StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Owners Perspective During Preconstruction - Essay Example

Cite this document
Summary
Any project begins from the tender process and as such the pre-construction phase subsequent to the award of the deal is a key to the development as well as delivery of the project. During…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.8% of users find it useful
Owners Perspective During Preconstruction
Read Text Preview

Extract of sample "Owners Perspective During Preconstruction"

Successful project delivery needs an important amount of planning prior to construction. Any project begins from the tender process and as such the pre-construction phase subsequent to the award of the deal is a key to the development as well as delivery of the project. During the pre-construction phase, the scope as well as the budget of the project is defined (Olsson 5). At this stage, the management is used as a sounding board in giving information as well as analyzing options for both the owner and the architect.

Working through as well as under the guidance of the architect/ during this phase maximizes the value added to the project such as, energy efficiency, space used, design, structural integrity, mechanical systems and market value.Construction project cost is a main worry for the owner, yet usually the estimating is carried out in too general a manner like sq. ft. costs or very late in design development phase. The benefits that the estimating process brings are likely to be missed if the estimator comes in at the last part of the design phase to execute an Engineers Estimate.

These benefits consist of project feasibility, budget development, scope definition, realistic input to the VE as well as VA process, documents’ quality control, input to the designers as well as owners decision making course, format of the bid, clarity of scope, and projects’ bid-ability.The usual project usually overruns its cost estimation. Overruns are frequent on governmental as well as commercial projects, even when changes are considered. The reason this occurs is because estimating traditionally does not take into account the threat that the work will in point of fact cost less or more than offered by the most proficient estimate.

In order to settle on a more suitable contingency, use of a quantitative risk assessment is encouraged. Nevertheless, risk assessment has been mainly ignored for larger projects as a part of the approximating process in addition to the development of the budget. Risk assessment is currently getting more popular; it is being talked and considered a lot more than it was in the past. Major projects, mainly those in the Design-Build or some using an optional delivery technique, the teams involved in design, building, and project controls work jointly developing the design, approximations, budgets, as well as schedules in juxtaposition with each other or concomitantly (Demkin 569).

Incorporated cost along with plan risk assessments can thrive in this setting. Nevertheless, in spite of the growing fame of Design-Build along with other delivery tactics, many of projects, probably the majority, still adhere to the Design-Bid-Build delivery tactic. Because of to either the tactic or the owners financial limitations on costs of pre-construction, counting the necessary manpower to dedicate to apparent non-critical tasks, the teams in addition to procedures are out of place to build up incorporated design-estimate-schedule-risk assessment.

A correct incorporated risk analysis needs a schedule that adheres to the requirements for CPM of a high quality. Nevertheless, the characteristic Design-Bid-Build project usually has no genuine CPM if the contractor is disengaged (Hess 260). Existing schedules lack detail as well as real logic and are dependent on rough estimate durations or possibly on the owners wish list regarding the durations. Nonetheless, this does not call for abandoning the risk assessment course, on the whole. The quantitative risk assessment methods can still be employed.

Quantitative risk assessment and estimating can work jointly with the project cost management. The project owner, during the preconstruction phase, must have a view of the relationship of risk assessment and estimating techniques as a part of the project development (Hess 260). These techniques can be applied to a project to provide a more realistic appraisal of the cost while spotting risks and giving the time along with a chance to alleviate the risks. It is essential to recognize the costs, quality and time in order to control, alleviate, or agree to them.

Suitable estimating processes joint with risk evaluation present the chance to identify as well as control costs in the project development.Works citedDemkin, Joseph A. The Architects Handbook of Professional Practice. Hoboken: Wiley, 2008. Print.Hess, Stephen A. Design Professional and Construction Manager Law. Chicago, Ill: American Bar Association, Forum on the Constuction Industry, 2007. Print.Olsson, Nils O. "Management of Flexibility in Projects." International Journal of Project Management (2006): n. pag. Print.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Owners Perspective During Preconstruction Essay Example | Topics and Well Written Essays - 500 words”, n.d.)
Owners Perspective During Preconstruction Essay Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/management/1681039-owners-perspective-during-preconstruction
(Owners Perspective During Preconstruction Essay Example | Topics and Well Written Essays - 500 Words)
Owners Perspective During Preconstruction Essay Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/management/1681039-owners-perspective-during-preconstruction.
“Owners Perspective During Preconstruction Essay Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/management/1681039-owners-perspective-during-preconstruction.
  • Cited: 0 times

CHECK THESE SAMPLES OF Owners Perspective During Preconstruction

Serving Time in Virginia and From Rosie to Lucy from After The Fact by Davidson and Lytle

Serving Time in Virginia also raises some questions as to why slavery did not grow well during the time when labor was valued greatly.... It is worth mentioning that only 5 percent of the Africans constituted the population in Virginia during the first half of the century in the colony.... So, the next thing that comes to the mind is why weren't slaves introduced as an article of trade during the 1620s?... hellip; Serving Time in Virginia tries to explain and explore the reasons for what went wrong in the Virginia Colony by skillfully using a general perspective to analyze the situation....
3 Pages (750 words) Book Report/Review

Organizational culture is fundamentally about symbolic meaning and as such cannot be managed. Discuss

Reality does not constitute of objects to which humans react, rather it is the social environment within which people act according to their own perspective of the situation.... Organizational Culture Organizational culture is the relationship between a group of people working in an organization and the organization itself....
8 Pages (2000 words) Essay

Illusion and Perspective in Renaissance Art

Since such exotic birds and animals could only be owned by royalty and other wealthy citizens, one can conclude that the duke was truly a person of great importance during his time.... t the core of this technique is the use of the illusionistic perspective-an interesting contrast or, some say, complement to the humanistic realism that was prevalent in Renaissance art....
3 Pages (750 words) Essay

American Lives as they were before, during, and after The Civil War

This was one of the ideals that was established by Abraham Lincoln during that time, and his idea for this was coined "The Road to Ultimate Extinction" (Foner 1995, pg.... From a historical perspective it can be assumed that this was one of the main forces that led up to the beginnings of the Civil War.... Many of them had cotton and sugar, of which slave women would work in, picking the cotton and processing the sugar, then the plantation owners selling it for sustenance to live on....
11 Pages (2750 words) Essay

Social Mobility

Consequently, during the devastation of the statement, there can be perceived as being an indispensable self constraint built precisely into the suggestion of hospitality, which tends to preserve the reservation amid one's individual as well as the unfamiliar person, involving owning one's individual assets and appealing the additional into one's dwelling....
13 Pages (3250 words) Book Report/Review

The Importance of an Arcade as Urban and Socio-Political form within a City

"The Importance of an Arcade as Urban and Socio-Political form within a City" paper aims to identify the relevance of Benjamin's analysis to the project of Galleria Vittorio Emanuele II in Milan and reveal its social and political implications of today.... hellip; The Galleria Vittorio Emanuele II, as an architectural form of the nineteenth century, has remained critical of consumerist culture revealing the importance of commerce in collective lives....
11 Pages (2750 words) Coursework

Crisis Management in Time Earthquake and Tsunami

… The paper "Crisis Management in Time Earthquake and Tsunami in Northern Indonesia" is a perfect example of a case study on management.... nbsp;The Indian Ocean tsunami was a result of the deep-sea 8.... magnitudes of the earthquake that took place under the sea near Aceh, Northern Indonesia on December 26, 2004, causing the death of more than 350 thousand people....
10 Pages (2500 words) Case Study

Modern Architectural Designs and Features in Construction Industry

Public Protection According to Teo and Loosemore (2001), the construction process involves three different phases: preconstruction phase, construction phase, and the operation phase.... The preconstruction phase involves the development of construction plans, finalizing them and submitting them to the authorities for permits.... This paper investigates the environmental issues or impacts during and after construction, with a key focus on environmental challenges and their controlling strategies....
12 Pages (3000 words) Literature review
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us