Use of NRA and CESMM3 Methods in Civil Engineering Measurement Engineering and Construction Assignment
7 pages
(1524 words)
, Download 3
, Assignment
The main activities include: Excavation, Dredging, Filling, Compaction, Disposal, and Landscaping. Activities excluded are excavation for: Ground excavation; Diaphragm walls and ground anchorages; Pipes and sewers, manholes, trenches and ditches, pipe headings, thrust boring, and pipe jacking and jointing; Piles; Foundations for traffic signs.