StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Dundee Tramway Project Analysis Engineering and Construction Case Study
10 pages (2635 words) , Download 1 , Case Study
Free
Widely means of transport in the city is road transport mostly because the city is largely populated by a poor population (the City Council Plan 2012-2017). Thus the city is solely responsible for the management and development of the road transport system and in particular the bus system. The committee in charge of these developments is the Roads and Transportation Division of the Council.
Preview sample
Systems Engineering Principles for Unmanned Aerial Vehicle Engineering and Construction Coursework
14 pages (3803 words) , Download 0 , Coursework
Free
An Unmanned Aerial Vehicle (UAV), as the name suggests, is a specialized type of aircraft that does not require the pilot to be in the vehicle during operation. It is also referred to as Unmanned Aerial System (UAS) or more colloquially as ‘drone’. The vehicle is controlled remotely by human operators or autonomously by onboard supercomputers.
Preview sample
sponsored ads
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Ship Propulsion and Ship Manoeuvrability Engineering and Construction Assignment
9 pages (2806 words) , Download 0 , Assignment
Free
The class 3 equipment is more advanced and it can withstand a number of failures without losing direction. This includes flooding or fire at the watertight compartment. Currently, a computer program has the ability to generate mathematical models that are used for providing useful information about dynamic positioning.
Preview sample
Fabrication and Welding Technology for Mechanical Engineering Engineering and Construction Assignment
15 pages (4284 words) , Download 1 , Assignment
Free
Depending on the nature of the structure, the configuration of the various parts vary. For parts that require a square-shaped outcome, square butt welding will be desirable. Therefore, the type of weld joint desirable for a particular task is highly dependent on the joint configuration (Squillace et al. 2004).
Preview sample
Health and Safety: Welding in UK Engineering and Construction Coursework
16 pages (4202 words) , Download 0 , Coursework
Free
Welding is one of the most dangerous occupations. It involves fusing together two materials using heat from energy sources such as a gas flame, friction, an electric arc, an electron beam, a laser, and ultrasound. All of these methods pose equally hazardous risks not only on the welder but also his or her environment.
Preview sample
Ship Design and Construction Engineering and Construction Coursework
16 pages (4109 words) , Download 0 , Coursework
Free
The most important phase in the overall construction process of a ship is determining the main dimensions, because various characteristics of the ship such as power requirements, economic efficiency, hold capacity, as well as stability, are decided by its main dimensions. The main dimensions of a ship include width B, length L, depth D, and draught T.
Preview sample
Welding Technology for Mechanical Engineering Engineering and Construction Assignment
11 pages (3061 words) , Download 0 , Assignment
Free
It is easier and cost-effective to control welding distortion during the welding process than performing post-welding rectification. When the weld metal and HAZ expand and then contract rapidly, distortion occurs (Lincoln Electric 2016). One technique for controlling welding distortion is through sequence welding.
Preview sample
Health and Safety at the Workplace Engineering and Construction Coursework
19 pages (5339 words) , Download 0 , Coursework
Free
Risk assessment is the process that involves the identification of the hazards at the workplace followed by analysis or evaluation of the risk associated with the hazard and finally, determining the right methods to control the hazard. The process requires the employer to conduct a thorough assessment of the workplace.
Preview sample
Pneumatic and Hydraulics Engineering and Construction Assignment
12 pages (3024 words) , Download 0 , Assignment
Free
Speed control of a hydraulic cylinder is accomplished using a flow control valve. A flow control valve controls and regulates the speed of the cylinder by controlling the flow rate to and off the actuator. When the directional monitored valve is actuated to the 1st position, oil flows through the flow control valve to extend the cylinder.
Preview sample
Ship Propulsion and Ship Maneuverability Engineering and Construction Assignment
9 pages (2581 words) , Download 0 , Assignment
Free
The dynamic positioning classification illustrates different classes and it is based on the IMO standards. According to the classification, equipment class 1 does not have redundancy. The loss of position is may also occur in the event of a single fault. However, equipment class 2 has redundancy which enables it to experience system failure in case of a fault.
Preview sample
Naval Architecture Engineering and Construction Coursework
14 pages (3653 words) , Download 0 , Coursework
Free
With modern technology, the construction of the ships is taking a different dimension with a major focus on the designs and methods of reducing the forces and stress which are likely to cause sinking and overturning of the ship. The paper also undertook a deep analysis of the various parts of the ship and their functions.
Preview sample
Health, Safety and Risk Assessment in Engineering Engineering and Construction Coursework
13 pages (3282 words) , Download 0 , Coursework
Free
It also helps to reduce accidents and illnesses that inflict significant costs. It is also done to comply with health and safety authority regulations, which demand that organizations undertake a risk assessment to reduce employees’ risk exposure. Lastly, it is done for moral and ethical reasons, as it would help reduce illnesses and injuries to employees.
Preview sample
Hall Effect Tachometer Engineering and Construction Report
5 pages (1495 words) , Download 0 , Report
Free
The tachometer is to be assembled by use of an Arduino LCD unit and Uno R3 DAQ and breadboard. Here, the Arduino library code will be utilized by the Arduino and wiring standards so that it will be interfaced with the LCD display unit as result, it will simplify the programming assembly. Figure 2 shows the schematic circuit of the Hall Effect Tachometer.
Preview sample
System Engineering Principles for Air Deployable Amphibious Vehicle Engineering and Construction Term Paper
23 pages (6431 words) , Download 2 , Term Paper
Highly capable systems have specific requirements, which all have to be fitted into a single vehicle and work seamlessly as one system. Therefore, integration of these capabilities is very crucial so that the vehicle can fulfill the requirements of the ADF without excessive modifications to the original design of the ADAV.
Preview sample
Design of Pneumatics & Hydraulics Circuits Engineering and Construction Coursework
16 pages (4046 words) , Download 0 , Coursework
Free
One of the elements that will make up this circuit is the emergency stop valve. This valve will be tasked with the role of preventing the door from reaching the closing position together with the latching emergency stop palm button valve.  On realizing the latched stop palm button, the state of the door will not alter.
Preview sample
System Engineering Principle Engineering and Construction Term Paper
24 pages (6397 words) , Download 1 , Term Paper
The ADF will be seeking to acquire operational merits through the validation and verification of its capabilities. The capability components are usually expected to take the center stage when it comes to technical feasibility. To that extent, the deployment and actualization of such capabilities are often faced with significant threats and risks of various natures.
Preview sample
Engineering Project in Mayukwayukwa Engineering and Construction Case Study
7 pages (2035 words) , Download 0 , Case Study
Free
Mayukwayukwa is a refugee camp located in Kaoma. It is one of the oldest refugee camps and is a predominantly rural settlement. The project aims to design a playground and recreational facility for children using locally available materials in Zambia. The recreational program will be started with the help of the local people in construction. 
Preview sample
Selection between Four Metals Whose Mechanical Properties Have Been Determined through Tensile Test Engineering and Construction Report
9 pages (2326 words) , Download 0 , Report
Free
The elimination method will be used in selecting the desired metal. Metal A and metal B fail to satisfy the property of the ability to deform inelastically. From the above curve, these two metals have low values of elongation before failure, which means that they will easily fracture when a load is applied. They have low ductility levels.
Preview sample
Replacing the Conventional Palletisation Methods Engineering and Construction Research Proposal
12 pages (3563 words) , Download 0 , Research Proposal
Free
The main focus of the research will be the collection of data regarding the aspects of technology, use and limitations of the robots. The qualitative analysis will ensure that new information is obtained about the technology, sue and limitation of the robots. This is considering that new information can only be generated through the use of qualitative analysis concepts.
Preview sample
Applications Of Pneumatic And Hydraulics Engineering and Construction Research Paper
20 pages (5105 words) , Download 0 , Research Paper
Free
The goal of fluids power standards is to give precise test procedures for assessing the reliability of the pneumatic pressure regulators by employing different test conditions and calculation methods from ISO. This standard is applicable in the remote- piloted pressure regulators and in the manually adjustable regulators.  
Preview sample
The Legislations Governing Health and Safety within a Workplace Based on the United Kingdom Engineering and Construction Report
19 pages (6717 words) , Download 1 , Report
Free
Protection of the welders from the fumes is important. Loose connection or bare wires involved with the interconnection of welding equipment may subject the welders and other personnel within the welding facility to risks of electric shock. Improper earthing during connection will also result in a higher risk of electric shock.
Preview sample
Rosswalk Safety Engineering and Construction Case Study
6 pages (1717 words) , Download 0 , Case Study
Free
Engineers need to ensure that they apply and make use of all available literature and theory to come up with structures with adequate design. This report sets out to give a summary of the case study; a discussion of how the existing problem was solved as well as a discussion of the role that social responsibility plays in the engineering practice.
Preview sample
Fluid Flow Measurements Engineering and Construction Lab Report
6 pages (1576 words) , Download 0 , Lab Report
Free
Incompressible fluids such as water are of major interest to engineers. This is because they are utilized in all manner of applications and understanding their behavior is a necessary prerequisite. One of the main characteristics of these fluids is flow patterns. This is described in terms of discharge, the rate at which a fluid such as water flows through a section.
Preview sample
Ship Design and Construction Engineering and Construction Report
11 pages (3148 words) , Download 0 , Report
Free
The bottom shell may require a transverse or longitudinal framing depending on the size of the ship. A longitudinal type of framing is preferred in the case where the ship in question is a larger one. It is preferred, as larger ships are known to carry so many items. The bulky nature maybe because of having many passengers on board and cargo.
Preview sample
Simple Coastal Modelling Engineering and Construction Math Problem
9 pages (2463 words) , Download 0 , Math Problem
Free
The models adopted in wave prediction should be able to accurately predict the magnitude of the wave, water velocity, and consider surface elevation to determine the safety coatline for humana activity and settlement.
Preview sample
Systems Engineering Principles Engineering and Construction Assignment
17 pages (4368 words) , Download 1 , Assignment
Free
There has been a spike in security threats to the nation in the recent past due to the onset of terrorism activities in various parts of the world, increasing the need for the improvement of the security apparatus. The increased threat has pushed governments’ defenses from the traditional bi-polar strategies to a global perspective in their defense strategies in order to effectively deal with the diverse and increasingly advanced warfare.
Preview sample
Los Angeles Abrasion Test And Impact Test Engineering and Construction Essay
7 pages (1105 words) , Download 0 , Essay
Free
Aggregates used on highway surface pavement are subjected to impact and abrasion due to traffic movement. Thus, the road aggregate has to be tough to resist disintegration due to impact and abrasion. Both abrasion and impact of the pavement aggregates were determined in this experiment. The two tests have given us the values used to determine the properties of the aggregate pavement.
Preview sample
Health, Safety And Risk Assessment In Engineering Engineering and Construction Assignment
13 pages (3440 words) , Download 0 , Assignment
Free
Task 1: Identify industrial work areas where current regulations would arise and describe the role of the HSE inspectorateYou are monitoring for health and safety purposes a team of welders who have to undertake welding repairs to a coastal tanker. There are specific pieces of health and safety legislation that is applicable to all employees, undertaking welding on board a coastal tanker.
Preview sample
Use of Information Technology in Cleaner Production Engineering and Construction Research Paper
13 pages (3694 words) , Download 0 , Research Paper
Free
Manufacturing plants are among the main contributors to environmental degradation (Schoenherr, & Talluri, 2013) and thus they need to take measures towards improving their performance towards nature conservation. The fight towards industries maintaining ecological sustainability is hindered by the vast growth in the world’s population.
Preview sample
Building Management System Engineering and Construction Term Paper
11 pages (2851 words) , Download 0 , Term Paper
Free
The building management system is essential in ensuring all the facilities required in the building are provided. These systems include lights, escalators,s and moving walks to ease transport and communication within the building. The lighting systems are also essential to ensure the building has light depending on the customers’ demands.
Preview sample
Types of Elevators and Escalators Engineering and Construction Essay
6 pages (1642 words) , Download 1 , Essay
Free
Hydraulic elevators are often supported by a piston at the bottom. The piston pushes the elevator up from one floor to the other. Hydraulic elevators travel at a speed of two hundred feet per minute. There are two types of hydraulic elevators. The first type is holed hydraulic elevators which have a sheave extending below the elevator pit.
Preview sample
Two Pinned Arch Experiment Engineering and Construction Lab Report
6 pages (1908 words) , Download 2 , Lab Report
Free
By resolving the external forces it is subjected to compressive stresses, and in turn, eliminating tensile stresses, arches have found common application in structures requiring long spans, most notably bridges. This process of resolving forces to compressive stresses is referred to as arch action (Vaidyanathan & Perumal, 2004). When a load is applied at the top of the arch, it pushes outward at the base, referred to as thrust. As the load at the top increases, the arch tends to flatten out, resulting in more thrust at the bases.
Preview sample
Treatment Of Indigenous Australians Engineering and Construction Report
6 pages (1594 words) , Download 4 , Report
Free
Fair completion should exist between engineers. Unlike the racism that was experienced by the aborigines and their colonizers. All engineers are expected to uphold and enhance honor, integrity, and also dignity in such a manner that they uphold the engineering profession properly by not tolerating bribery, fraud, and corruption.
Preview sample
Information Technology and Cleaner Production in the World Trade Organization Engineering and Construction Essay
15 pages (4145 words) , Download 0 , Essay
Free
The organization has its headquarters located in Geneva, Switzerland. The group was created by members from both developed and developing countries where most of its members are the developing countries. The group started with different aims, creating fair and transparent trade around the world. It is also working towards settling disputes that arise in trading activities among the countries.
Preview sample
Information and Technology in Cleaner Production Engineering and Construction Research Paper
16 pages (4148 words) , Download 0 , Research Paper
Free
VHSP Pty Limited owns a tanning plant is constructed in 1987 that uses the Sirolime process that delivers important enhancements in the protection and performance of the environment over certain conventional processes. The company undertakes chrome tanning of the cattle hides. Additionally, about 85 percent of the produced hides are considered green by the abattoirs while 15 percent remaining to be salt preserved.
Preview sample
Reynolds Experiments Engineering and Construction Lab Report
8 pages (2076 words) , Download 0 , Lab Report
Free
These range from construction activities; irrigating farmlands, and even for household needs. It is, therefore, necessary to have an extensive understanding of how it will behave under certain conditions. With such knowledge, the engineers can be able to effectively design the distribution systems that will satisfy all conditions of flow.
Preview sample
Treatment of Indigenous Australians over the Last Century Engineering and Construction Research Paper
6 pages (1680 words) , Download 1 , Research Paper
Free
As mentioned in the paper, Indigenous Australians have experienced different forms of discrimination, segregation, sexual abuse, and exploitation. In consequence, most of them were left socially economically disadvantaged, homeless, with no land, and education. Some of them are physically and mentally challenged.
Preview sample
Analysis of Forces and Strains in a Truss under Controlled Loading Done Using a Specialized Machine Engineering and Construction Coursework
9 pages (2623 words) , Download 1 , Coursework
Free
The good correlation in this comparison is a clear sign of the efficiency of the experimental method. The comparison between the statically determinate and statically indeterminate trusses has also depicted the importance of using both structures as well as the desirable properties of each truss arrangement. 
Preview sample
Multi-Stage Flash Desalination Plants Engineering and Construction Literature review
8 pages (2540 words) , Download 0 , Literature review
Free
For some decades now, multistage flash desalination (MSF) and reverse osmosis (RO) have turned out to be a feasible, sustainable as well as an economical source of freshwater across the globe. Multi-Stage Flash Distillation is widely utilized for seawater desalination, but because of the large scale and complex nature of such plants, there is a need to improve their operational reliability under heavy and continuous loads as well as their efficiency.
Preview sample
The Treatment of the Indigenous Australians in the Last Century Engineering and Construction Research Paper
6 pages (1610 words) , Download 0 , Research Paper
Free
I have found it necessary to integrate the interests of these individuals into the engineering researches conducted within their locality. In addition, I would endeavor to work in environments that draw me close to these communities. I have learned that it is important to consider the contemporary realities of the Torres Strait Islanders and the Aboriginals Australians.
Preview sample
Humes Company: Engineering Innovation and Ethics Perspective Engineering and Construction Essay
12 pages (3790 words) , Download 0 , Essay
Free
The company continues to improve its products and customer-based services based on the requirements of the clients. The solutions produced are for traffic management, detention, and reuse, water treatment, pipeline systems, retaining walls, shafts and tunnels, rail and road infrastructure, platforms, and bridges.
Preview sample
Applications of Pneumatic and Hydraulics Engineering and Construction Assignment
14 pages (3903 words) , Download 1 , Assignment
Free
From the international standards ISO, 1219 – 2 various regulations should be followed when making drawings for Pneumatic and Hydraulic to be used for human activities. These regulations are meant to assist in having a standard system for the safety of users. Some of the requirements are; • Pneumatic and Hydraulic drawing should conform to ISO 1219 – 2. • All the components in the drawing should be according to the symbols recommended by the standard.• All components should be named.
Preview sample
Solar Powered Wanter Pump Engineering and Construction Literature review
14 pages (2932 words) , Download 0 , Literature review
Free
The authors utilized the LC-filter to eliminate the harmonics so as to obtain a pure sine wave that can be utilized directly to drive a pump system as well as a single-phase induction motor. The experimental analysis conducted by [ HYPERLINK \l "KBR13" 1 ] offers a design of a solar water pumping system that is powered by PV panels and coupled with full-bridge SPWM inverter, centrifugal pump, LC filter, induction motor, and DC to DC Boost converter.
Preview sample
Condition Monitoring and Fault Diagnosis Engineering and Construction Assignment
16 pages (4120 words) , Download 0 , Assignment
Free
Availability of the equipment documentation is very vital for robust fault finding techniques. The following are the types of documentation that should be made available to help support fault diagnosis and fault location. These types of drawings show the piping of the equipment. They can be used to locate the faults since one is able to understand the general outlook of the equipment.
Preview sample
Engineering Project Management Engineering and Construction Research Proposal
6 pages (1686 words) , Download 1 , Research Proposal
Free
The proposed new station will collect data for Wind speed, Air pressure, Precipitation, Temperature, Humidity, Rainfall, Seismological Activity, Land movement, and Groundwater table. We endeavor to deliver the delivery, install, test, verify operationally, and provide maintenance documentation for all components required by the station.
Preview sample
The Analysis of Condition Monitoring and Fault Diagnosis Engineering and Construction Essay
12 pages (3048 words) , Download 0 , Essay
Free
Drawings help determine possible fault points. General arrangement drawings are one such document. From the drawings of the arrangement, the surface nature, joints, weight bearers, and force balances can be determined easily, rotators and possible places of stress concentration can be easily located and analyzed. Electrical drawings are the other important drawings in fault diagnosis.
Preview sample
Digital Telephony Investigation and Time Division Multiplexing Engineering and Construction Case Study
7 pages (2179 words) , Download 0 , Case Study
Free
Murder and assault suspects may, through a court order, have their email and Internet exercises dissected to discover proof about their thought processes or concealing areas. Enterprises research PCs when a representative is associated with unapproved activities. Extortion examinations gather exchange history proof from servers.
Preview sample
The Dynamics of a Standard Commercial Ship under Loading Engineering and Construction Research Paper
15 pages (3989 words) , Download 0 , Research Paper
Free
Sagging normally occurs when the total weight of the ship under consideration at its mid exceeds the buoyancy. Sagging also occurs when the wave through the mid of the ship under consideration sags. Sagging can be explained by the concept of a beam supported at both ends and its loading is done at its mid-length.  
Preview sample
Condition Monitoring and Fault Diagnosis Examination Engineering and Construction Assignment
20 pages (5152 words) , Download 0 , Assignment
Free
Equipment documentation and records are an essential part of the quality system. It is important to identify the policies and procedures for equipment and plant maintenance and define them as inappropriate documents. Keeping good records of equipment will enable problem evaluation as they arise. Incomplete or missing equipment documentation results in legal consequences as stated in the warranty and criminal law.
Preview sample
Concept of Operations and System Specification Engineering and Construction Essay
8 pages (2185 words) , Download 1 , Essay
Free
The elements may have an influence on one another either in a direct manner or an indirect manner as each seeks the maintenance of the system's activities with the intention of realizing a given objective. For instance, all the systems have with them both input and output mechanisms despite them operating in ever-changing environments. That said, the instance of the capability may mean the capacity, quality, or ability to realize a given operational effect.
Preview sample
451 - 500 results of 5601 items
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us