Our website is a unique platform where students can share their papers in a matter of giving an example of the work to be done. If you find papers
matching your topic, you may use them only as an example of work. This is 100% legal. You may not submit downloaded papers as your own, that is cheating. Also you
should remember, that this work was alredy submitted once by a student who originally wrote it.
The increased need to ensure aircraft safety in the airline industry has increased the use of different aircraft maintenance programs. Proactive maintenance of aircraft engines is a procedural process that ensures that all systems of the engine are functioning properly. This is through a step by step analysis of the components of the engines.
In the case of this experiment, the operation efficiency of the systems obtained could be identified through the ratio of the energy output to that of the energy used up by the system with regard to the fuel supply. The determination of the thermal efficiency is normally based on the power of the brake as well as the indicated power.
Preview sample
sponsored ads
Hire a pro to write a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
The idea of the ethical issues in sustainability is already beginning to bring about transformations to the landscape that is competitive and which is expected to allow business ventures to change their way of thinking with regard to their processes, technologies, products as well as business models.
Surveyors today have a lot of data and information to manage while facing escalating demands of first-class topographic inventions such as construction site surveys, land possession. One of the most vital tools surveyors make use of is the robotic total station which has been used for decades simply for the storage of examination materials.
Prestressed concrete is used to make hollow-core slabs. These are preferred over traditional methods of building in highrise and multi-story apartments. They make a common choice among engineers in low seismic zones. More importantly, they are low cost, easy to transport and assemble, use raw material, and have lower self-weight.
Allowing two to three hours for major equipment is another way of making an approximation. The leader goes on to make arrangements for review meetings upon making estimations for meeting time. Carrying on too long in a sitting or taking too many hours in a day or having many days in a week are considered undesirable.
Arch, suspension, and truss bridgesMay 2014Introduction Bridges are important structures that serve to overcome barriers that hinder movement from one point to another. The bridges are used in connecting two regions separated by a river or may be used to connect an island to the mainland. This report looks at three types of bridges: arch bridge, suspension bridge and truss bridge.
Mobile workshops are common structures used in different companies and mainly construction companies and the army. The mobile workshops are mainly located in operation areas that are far away from the social facilities or the army which is independent on all levels. A mobile workshop varies from one specialization to the other and it solely depends on the function that it is going to undertake.
Notably, there is an uncomplicated, economical method to increase the engine compression devoid of disassembling the top end. By varying the head gaskets’ inch thickness, one can successfully heighten the ratio by making the top of the volume heavy, hence, it will out weight the present volume in components located at the engine’s lower area.
The shift in resonance frequency or appearance of new resonance points may indicate fault conditions of the winding. The classification of different winding failures needs to be researched so as to establish a more standard principle as most of the researches done on FRA is not conclusive (Tang and Wu, 2011).
The nominal resistance represents a resistance that is initially specified at a specific value of temperature. Most standardized parameters include those that are used as reference points due to their ease o production. The specification in accordance with the International electrotechnical Commission is based on 0°C at 100.00 Ohms.
During the design stage, robotic total stations are used together with building information modeling to generate various types of data that are paramount in the design. This includes distance measurement, checking of boundary properties, making layouts for excavation designs, setting control points, as-built checks, topographical measurements.
For any successful construction, it is apparent that there must have been a strong team behind. The building team, however, comprises experts, semi-skilled laborers, and even non-skilled laborers. Members falling in the categories mentioned above play different significant roles at the construction site.
Type I and II are the buildings that are made of materials such as masonry, concrete, and steel, these two types are considered to be non-combustible. Type III is a combination of non-combustible materials for the exterior walls while the interior building can be made of any other material permitted by IBC such as wood (Technical bulletin 2008).
16 pages (4523 words)
, Download 0
, Research Proposal
Free
The presence of various kinds of cables in construction poses fire risks of different magnitudes depending on materials used to manufacture them. The hidden danger that these cables possess is associated with the rates of fire spread during time of catastrophes since the materials utilized for insulation purposes is highly flammable.
As the paper outlines, when building a road, the issue of the biophysical environment cannot be ignored. The project proponents and implementers have to seriously consider the biophysical attributes since they have an impact on their undertaking and at the same time, it will have some impacts on the local environment.
8 pages (2513 words)
, Download 0
, Research Proposal
Free
The design's exceptional sum of variables used makes it suitable for the study. Similar to other research types, this design may involve many variables to be analyzed. Yet, unlike other designs, it needs just one variable. It will use regression analysis in analyzing data. Some of the suitable methods of collecting data will include surveys, interviews, and questionnaires.
The pressure is noted to fall with respect to the temperature of the room since the volume of air increases due to expansion. Similar experiments are necessary given the scenarios in the study for the purpose of designing buildings in which occupants can be able to vacate prior to an increase in toxicity to an untenable extent as seen in ASET and RSET.
The initial risk assessment found several fire concerns such as the effect of open space (atrium) on unprotected stairs and doors in terms of fire and smoke movement, lack of fire detection and warning system in critical areas, and others. The fire strategy recommended an L2/P2 fire detection/alarm system following the recommendation of ADB and specifications provided by BS 5939-1:2002.
20 pages (5534 words)
, Download 0
, Research Paper
Free
The sudden addition of oxygen-rich air to a fuel-rich and smoke-filled atmosphere can lead to a backdraft or a sudden flashover. Owing to modern construction techniques, fires usually have a large supply of fuel in furnishings as well as a limited supply of oxygen due to tightly shut doors and windows. It leads to under-ventilated fire.
Fire safety management should incorporate the engineering phase where selection and control of materials are done. All the plans are reviewed before new construction is done or re-modeling of the building where certain provisions required by fire code were omitted. The exercise will ensure all the buildings are built to conform to the fire codes.
This section critically assesses problems associated with engineers and sub-contractors who cause major problems to projects. In particular, the chapter assesses x as one of the biggest oil companies in the world with two big refineries. Background information regarding the Company shows that it takes crude oil from other fields.
Still, in controlling machines, it is used in equipment such as bulldozers, graders, and excavators in an effort to provide productivity in the real-time operation of the machine. More also, it provides information and situational awareness of the person operating. The adoption of machines that are GNSS-based control is similar to the initial hydraulic technology which is used in machinery that exhibits profound reliability and productivity.
According to the findings of the paper, it can be said that the Construction (Design and Management) Regulations (CDM2007) replaced CDM94 or Construction (Design and Management) regulations 1994 and CHSW or Construction (Health, safety, and Welfare) Regulations of 1996. These guidelines are known as the Approved Code of Practice or ACOP.
10 pages (2741 words)
, Download 0
, Research Paper
Free
From this discussion, it is very evident that concrete can be used as a good roofing tile. In this case, homeowners have a lot of things to praise the concrete roof tiles for. Top in this list is the fact that concrete is durable. Durability in this case has been defined to refer to the ability of a material to possess an array of qualities.
All structural elements should provide a minimum of 60 minutes of fire resistance. All areas of high fire risk are enclosed in 30 minutes of fire resistance. An assessment of external fire spread was conducted to determine the allowable percentage of the unprotected area on the external facades. The proposed façade designs were deemed to be acceptable.
The most extensive theoretical studies were directed at determining the breakage mechanism and, subsequently, developing an understanding of the breakage mechanism. The temperature difference within the fire compartment and the resultant thermal stresses were derived to predict this cracking point difference.
The fire investigation is normally aimed at determining what caused the fire and the possible origin of the fire and the reconstruction measures to be undertaken. To get to know the root cause and origin of the fire, there is a need for fire investigators to apply a systematic approach and use basic knowledge of fire.
Socially, improved economic activities and more resources will indeed improve the lives of the people. Not only are social resources expected to increase but also be better. Given that people will be able to move from one place to another, other industries and social activities related to people interaction will also be on the increase.
A mistake in application is another limitation of the computer fire models. A model user or fire investigator can make an error while putting input into a fire model or while analyzing the output due to several reasons. Some of the reasons that might contribute to such errors include a slip in reading output or inserting input.
The next item that will be focused on in this paper is that involving the discussion of the different types of modeling that can be applied in fire investigation. Under this item, such models as the numerical models will be highlighted. These kinds of models are those that involve the use of mathematical calculations because of the presence of numbers. The other kind of model to be highlighted is the full-scale building model.
The paper “Commercial Works That Have Occurred through Sydney Olympics Park History” is an intriguing example of a case study on engineering and construction. One Australia Avenue in Sydney Olympics Park is among the eight precincts earmarked for high-rise apartment blocks of up to 30 stories tall with increased commercial development.
Knowledge of the effective date of registration is important since such knowledge will assist in making the decision on whether to publish or not before the certificate is issued by the copyright office. There are different legal loopholes that allow designers to make use of ordinary titles and names in trademarking their ideas which could come in handy in reducing limitations on copyright.
The building with the flagship Bentalls store located at the north end has the historic façade of the ancient Bentalls situated at the Southwest corner. As noted by Evans et al., the construction of this building started around 1867 which was then regarded as a ‘county’ department starting as a drapery shop under efforts made by Frank Bentall.
This analysis acknowledges that it is an Engineering project for an office building. The structure is based in England, within Manchester city. Its construction work commenced in 2010 and terminated in February 2013. This 72.5 feet tall landmark structure houses the head office for the Co-operative Group and the overall building cost in terms of construction was about £105 million.
Within the buildings you require air movement to make sure that fresh air is provided to occupants, odour is removed, excessive moisture is removed, and condensation is prevented. Good illumination will ensure that natural daylight assist offer a feel good factor, and to prevent disorders for instance seasonal affective disorder (SAD)
Essentially, CMM is capable of acquiring minor details in the readings since it is automated to produce the measurements. When using the CMM to measure the component parts, the obtained measurements are accurate since this is computer generated and has no human errors like other modes of measuring components.
Four accelerometers were engaged and simultaneously connected to a BNX shielded cable and each output connected to a response filter to eliminate interference, noise, and antialiasing. Data collection was done at a sampling frequency of 9kHz, and both averaged & Hanning windowing was employed at all the tests.
Smoldering was linked with the cause of the fire. However, the smoldering process occurs as flameless combustion, which happens at very low concentrations of oxygen and continues at a very sluggish rate. A common illustration of smoldering fire is a burning cigarette. The heat from such a source normally chars the adjacent tobacco.
In the computation of Mean Time To Failure MTTF for Bionic processor for Windows in the system structure shown above, assumptions are made regarding the components of the system. It is assumed that the individual components of the system are at a constant rate of hazard with regard to the phase of the bathtub curve.
The hose reels may be mounted on the walls or the ceiling of the workshop, and installing them within the lubrication pits may be another alternative as this will ensure ease of access to greasing points and gear oil fills. There is a need for shut-off valves to be installed between the hose reel inlets and the line of distribution of the fluid.
Its mission and objectives are to assist clients efficiently in realizing their construction design and construction needs. The organization’s efforts are guided by its vision (to become the most preferred firm) and core values that are mostly focused on creating positive experiences and lasting relationships with clients.
A pump that is centrifugal by nature circulates the engine’s cooling water. There are passages beneath the cylinder liners into which water gets pumped and achieves an upward circulation into passages fitted with outlets at both sides of the cylindrical block. There is also an auxiliary tank that is provided to collect the condensate of any formed steam in the process.
The adoption of a quantitative approach with regard to the fault tree analysis of this system involves a series of development safety considerations. Further, it involves the application of a Quantitative Risk Analysis, which simplifies the application of IEC 61508 for the safety requirement standards for the Equipment under Control.
The automotive industry has undergone a lot of revolution in the last thirty years to meet the demands of the customers. Safety is also an issue that has led to the use of technology in the automotive industry. Technological advancements in the manufacturing industries have also contributed to the advancements in the last thirty years.
In general, ASET and RSET offer the benefit of extra time provided in the margin of safety that in reality will increase if the RSET time is reduced. The principle highlighting the dependency between human behavior, environmental condition, technological devices, and fire is realistic and therefore a commendable approach to fire safety.
The paper "Classification of Hazard and Risk of Fire" is a worthy example of an essay on engineering and construction. Gross calorific probable test EN ISO 1716 is employed in the determination of the prevailing perspective total heat release of a product when consumed wholly. A powdery test specimen is normally kindled within a pressurized oxygen atmosphere inside a calorimetric bomb.
The integration and interaction of all systems involved in fire safety as well as all other systems within a structure or building, similar facilities, and industrial structures and hence able to use his knowledge to carry any practice regarding fire safety to undertake responsibilities gathered during fire engineering training.
The behavior of the graphs following the flight simulator test experiment carried out indicates that the stability variables involved are key contributors to the creation of various simulator analysis techniques. The previous flight simulation experiments have been involved with the creation of generic devices with properly loaded flight controls.
The application of the reliability engineering was made effective regarding project Bombardier Q400 aircraft operating QF1466 where its failure was minimized by a group of engineers by applying the “bathtub” curve which they used to reflect the possibility of the machine failing versus time it is likely to take for the project to fail.