StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Cite and Correct Using Risk Assessment - Assignment Example

Cite this document
Summary
What is the hazard? What could go wrong? Think in terms of "What ifs?" or “What could happen?” In this section, you are to describe a situation(s) and discuss what could happen (2pts).
Most building lobbies usually…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97% of users find it useful
Cite and Correct Using Risk Assessment
Read Text Preview

Extract of sample "Cite and Correct Using Risk Assessment"

Download file to see previous pages

zards as they can hit employees and injure them badly, that is in case they are opened while an employee is walking towards the point where the gate or door is swinging moving. The dust, gas, vapor and fumes produced are hazardous as they may damage parts of the body exposed to the substances. This may cause burns. Additionally, the chemicals may attack some organs, for example the lungs or liver, when the body absorbs some chemicals. An employee may touch bare wire, equipment that ungrounded properly or wet surfaces, which may lead to the employee being shocked.

This may cause burns especially when the clothes are get fire. This may even lead to death. Some machinery reduces the levels of oxygen and this is hazardous to anyone in around as it may lead to suffocation. Employees deprived of oxygen for long periods may lead to brain damage and in extreme scenarios, death. For the walking work surface, any person entering the company is at risk. This is because any one can fall and get hurt since everyone is using the same polished floors. Additionally, doors swinging while being opened may hit anyone.

Every single individual in the company is at risk of exposure. This is because the chemical produced, dust, gas, vapor and fumes, not excluding the noise, radiation and extreme temperatures, will not spare anyone. However, those people who spend more time in the company are more at risk than the visitors due to longer periods of exposure are. Everyone in the company is at risk in case the oxygen levels are low. This is because everyone needs oxygen and nobody will be spared. This also includes hazardous chemicals increasing to levels beyond the Permissible Exposure Limits.

Impacts = the risk is only localized to the polished floors and the risk only increases when the floor is wet. Slipping may cause injuries but the probabilities of the injuries being serious are quite low. Impacts = the risk is only localized to a specific door being opened while an individual

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Cite and Correct Using Risk Assessment Assignment - 2”, n.d.)
Cite and Correct Using Risk Assessment Assignment - 2. Retrieved from https://studentshare.org/engineering-and-construction/1666604-cite-and-correct-using-risk-assessment
(Cite and Correct Using Risk Assessment Assignment - 2)
Cite and Correct Using Risk Assessment Assignment - 2. https://studentshare.org/engineering-and-construction/1666604-cite-and-correct-using-risk-assessment.
“Cite and Correct Using Risk Assessment Assignment - 2”, n.d. https://studentshare.org/engineering-and-construction/1666604-cite-and-correct-using-risk-assessment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Cite and Correct Using Risk Assessment

Auditing & Insurance services

(a)This organization has taken measures to introduce diversity into its operations and because it is a public body, its annual reports are freely available over the Internet and were easily accessible; therefore they were easily available for research purposes. (b) The Council… lso has an audit committee working with the Council, for purposes of providing a supervisory framework for its audit activities, to review audit reports and critically analyze any issues relating to risk management and internal controls....
16 Pages (4000 words) Essay

Health, Safety and Welfare for Construction and the Built Environment

However, there is a risk that the items may fall which can cause injuries among the employees.... By using the standard form, we can compile the data as our requirement.... By using standard form to identify and record hazards, we actually make this data...
7 Pages (1750 words) Essay

Owners Perspective During Preconstruction

n order to settle on a more suitable contingency, use of a quantitative risk assessment is encouraged.... Nevertheless, risk assessment has been mainly ignored for larger projects as a part of the approximating process in addition to the development of the budget.... risk assessment is currently getting more popular; it is being talked and considered a lot more than it was in the past.... Because of to either the tactic or the owners financial limitations on costs of pre-construction, counting the necessary manpower to dedicate to apparent non-critical tasks, the teams in addition to procedures are out of place to build up incorporated design-estimate-schedule-risk assessment....
2 Pages (500 words) Essay

Information Security Risk and the Possible Threats to Information Security

The paper describes information security risk as any danger that may lead to the loss or damage of information.... They can be transmitted from one computer to another through various methods that include and not limited to downloading materials from infected sites on the internet and using infected removable storage devices....
7 Pages (1750 words) Research Paper

Water Treatment Plants and Disinfecting Water: Uses of Chlorine

Guidelines set forth for water treatment professionals illustrate the process of using chlorine gas in a treatment plant (Kerri, 1989).... The paper describes chlorine that has a variety of uses in a water treatment plant.... It is used on water intake structures for the removal of aquatic organisms; as pre-filtration to oxidize metals such as iron and manganese for removal; to kill algae and bacteria....
8 Pages (2000 words) Research Paper

City Risk Assessment: Charlotte, NC

The paper shows the risks related to a particular city in the US: Charlotte, NC.... The city's location and population demographics are presented since they can influence the city's vulnerability to certain hazards.... In general, the exposure of the city to risks can be characterized as of average level....
6 Pages (1500 words) Case Study

Small Chemical Plant Risk Assessment

… The paper "Small Chemical Plant risk assessment" is a good example of a case study on environmental studies.... nbsp;The Chemical Company in this risk assessment is located outside the Industrial Centre of the City and surrounded by three housing estates and a small village.... The paper "Small Chemical Plant risk assessment" is a good example of a case study on environmental studies.... Chemical Plant Overview The Chemical Company in this risk assessment is located outside the Industrial Centre of the City and surrounded by three housing estates and a small village....
11 Pages (2750 words) Case Study

Impact of Data Security on Enterprise Information Security Planning

Risk AssessmentIRMA (2010) cites effective risk assessment as an essential component of the security program in a given company.... risk assessment is probably the most crucial component of the company security plan due to its ability to make organizational managers think about the specific risks that their enterprises of activities face.... Types of Risks Included in the Assessment Plan According to Allen (2013), risk assessment includes several threats to enterprise data security such as unauthorized access, loss of data in physical terms, transit data interception, and corruption of data as well as inappropriate handling of data by other hands....
13 Pages (3250 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us