building on a Brownfield Site' is a great example of an Engineering and Construction Case Study. The following report seeks to analyze some of the measures to be taken in the construction process of a six-story commercial building by the Algazal Construction Company. The building is being set on a site.