StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Mechanical Properties of Steel and Concrete at Elevated Temperatures Engineering and Construction Lab Report
5 pages (1433 words) , Download 0 , Lab Report
Free
The mechanical properties of the steel are used to determine the design for fire resistance. For temperature rise and consequently distribution to take place in a steel member, a lot of factors such as the density, specific heat, and thermal conductivity need to be considered: the elasticity modulus, the strength, thermal expansion coefficient, and the material creep.
Preview sample
Fluid Dynamics of Fire Engineering and Construction Assignment
7 pages (1757 words) , Download 0 , Assignment
Free
There are three fluid flow governing equations: the momentum equation, continuity equation, also called the mass conservation equation and the energy equation. These equations can be expressed mathematically as shown below. The two terms that require turbulence modeling are the fluid velocity vector and the pressure (Doering & Gibbon, 1995).
Preview sample
sponsored ads
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
The Future of Third Pipe System Implementation in Melbourne Engineering and Construction Case Study
10 pages (2947 words) , Download 0 , Case Study
Free
The quality of water sources for the recycled and reuse systems depends on the actual source of water. The sources of alternative water include treated wastewater, superficial groundwater, and stormwater. The 60L case is a commercial retrofit example that harvests rainwater for reuse and recycling. The system also contains onsite technologies that recycle black water and greywater.
Preview sample
The Environmental Impact of Al-zawiya Oil Refinery in Libya Engineering and Construction Coursework
5 pages (1583 words) , Download 0 , Coursework
Free
BAT involves the application of the most effective method of disposing of waste. Oil refinery processes tend to generate many oil wastes. The company has to devise proper techniques for of disposing of the generated wastes to prevent the generation of hazardous gases during decomposition or exposure to harsh environmental conditions.
Preview sample
Ventilation Systems Engineering and Construction Assignment
12 pages (3823 words) , Download 0 , Assignment
Free
The extended corridor should be provided with additional fire protection to maintain its integrity. Design changes to the plan should also be considered to help safeguard the safety of the occupants. An alternative escape route should be designed so that the occupants have another means of escape should one of them be compromised by the fire.
Preview sample
Fire Engineering Solutions: Smoke Ventilation Systems in Apartment Corridors Engineering and Construction Report
11 pages (3205 words) , Download 0 , Report
Free
It is also important to maintain boundary and surface conditions in all parts of the building to facilitate the evacuation of tenants through the central staircases. The owner is advised to install mechanical smoke shafts at extreme end of the corridor and staircases of the building. However, occupants should be made aware of safe evacuation when a fire occurs.
Preview sample
Hydraulic Services Systems: Third Pipe System Engineering and Construction Assignment
8 pages (2066 words) , Download 0 , Assignment
Free
Recycled water may come from different sources that may be including effluent, stormwater, and also seawater. Effluent may be recycled from either a wastewater treatment plant or a sewage plant. The water quality of such water mainly depends on the purpose for which the water is supposed to fulfill.
Preview sample
Hydraulic Services Systems Critique Engineering and Construction Case Study
8 pages (2308 words) , Download 0 , Case Study
Free
The third-pipe system is a water system that has been developed and implemented in the developed nations such as Australia and its sole purpose is to ensure proper water utilization without many unnecessary wastages since this kind of water system supplies recycled water which cannot be utilized as drinking water.
Preview sample
Use of Natural and Mechanical Smoke Ventilation Systems in Common Corridors of Apartment Blocks Engineering and Construction Case Study
12 pages (3373 words) , Download 0 , Case Study
Free
Ventilation should be provided through the smoke shaft to aid in fire fighting. The main objective is to minimize the potential for contamination of stairways (BS 9999:2008). The minimum requirements for ventilation in a building are specified in British standards and can be applied depending on the occupancy level and the intended use.
Preview sample
Classical Mechanics of Fluids Engineering and Construction Assignment
8 pages (2294 words) , Download 0 , Assignment
Free
In modeling for turbulent flow, the first variable considered is the Reynolds number effect. While low Reynolds numbers signify smooth laminar flow, increasing it definitely leads to turbulent separation which may also be chaotic. Nonlinear eddy viscosity models consider molecular viscosity which is also considered for Reynolds stresses and velocity gradients.
Preview sample
Fluid Dynamics Issues Engineering and Construction Assignment
5 pages (1489 words) , Download 0 , Assignment
Free
These equations are time-dependent and also consist of elements of momentum which is associated with the conservation of mass equations, equations of energy conservation as well as equations that describe momentum conservation. The listed below are the Navier-Strokes Equations: Instantaneous equation; Momentum Equation; Energy Equation.
Preview sample
The Smoke Ventilation System Engineering and Construction Case Study
15 pages (3980 words) , Download 0 , Case Study
Free
This document acknowledges the importance of having good smoke ventilation practices. Literature review reveals that the primary danger which is associated with fire during its early stages is usually not the fire flames but rather the noxious gases and smoke produced by the fire. The smoke usually causes most of the casualties in a fire incident. They also obscure ways for victims to escape routes or exits in the building.
Preview sample
Natural and Mechanical Smoke Ventilation Engineering and Construction Case Study
12 pages (3184 words) , Download 0 , Case Study
Free
CFD modeling provides an insight into the possible movement behavior of smoke through protected areas and common corridors. It is often impractical to physically test the performance of a smoke control system before its final installation, hence the need for CFD to mitigate smoke in the building right from the start. 
Preview sample
Solution of Fluid Problems Engineering and Construction Assignment
7 pages (1608 words) , Download 0 , Assignment
Free
Turbulent models are vital in calculating the mean of glow directly without following the normal procedure of first considering the flow field that has full-time-dependent properties. It is important to note that a turbulent flow in any given fluid has many varied features on length scales that differ but ultimately interact. These turbulent models help in predicting the turbulence effects in a fluid flow (Arya, 1990).
Preview sample
Khalid Fluid Dynamics Engineering and Construction Assignment
10 pages (2582 words) , Download 0 , Assignment
Free
Please list the Navier-Stokes equations together with the equations of energy conservation (not just the names but also the mathematical expressions). Explain the physical meanings of each term in the momentum conservation equations.
Preview sample
Fluid Dynamics: Navier-Strokes Equations Engineering and Construction Assignment
6 pages (1708 words) , Download 0 , Assignment
Free
The ignitability and combustibility reduction of wood products is based on physical means with effects on different stages of burning and ignition. The examples are as follows: when heat is induced, it changes the internal structure of the wood at the molecular level; the chemical and physical processes of compounds that result from these changes
Preview sample
The Fire Management and Safety Engineering and Construction Term Paper
8 pages (2309 words) , Download 0 , Term Paper
Free
The management must ensure that the exit routes lead to safety places directly without other unnecessary hindrance to the safe place. In a big ship like the one being constructed, it is important for an escape route to be more than one and if possible the distance should be as short as possible. It should be wide enough to escape.
Preview sample
Fire Strategy for Submarine Construction Phase Engineering and Construction Assignment
7 pages (2301 words) , Download 0 , Assignment
Free
The RRFSO 2015 For fire strategy is required that submarine vessels should be designed in a manner that ensures the smoke does not spread across the vessel and fire smoke and heat are detected as soon as possible. There are a number of fire strategy measures that are undertaken to protect submarine vessels from destruction and loss of life.
Preview sample
The Fire Strategy in the Construction Engineering and Construction Term Paper
10 pages (2578 words) , Download 0 , Term Paper
Free
Hence, the necessity of prevention measures to avert fire cases and fight the menace in case of accidents. Therefore, the fundamental preventive situation should compound educative strategies for all technical workers on site. The education process must be prioritized as the key step to damage control on fire incidents.
Preview sample
Fire Safety in Submarine Construction Phases Engineering and Construction Term Paper
36 pages (8162 words) , Term Paper
Nobody downloaded yet
Another approach is to provide training to the workers on fire safety strategies. Education of the crew is a regulatory requirement in the approved document B. The crew is taught the basic fire safety issues that will prepare them to respond to fire emergencies and equip them with the safety procedure to prevent fire.
Preview sample
Submarine Fire Strategy in the United Kingdom Engineering and Construction Research Proposal
35 pages (9868 words) , Research Proposal
Nobody downloaded yet
New regulations governing the risk of fire in construction premises are stipulated under Regulatory Reform Fire Safety Order 2005 (RRFSO). Although the client has the responsibility of ensuring fire safety, the employees of the organization are under obligation to keep themselves safe from fire hazards arising during or in the event of construction.
Preview sample
The Dynamics of Fires in Various Conditions Engineering and Construction Term Paper
13 pages (1745 words) , Download 0 , Term Paper
Free
As seen from the graphs above, it is evident that as the angle of inclination is increased, the rate of fire spread significantly increases up to an inclination of 30ºC when the rate starts to reduce. Moreover, the increase in the angle of inclination of the slope increases the temperature of the fire.
Preview sample
Mayson Machining Ltd Safety Inspection Engineering and Construction Coursework
14 pages (3740 words) , Download 0 , Coursework
Free
As a result of the fire outbreak witnessed at Mayson Machining Ltd, conducting an investigation into the cause of the accidental fire was imperative. In Ontario, Canada, the Fire Marshall is responsible for conducting investigations into the factors that led to the disaster that resulted in losses worth $1.8 million (CBC NEWS, 2014)
Preview sample
Security in the Kings Cross Underground Engineering and Construction Case Study
17 pages (3063 words) , Download 0 , Case Study
Free
The Bowtie Analysis below showcases the possible risks that can be realized in the London King’s Cross. The associated risks are linked from Track switch failure, collision, and broken rails, as evidenced by the bow tie's left-hand side. Derailment is the major incident, characterized by various aspects.
Preview sample
Ground Penetrating Radar Engineering and Construction Case Study
9 pages (2667 words) , Download 0 , Case Study
Free
GPR research shows that it can be used in the detection of the landmines. The act of detecting and clearing the landmines is overwhelming and unsafe. This had made it vital to engage in accurate and efficient detection of landmines. The most widely used methods in landmine detection are metal detection and hand prodding.
Preview sample
Electric Vehicles as a Replacement of Petrol-Powered Vehicles Engineering and Construction Assignment
6 pages (1696 words) , Download 0 , Assignment
Free
The range of electric vehicles per full battery charge is a significant drawback of electric car technology. While Electric vehicles provide a significant cost saving in terms of gallons of fuel consumed per mile, their driving range is severely limited. The Tesla Model S can cover up to 265 miles with a full charge of its 85 kWh battery pack.
Preview sample
Holiday Inn Preston Engineering and Construction Assignment
14 pages (4103 words) , Download 0 , Assignment
Free
Hotel Inn is located in the Preston area. It has a hotel that offers both food and accommodation. It is strategically located and many customers visit the region frequently meaning effective risk management strategies should be in place. In terms of food, the food can contribute to fire incidents and other hazards when attributed to the preparation of the food.
Preview sample
Safety and Fire Tick List Engineering and Construction Assignment
10 pages (3443 words) , Download 0 , Assignment
Free
The pros include identification of causes, enables the implementation of corrective action, enables in-depth discussion, and it visually presents the problem/cause. The cons are sometimes it results in the identification of little effect causes, it is subjective and does not identify a specific problem rather it looks at all the causes equally.
Preview sample
Maximizing Popping of Corns Engineering and Construction Math Problem
5 pages (1469 words) , Download 2 , Math Problem
Free
It is well known that not every kernel of corn pops. During the preparation of popcorn, some un-popped corn remains at the bottom of the baking bag and as a result of this, the quality of the popcorn reduces. Because of this, a number of questions remain ringing in the minds of many people in relation to the causes of unpopped corn.
Preview sample
Ligament Replacement: Anterior Cruciate Ligament Engineering and Construction Assignment
11 pages (3214 words) , Download 1 , Assignment
Free
A minor injury to the ACL can lead to knee complications during physical activities. That is; knee injuries are very common, mainly ACLs caused on the sports field mainly. The ligament replacement is conducted where during the surgery the knee joint is replaced with a synthetic medical joint identified as Prosthesis (NLM, 2016).
Preview sample
Suspension Spring for an Offroad Vehicle Engineering and Construction Report
8 pages (1953 words) , Download 0 , Report
Free
The figure of parallel four-link is shown alongside the figure of radius arm setup above. There are kits that are being made by after-market manufacturers. These kits retrofit an existing suspension of parallel four-link design. It also uses a four-link design and coil spring as well as a track bar to center the axle springs.
Preview sample
Delay Modeling on Construction Projects in Kurdistan Region of Iraq Engineering and Construction Case Study
10 pages (2780 words) , Download 0 , Case Study
Free
Viable information retrieved will be used to establish the relationships between these causes and to what extent they affect the industry. From that information, relationship diagrams such as entity-relationship diagrams will be drawn to show the relationships between causes and also determine the necessary cause of action should such scenarios arise.
Preview sample
The Construction Plan for the Building Engineering and Construction Assignment
10 pages (2441 words) , Download 0 , Assignment
Free
Although the development of a good fire safety plan is essential in buildings, it can be seen that some buildings do not have a plan or disregard the safety issues. The common issue in the two cases is implementing fire safety requirements depending on the fire safety regulations. There was either poor or no installation of fire safety systems.
Preview sample
Internationally Recognized Building Assessment System: BREEAM Engineering and Construction Assignment
8 pages (2667 words) , Download 0 , Assignment
Free
BREEAM utilizes an express weighting framework got from a blend of accord-based weightings and positioning by a board of specialists (Azano, 2003). The yields from this activity are then used to decide the relative estimation of the ecological segments utilized as a part of BREEAM and their commitment to the general BREEAM score (Barney, 199).  
Preview sample
Producing Oil and Gas in the Asia Pacific Region Engineering and Construction Essay
12 pages (2152 words) , Download 0 , Essay
Free
The alarming rate at which oil fields are drying up has made the extraction method a critical aspect as far as oil exploration is concerned. Apparently, as Owen, Inderwildi and King (2010) note, even though it might seem abundant in some regions, there are growing demands to minimize waste because oil is not a readily renewable resource.
Preview sample
Fire Safety and Possible Building Construction Methods and Materials Engineering and Construction Assignment
11 pages (2706 words) , Download 0 , Assignment
Free
The building’s fire protection was limited to a fixed suppression system for a vent hood and kitchen appliances, and portable fire extinguishers. The vent hood and the kitchen cooking line were protected from fire by an automatic fire suppression system. In 2012, the system had been used twice, one manual operation and one automatic operation.
Preview sample
Evaluation of Possible Building Construction Methods and Materials Engineering and Construction Assignment
10 pages (2617 words) , Download 0 , Assignment
Free
It is essential to state that an excellent BREEAM rating is important for proper environmental assessment as well as the delivery of environmental sustainability. Further, this technique is expected to act as a measurement in relation to the environmental performance of other buildings around the institution.
Preview sample
Onstruction of Engineering Innovation Centre Engineering and Construction Assignment
10 pages (2674 words) , Download 1 , Assignment
Free
Engineering Innovation Centre’s priority in our design is to attain energy conservation, and the design is intended to attain about 20% of the energy consumed. The linear and tapered form is designed airflow. We will include a cross-ventilated layout in the design to provide effective natural ventilation and reduce air-conditioning demand.
Preview sample
Engineering Innovation Centre Engineering and Construction Assignment
11 pages (2693 words) , Download 1 , Assignment
Free
Construction Materials and MethodsIt are very difficult to source green materials that can adequately make the building meet the BREEAM ‘excellent rating’. In addition, green materials may negatively impact the program of EIC building construction because materials will require long lead-in times. The materials will also lead to increased costs.
Preview sample
Development of Sustainable Construction: Construction Methods Engineering and Construction Assignment
11 pages (2853 words) , Download 0 , Assignment
Free
Construction methods accompanied with materials to be used must be selected considering the design specification, legal requirements, time constraints, amount of money set aside for the project, the effect of the building method on the environment as well as the intended use of the structure to be constructed.
Preview sample
A State of the Art Review on Smart Elevator Dispatching Systems Engineering and Construction Coursework
7 pages (2047 words) , Download 0 , Coursework
Free
Sustainability also plays a critical role in determining the manner in which an elevator dispatch system is to be designed. Sustainability in this sense refers to the life of the dispatch system, how often should repairs take place and the amount of energy or electricity needed to power it [4]. A good dispatch system should have a long lifespan.
Preview sample
The Use of the Liquefied Natural Gas Engineering and Construction Case Study
17 pages (4568 words) , Download 0 , Case Study
Free
Another factor that affects the cloud's shape is the temperature of the gas released relative to the ambient air temperature. For instance, the LNG released from the storage tank, having a lower temperature than that of the air, becomes denser. Thus the cloud formed tends to sink and spread over the surface depending on the wind's speed.
Preview sample
The Evacuation from High-Rise Building Engineering and Construction Research Proposal
24 pages (5859 words) , Research Proposal
Nobody downloaded yet
The unique fire safety matters that are related to tall structures can be recapitulated into six primary areas: accessibility of the fire department sections, movement of people through egress, natural forces, increase in people in the building and the fire load, amalgamation of occupancies, and the arrangement of domestic efficacy services.
Preview sample
Fire Prevention and Fire Protection Systems Engineering and Construction Assignment
31 pages (8201 words) , Assignment
Nobody downloaded yet
These may require using protective devices, suitable guards, warning devices, markings, system control devices like emergency on-off switch buttons, training, as well as the use of personal protective equipment. For instance, the guards should have sufficient strength and be adequately far from the dangerous sections of the spiked conveyor system.
Preview sample
Solar Water Pumping Systems Engineering and Construction Research Proposal
9 pages (2392 words) , Download 1 , Research Proposal
Free
The achievement and understanding of the importance of the benefits of using solar-powered water pump systems depend on the level of the corporation of the local communities. To enhance the level of the corporation, the project will ensure a proper understanding of the importance of utilizing the solar-powered water pump systems in reducing several challenges that they experience.
Preview sample
The Replacement of Propylene Filters Engineering and Construction Assignment
8 pages (1846 words) , Download 0 , Assignment
Free
Researchers have continued to have conflicting opinions regarding what constitutes elements of good procedure. These views have often been different depending on the nature and complexity of industrial, laboratory, or engineering procedures. However, there have been consensuses on some factors. A support person is one of the elements that have been agreed that define a good procedure.
Preview sample
Application of UK Fire Safety Engineering Design Guidance Engineering and Construction Case Study
8 pages (2005 words) , Download 0 , Case Study
Free
The apartment block contains a ground floor and four (4) upper floors, with three self-contained flat units on each floor, totaling 15 flat units across the building. Each of the flats on the upper floors can be accessed indirectly off a single stairway and a single lift servicing a common corridor.
Preview sample
Fracture Analysis of a Hook Engineering and Construction Assignment
4 pages (1053 words) , Download 0 , Assignment
Free
Material strength can be established through the failure theory which is used to study the structural design to determine the safety of equipment before production. Once a material cracks or forms a flaw there is a tendency for it to fail at a stress that is lower than the threshold material strength.
Preview sample
The Hydro-PneumaticSystem with Pressure Engineering and Construction Assignment
12 pages (996 words) , Download 0 , Assignment
Free
The technical requirements of the pneumatic fluid power systems are that they require very little maintained. This is because they use gas that can be easily compressed, thus avoiding damaging equipment. The technical requirement for the hydraulic systems is to be reliable in all their uses and efficient in using energy.
Preview sample
Five Storey Building at Porchester Engineering and Construction Assignment
6 pages (1578 words) , Download 0 , Assignment
Free
The building can be described as circular with a porch-like structure entailing columns located under a pediment. It also has a characteristic porch that is linked to the rotunda via a rectangular vestibule which is under a coffered dome with a central opening. Any building stability will be determined by the foundation laid for construction.
Preview sample
1101 - 1150 results of 5601 items
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us