StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Design Specification for the Structural Health Monitoring System of London Water Supply System Engineering and Construction Case Study
9 pages (2504 words) , Download 0 , Case Study
Free
A simple star-topology wireless sensor network is developed from an integrated software and hardware design. Multiple wireless sensing units are connected to a central server that coordinates all network activities. The central server could be a laptop or desktop computer connected to wireless transceivers compatible with it.
Preview sample
Maximizing Solar Power: Solar Thermal Energy for Domestic Use in New Zealand Engineering and Construction Coursework
11 pages (4132 words) , Download 0 , Coursework
Free
Solar thermal power is desirable technology because it environmentally friendly, and the equipment needed to harness the energy from this resource requires little to no maintenance. In a country like New Zealand, the researchers believe that solar thermal conversion systems can be used to provide energy for applications beyond water heating.
Preview sample
sponsored ads
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
How Many Uses There for Solar in New Zealand Engineering and Construction Coursework
10 pages (2652 words) , Download 0 , Coursework
Free
The significant knowledge in researching this topic has induced a disturbing thought. All the money and man-power being utilized to find oil is being wasted in the wrong direction. When such a tried method is available, which ensures cost-effectiveness and availability of power in the most convenient methods and at the most non-convenient places?
Preview sample
The Impact of Hydroelectric Power Generation and Damming in the Waikato River System Engineering and Construction Coursework
10 pages (2827 words) , Download 0 , Coursework
Free
Going back to the situation in Waikato, literature exists that pinpoint the presence of dams as being a primary cause of degradation for the Waikato River system. The degradation that is seen for instance in one part of the river system in Karapiro and Ngaruawahlia notes that the culprit for the degradation is the Karapiro dam. 
Preview sample
The Design and Construction of Motorway Project Required Bulk Continuous Excavation Engineering and Construction Coursework
6 pages (1745 words) , Download 0 , Coursework
Free
The CDM requires the provision of essential amenities that could potentially enhance safety during construction. The presence of coal dust within this site, for example, shall necessitate the provision of fire fighting equipment capable of handling a conflagration resulting from firedamp explosions.  
Preview sample
Coal Powered Electricity Generation at Huntly Power Station in New Zealand Engineering and Construction Case Study
11 pages (2938 words) , Download 0 , Case Study
Free
The study found out that one cannot just take out large amounts of water from the river without obtaining permission from the authorities. The expert pointed out that even when putting water back into the river, one has to consider its temperature so that it does not affect the operations at the station. 
Preview sample
Geothermal and Wind Power Generation in New Zealand Engineering and Construction Coursework
10 pages (2816 words) , Download 0 , Coursework
Free
There will be reduced carbon emissions into the atmosphere thus reduced the climate change issue. By 2050, more countries will adopt the use of geothermal and wind power energies due to their low cost of production and also due to the least effect on the environment. The need to embrace technological advances in the field of energy is significant.
Preview sample
Advantages and Disadvantages of Solar Electricity System In New Zealand Engineering and Construction Coursework
8 pages (3010 words) , Download 0 , Coursework
Free
The research paper gives the recommendation after presenting the overview of the assessment of the numerous issues associated with solar energy electrical systems use. This gives reliable information that is needed in order to understand the issue concerning the increased growth of solar system usage in homes, public facilities, and business.
Preview sample
Erection and Construction Procedure Engineering and Construction Coursework
8 pages (2101 words) , Download 0 , Coursework
Free
On the construction site, there are truly many materials apart from large and heavy equipment. These materials are required in the construction site for the facilitation of the construction process. The materials are not kept on the site and therefore; they require being transported to and from the site daily. 
Preview sample
Is Hydro Generated Electricity the Best Way to Generated Electricity and Compare that Between the Twin Turbines Engineering and Construction Coursework
10 pages (2703 words) , Download 0 , Coursework
Free
The sustainability of electricity generation from wind and hydro energies has been assessed according to seven important benchmarks namely price, efficiency, availability, land use, greenhouse gas emissions, limitations, and social impacts. This has explicitly shown that hydro generation of electricity is more superior to use of wind turbines
Preview sample
Does the Water Supply System Meet Need of the Current Customer Engineering and Construction Coursework
8 pages (2167 words) , Download 0 , Coursework
Free
Efforts to prevent death through water-borne diseases such as trachoma, Ascaris, and dracunculiasis, are doomed to fail unless people’s need for access to clean and safe water are not met (Baker, 2009). While achieving efficient water supply in New Zealand and across the globe is essential, it is also plagued by a number of limitations.  
Preview sample
Autonomous Development: The Choice of Materials Engineering and Construction Coursework
9 pages (2484 words) , Download 0 , Coursework
Free
According to De Leonardis (2011), Choosing the appropriate procurement method is of significant importance for the realization of the construction’s objectives. A procurement policy establishes a contractual outline that adjusts the wants of the contractor and owner with the single aim of conveying a successful project.
Preview sample
Comparing Rigidising Methods Using Re Enforced Material Engineering and Construction Coursework
8 pages (2284 words) , Download 0 , Coursework
Free
A fiber-reinforced polymer (FPR) is a material containing high-strength fibers made of either glass or carbon implanted in a polymer matrix. FPRs are of great benefit in repair and construction works because of their enhanced strength, resistance to corrosion, and ability to use with ease as opposed to steel materials.
Preview sample
Selection of Materials and Coatings Engineering and Construction Assignment
6 pages (1569 words) , Download 0 , Assignment
Free
The best materials for cooking should have non-sticky coatings. No- sticky coatings are made to bond surfaces of cooking utensils. They are easy to clean and do not need greasing. The best non-stick coatings should have very strong layers combined together to reduced easy destruction when scratched. 
Preview sample
Structural Design of the Station Engineering and Construction Coursework
7 pages (1861 words) , Download 0 , Coursework
Free
Concrete is a common building material in most superstructures today. Despite this fact, concrete has some weakness in its property; it is strong in tension but weak in compression. This property makes concrete bear tensile forces but succumbs to compression forces. Because of this weakness, steel is preferred for columns.
Preview sample
Sustainable Building Technology Engineering and Construction Case Study
10 pages (2649 words) , Download 0 , Case Study
Free
The cost of establishing the project to its full completion and usage can only be determined to be sustainable if the cost analysis is performed. Some of the costs of consideration include direct construction costs, indirect construction costs, maintenance fixed costs, maintenance variable costs, and costs incurred at its disposal. 
Preview sample
GPS Satellite Frameworks and Constellation Engineering and Construction Coursework
7 pages (1904 words) , Download 0 , Coursework
Free
Different wide-area reference systems have been positioned in different states of the US. Mainly these are located in Canada, Mexico, Alaska, and Hawaii. These stations have the responsibility of processing the GPS signals. The up-gradation and signal monitoring of satellites is planned by the US aviation authority.
Preview sample
The Using of Circut Board Engineering and Construction Assignment
8 pages (2268 words) , Download 0 , Assignment
Free
The shunt-series FB is often connected in shunt with an input stage, as well as in series with the output stage. It is noticed that the current gain always is higher compared to the voltage gain in the shunt series FB Amplifiers. What determines the current gain is the ratio of the shunt feedback resistance denoted as R5th to the series FB resistor often denote as Ref.
Preview sample
Surface Engineering Technology Engineering and Construction Term Paper
11 pages (3280 words) , Download 1 , Term Paper
Free
Non-oxidized, clean steel sheets are passed rapidly in a bath of molten zinc alloy and wiped to ensure the thickness of the coat is uniform. The sheet is cooled, forming a continuous, thin zinc coating. A number of thermal and chemical processes may then be applied to the sheet depending on its intended final use.
Preview sample
Engineering Management of Toyota Company Engineering and Construction Case Study
7 pages (1936 words) , Download 0 , Case Study
Free
Toyota was the most reputable company with its achievements incredibly undisputable. It then sometimes hit the news headlines for all the wrong reasons; poor performance due to its battles with it’s peddling supplier (Borowski, 2010). Toyota has to take this as its priority and the earlier it acts the better before things spill out of control.
Preview sample
The Waikato River and the Maori Engineering and Construction Coursework
10 pages (2776 words) , Download 0 , Coursework
Free
The worldview of the crown is, however, based on the realization of profits and thus is one that does not take into consideration the role of sustainability. It is only later that this became a part of its agenda. However, there is a recognition of the need to maintain friendly relations between different people.
Preview sample
The Waikato River of New Zealand Engineering and Construction Essay
9 pages (2354 words) , Download 0 , Essay
Free
The treaty does not possess any legal authority. It is a part of official lists of documents; however, it has not been ratified by any democratic power (Palmer, 2008) and hence, its power is inherently suspect. The very aspect of the Maori ownership is challenged by the decision of the state to not accept the advice of the Maori as it came out after consultations.
Preview sample
Preliminary Design and Analysis of an Exhibition Centre in Hyde Park Engineering and Construction Case Study
5 pages (1294 words) , Download 0 , Case Study
Free
The results indicate that the building is self-sufficient. Sap2000 analysis confirms most of the results revealed by manual calculation. Based on the results, it is evident that response spectrum analysis results compare well to the manual results obtained. Nonetheless, sap2000 analysis results show slightly higher values as compared to the manual. 
Preview sample
Biomedical Engineering: Biomaterials Engineering and Construction Coursework
6 pages (1761 words) , Download 0 , Coursework
Free
Composites refer to those materials that are made of two or more components (Misch 2011). Biomaterials that are made up of composites are used in engineering to create properties that are superior compared to those of the individual component and match the desired property of the biomaterial (Ratner 2004).  
Preview sample
Procurement and Contracting in the Repair of Uxbridge Water PLCs Flood Relief Sewer Engineering and Construction Coursework
6 pages (1538 words) , Download 0 , Coursework
Free
The success of construction projects is dependent on the way the procurements were made, and contracts awarded. A good procurement strategy guarantees stakeholders that they will get value for their money. On the other hand, good contracting is necessary to ensure that projects are implemented according to expectations.
Preview sample
The Health and Safety in Construction Engineering and Construction Coursework
8 pages (2435 words) , Download 0 , Coursework
Free
Non-adversarial techniques of conflict resolution played a major role in our group discussion. It also created a platform for the group members to learn the techniques of resolving intra-group conflicts. The techniques that played a major role in solving instances of conflict within our group were mediation as well as facilitated negotiation. 
Preview sample
Technical Choice of Dam Materials and Their Environmental Impacts Engineering and Construction Research Proposal
16 pages (4743 words) , Download 0 , Research Proposal
Free
The subject of the drilling fluid in the drilling of oil wells has been impressed in the contemporary world, and more prominently is the adoption of the drilling mud in the exploration of the natural gas and oil wells, as well as in the exploration of the drilling rigs. This liquid is often added to the wellbore to aid in the drilling process.
Preview sample
Technical Aspects of Cables Stayed Bridges Engineering and Construction Coursework
6 pages (1834 words) , Download 0 , Coursework
Free
Cable-stayed bridges are some of the modern bridges in the world consisting of a strong continuous girder (beam) with one or more towers and pillars in the middle. They have become very popular since the Stromsund Bridge in Sweden was completed in 1955. In simple terms, cable-stayed bridges carry mainly vertical loads that act on the girder. 
Preview sample
What Are the Challenges Posed for Underbalanced Drilling Operation Engineering and Construction Coursework
18 pages (4691 words) , Download 0 , Coursework
Free
The idea is to create a system where oil can be drilled from underground rock formations but with minimal invasion so that the quality of product sourced is higher. In this aspect, a variety of drilling fluids with different mix creating different densities is being used to generate this drilling process. 
Preview sample
Door Lock System by using the Motion Sensor Engineering and Construction Report
12 pages (3228 words) , Download 0 , Report
Free
Purposes of making sure the door can operate independently, the permanently programmable microprocessor has a robust program used to control the motion sensors along with other sensors upon which the door can work. Such robust programs that would help implement the activities of the revolving door are written below.
Preview sample
Analysis of Sheet Pile Wall for Embankment Stabilization Engineering and Construction Coursework
7 pages (2055 words) , Download 0 , Coursework
Free
It is good to note that the more realistic a modeling becomes, the higher will be the chances of influencing boundary limit conditions that can be neglected at the initial stages. Applying non-linear material laws in total systems including the construction procedure is very essential and has a lot of value.
Preview sample
Historical Development of the Equations Used for the Design of CFA Piles in Granular Soils Engineering and Construction Essay
7 pages (2009 words) , Download 0 , Essay
Free
The team that performs the process hazards analysis will take the compiled safety information as very vital and very important. Such measures will help in maintaining the safety of employees, employers, and the entire community that surrounds the firm. It is very advantageous to do so (Brown, 2007, p.337).
Preview sample
Real Life Drive Cycles: Experimental Results and Analysis Engineering and Construction Assignment
16 pages (4106 words) , Download 0 , Assignment
Free
Based on the plot provided above and the resulting findings, the average fuel consumption for the extra-urban testing regime was 0.4051 g/s that in turn has led to fuel consumption of approximately 5.34 l/100 km. Arguably, this fuel consumption figure represents a high value when compared to similar real-life driving conditions. 
Preview sample
Sleepmore Mattress Manufacturing Engineering and Construction Case Study
8 pages (2076 words) , Download 0 , Case Study
Free
The initial step in phase consolidation will be determining the sizes of the plant and their current free space. The free space within the firm usually determines the likelihood and ease of expansion. Therefore, in my phase consolidation, I will move the smaller plants to larger plants with wider areas that allow future expansion.
Preview sample
The Process of Obtaining Employment at Mega Engineering and Construction Essay
8 pages (2166 words) , Download 0 , Essay
Free
I was working on fiber glass cotton assembling which involved cutting fiber glass cotton then wrap it around the inner case of the oven. This could irritate the skin once in contact and those tiny fiber glass particles would disperse into the air. This was very bad for me as I already had a rhinitis problem.
Preview sample
Steel Structure: Cutty Sark, MaryRose Museum and Titanic Museum Engineering and Construction Case Study
7 pages (1901 words) , Download 0 , Case Study
Free
The Cutty Sark is an epitome of the great age of sail and the last surviving tea clipper. Its preservation was therefore a milestone achievement in historic preservation. The design/conservation solution raises Cutty Sark 3m high within constraints of the dry berth, allowing for new interventions that respect the ship’s original fabric. 
Preview sample
The History of the Great Wall of China Engineering and Construction Case Study
13 pages (3512 words) , Download 1 , Case Study
Free
The Great Wall of China is estimated to be about 6,325 kilometers in length including its branches. It ranges between 15 feet and 30 feet thick and reaches as high as 25 feet. The wall winds like a snake through China’s varied terrain through the desert, mountains, plains, plateaus, and along the river.  
Preview sample
The Process of Froth Flotation Engineering and Construction Lab Report
5 pages (1426 words) , Download 1 , Lab Report
Free
In minerals processing, the minerals should be properly crushed to the finest particles possible. The slurry should also be properly mixed to remove any air spaces that may have been left. It is also recommended that the dodecylamine solution used should be highly concentrated to make sure that optimum results are achieved.
Preview sample
PRBS+PISO+SIPO+Reed Solomon Coder and Decoder Engineering and Construction Assignment
8 pages (2531 words) , Download 1 , Assignment
Free
The RS decoder corrects a maximum of terrors and a maximum of 2t erasures (Brown & Vranesic, 2009). The erasure information is provided by the demodulator in an electronic communication channel. The demodulator serves the purpose of flagging the incoming symbols, which it suspects to be containing errors.
Preview sample
Automotive Engineering-Brake System Engineering and Construction Report
7 pages (1919 words) , Download 0 , Report
Free
This is the simple arrangement that enables the explanation of the operation of the master cylinder towards the halting of vehicles. The master cylinder starts and spreads the breaking effect to the pads located in the wheels of the vehicles. It operates a dual braking system that ensures that the failure of a system does not sabotage the whole system.
Preview sample
Light Background and Interferometry Engineering and Construction Coursework
26 pages (6620 words) , Coursework
Nobody downloaded yet
Helen et al. introduced the SRWLI  as another application method aimed at increasing the resolution of this approach by using the PSI. Additionally, the PSI method overcomes a limitation that requires fringes to have a carrier frequency to resolve the spectral phase slope and reduces the spatial variation in the interferogram background signal. 
Preview sample
Design, Drawing, and Practical Skills Engineering and Construction Assignment
7 pages (1927 words) , Download 0 , Assignment
Free
The sets in a generator are designed to produce either single-phase power or three-phase power. This aspect is very critical in making a choice for the pancake generator to use since the power type to be used should be defined in the panel. Single-phase power is mostly used by residences and small business enterprises.
Preview sample
The Important Role of Microcontrollers in Technology and Engineering Engineering and Construction Lab Report
20 pages (5270 words) , Download 0 , Lab Report
Free
Microcontrollers are used in creating spacecraft devices, and robots for developing new territories. In particular, controllers are used for automating the utilization of resources and for site preparation of the lunar surface. A complex control system using Artificial Neural Tissue architecture was developed for controlling excavation tasks for groups of robots.
Preview sample
The Invention of Microcontrollers Engineering and Construction Lab Report
9 pages (2385 words) , Download 1 , Lab Report
Free
From Universidad de Cantabria (29), the application of microcontrollers in spacecraft is favorable as a way of cost reduction since it involves the incorporation of numerous peripherals on a one-chip thereby, reducing parts counts. This integration results in the reduction of power consumption, volume, and mass while increasing reliability.
Preview sample
Elastic Energy of Rubber Band on Cars Engineering and Construction Research Paper
7 pages (2074 words) , Download 0 , Research Paper
Free
The potential mechanical type of energy is established whenever the objects are stretched or compressed. The theory of elasticity basically established a complicated system that was combined with the analytical understanding of solid body materials and mechanics. The equation for elastic potential in calculating the mechanical equilibrium positions.
Preview sample
Concrete Mixing Design Engineering and Construction Lab Report
16 pages (4139 words) , Download 1 , Lab Report
Free
The purpose of the report was to test concrete masonry units for compressive strength, absorption, moisture content, and density. The test produces compressive strength, absorption, moisture content, and density data for the control and specification of concrete masonry units. These data are important for the safety and proper performance of masonry structures.
Preview sample
Engineering Project: Hydratech System Engineering and Construction Case Study
11 pages (2876 words) , Download 0 , Case Study
Free
Inactivation of the Bacteria was a key aspect during the development of this project. The project team carried a thorough study on the different characteristics of the bacteria hence facilitating the application of the most suitable methodologies of inactivating and killing bacteria. This included inoculation, filtration, and scientific culturing.
Preview sample
The Experiment on the Determination of Tensile Strength of Metals Engineering and Construction Lab Report
8 pages (2270 words) , Download 0 , Lab Report
Free
The results indicate metal 2 yields at an approximate load of 1.2 kN. It is thus faster than the other metals while being followed by metal 3 that yields at approximately 6.0 kN. Metal 1 has the highest yielding point of about 10.5 kN. It can also be noted that the maximum load that the metals can carry follows the same trend as their yielding points.
Preview sample
Determination of the Tensile Strength of Metals Engineering and Construction Lab Report
8 pages (3140 words) , Download 0 , Lab Report
Free
The results clearly show that metal 2 that yields at an approximate load of 1.1kN experiences yielding before the other two metals. Metal 1is the next in the list with a yielding point at an approximate load of 6.0kN hence the strongest. Lastly, metal 1 tops the list with a yielding point at 10.5kN of the load.
Preview sample
Speed Control of DC and AC Machines Engineering and Construction Lab Report
11 pages (2955 words) , Download 0 , Lab Report
Free
The literature points towards the realization of motor efficiencies of up to 95% when operating in the three-phase model. The experiment successfully illustrated how these machines are regulated, operated, and controlled to achieve a balance in the speeds; efficiency, cost, and speeds are required for the nature of the application desired for the AC motor.
Preview sample
1701 - 1750 results of 5633 items
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us