StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Modern Methods of Producing Large Scale Maps in the UAE Engineering and Construction Case Study
22 pages (6493 words) , Case Study
Nobody downloaded yet
The initial process of producing the map of a small area such as Abu Dhabi is to accurately define the geographical markets. The geographical markets are defined by creating a round barrier around the area of interest. Theissen polygons are used to define the area as indicated below. They divide the surface on the plane as a region of interest around each set of points.
Preview sample
Understand Building Construction Engineering and Construction Assignment
12 pages (3254 words) , Download 0 , Assignment
Free
Trade jurisdiction: - this is a trade as is defined by the Board so as to define “parts of the construction-industry” for the registration. Such jurisdictions are similar to jurisdictions as are set between the building-trades, though they are not identical. They usually depend on the Board's discretion, but not the building-trade rules. 
Preview sample
sponsored ads
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
-5%
Apply my DISCOUNT
Technical Issues Associated with High-Rise Construction Engineering and Construction Report
12 pages (3321 words) , Download 0 , Report
Free
These structures require reinforced steel and concrete for their construction. High-rise buildings pose a great challenge to both the geotechnical and structural engineers especially if the building is located near or at an area that is prone to earthquakes or tremors. They are also a challenge to firefighters or brigades and especially a fire outbreak (Fairweather 2004).
Preview sample
Investigating Air Starved Fires by Use of a Cone Calorimeter Engineering and Construction Literature review
12 pages (3204 words) , Download 0 , Literature review
Free
It has been used in many types of research and experiments to study fires that are starved of air. This report is about such studies and the cone calorimeter has been used as well. This report gives information about investigations carried out on fires starved of air, the results of such studies and their analysis, and a chosen case study.
Preview sample
The Design Process and the Main Principle Requirements of a Project Engineering and Construction Assignment
16 pages (4348 words) , Download 0 , Assignment
Free
The essence of reinforcing concrete is to withstand higher tensile stress. This is because concrete can stand a very high compressive stress but is very weak when under tension. To improve the capacity of concrete to withstand a higher tensile load it needs to be reinforced with material that is strong in tension.
Preview sample
Aircrafts Lightning Strike Protection with Air France Flight 447 Engineering and Construction Case Study
6 pages (1699 words) , Download 0 , Case Study
Free
From the ninth message, this was a clear indication that the flight had been affected by lightning or thunderstorms. At 2h 1m 21s, the message indicated and concluded that the aircraft’s rudder deflection was jammed till the slate extension was given. None of the pilots of the flight control system were able to deflect the rudder. 
Preview sample
The Use of Standard Fire Curves for Determining Fire Resistance Engineering and Construction Term Paper
5 pages (1517 words) , Download 0 , Term Paper
Free
Furnace pressure is also a matter relating to standardized tolerances for testing to attain the ratings of fire resistance. The figure below is a graph showing European tolerances, subject to NEN-EN 1363-1. The different graphs represent the different levels of rating or the resistance expected from the minimum to the maximum.
Preview sample
Definition of Compartment Fire Situations Engineering and Construction Term Paper
8 pages (2186 words) , Download 0 , Term Paper
Free
Compartment fire envelops the complete fundamental nature of fire growth. The word ‘compartment’ here refers to any enclosed space that controls the critical air supply and thermal surroundings of the fire. These factors have power over the spread and growth of the fire, its maximum burning rate, and its length. Fire in enclosed spaces can be differentiated into three stages.
Preview sample
Fire Safety Strategies for Ashton Office Building Engineering and Construction Research Paper
31 pages (8460 words) , Research Paper
Nobody downloaded yet
In conclusion, successful organizations should be flexible through linking emergency management, security, fire safety, disaster recovery, and crisis management. The FRS program can be implemented effectively if differences in Fire safety management and emergency management are coordinated in scale, scope, and skills. 
Preview sample
Maintenance Management of Energy Industry - Chernobyl Engineering and Construction Case Study
15 pages (4010 words) , Download 0 , Case Study
Free
Occupational safety involves those areas or locations where people work including manufacturing plants and energy industries among others. There are several causes of accidents in industries that range from unsafe conditions and unsafe acts. Plant maintenance is extremely important in all industries and more importantly energy industries.
Preview sample
Challenges of High-Rise Structures Engineering and Construction Essay
8 pages (2609 words) , Download 0 , Essay
Free
Generally speaking, the major challenges in putting up a building design are classified into two – the regulatory requirement of the locale or region where the bulding must be erected and the structural requirements that need to be met in order to erect the building. Structural engineering requirements change in building designs for high rise structures.
Preview sample
Fire Safety Management for the Academic Building Engineering and Construction Term Paper
10 pages (2770 words) , Download 0 , Term Paper
Free
Fire hazards refer to the potential elements within the building and its external environment that have the capacity to result in a fire and hence place the occupants in immediate danger. Towards fire management, the identification of fire hazards is the first step as this practice provides basic data that is used to develop the fire safety plan. In identifying the fire hazards, the identification of the fuel, and oxygen.
Preview sample
Engine Selection Parameters Engineering and Construction Term Paper
6 pages (1693 words) , Download 0 , Term Paper
Free
To estimate the thrust required for this project aircraft, the thrust to weight ratio is used to calculate the amount of thrust needed to fly. Thrust-to-measure is termed as a ratio is the ratio of thrust to weight of a jet engine, propeller locomotive. It is a dimensionless quantity and is an indicator of the performance of the engine.
Preview sample
Analysis of the Basic Principle behind Process Engineering Control Engineering and Construction Term Paper
11 pages (2823 words) , Download 0 , Term Paper
Free
It was apparent that trial and error could be used to derive optimal or near-optimal PID controller settings; but in a real-world application, this would be very time-consuming and (given the likelihood of significant overshoot with an untuned or badly-tuned controller) could easily result in damage to expensive system components.
Preview sample
The Use of Undercarriage Pins and Modification Light Engineering and Construction Case Study
8 pages (2191 words) , Download 0 , Case Study
Free
International organizations system company’s standards will be used in this project. This is because these standards are certified by the government. The standards used are; CAA (Civil Aviation Authority) Found in U.K (United Kingdom) FAA (Federal Aviation Administration) Found in the U.S.A (United State). 
Preview sample
Modification of the Light Cover Engineering and Construction Case Study
8 pages (2035 words) , Download 0 , Case Study
Free
A light cover is located at the front side center of the wings of the plane, it covers the light which signifies that the plane in motion especially at night. This is necessary so that the other planes flying at night are made aware and thus avoiding the instances of crashes. The light is also used for navigation when the plane is almost landing.
Preview sample
Digital Computer Simulation of Period Oscillation Engineering and Construction Term Paper
7 pages (1810 words) , Download 1 , Term Paper
Free
The experiment stated was very important in understanding how flights are controlled and directed. By comparing the data presented, the values from the theoretical point of view could be compared with those from the practical view. This gave many pilots and military combats a chance to understand more about the stability of flight.
Preview sample
Fire and Built Environment for 30-Storey Block, Multi-Occupied Premise in London Engineering and Construction Report
19 pages (5117 words) , Download 0 , Report
Free
Building construction projects normally have some elements in common like financial, design and legal matters which should be observed to avoid reaching undesirable ends like cost overturns, collapse, and litigation problems. Therefore experienced personnel should be brought on board to make detailed plans and maintain a careful overview to ensure positive success during project implementation.
Preview sample
Fire Safety: Conversion of a Building from Laboratory to Lecture Theatre Engineering and Construction Case Study
6 pages (1600 words) , Download 0 , Case Study
Free
The government and stakeholders have instituted numerous policies and regulations that determine the level of safety and the appropriate strategies that may be utilized. Converting the building from a laboratory to a theatre hall requires analysis of the building to ascertain whether the safety of the occupants is guaranteed. 
Preview sample
Modern Inspection Systems Engineering and Construction Term Paper
7 pages (1848 words) , Download 0 , Term Paper
Free
Some of the technical data and dimensions of the HM 2000 microhardness testing system include: maximum test load of 2000mN; maximum indentation depth of 150 micrometers; load resolution of 0.04mN; distance resolution of less than 100pm and approach speed of the indenter is less than 2 micrometers per second.  
Preview sample
Modern Inspection Systems Engineering and Construction Term Paper
6 pages (1666 words) , Download 0 , Term Paper
Free
Heightened security and trade operations around the world have necessitated the development of inspection systems within organizations and institutions. Inspection systems are applicable in almost all areas of operations whereby they ascertain trade quantities and ensure the authenticity of goods or persons.
Preview sample
Building Regulation and Fire Safety Management Engineering and Construction Report
10 pages (2638 words) , Download 0 , Report
Free
The construction standards set relate to the degree of spread of flame and penetration. Usually, the majority of glass products achieve AA rates. This is the best rating so far. It is therefore highly recommended that glass products of AA rates be incorporated in the use in roof coverings of the academic building. This will enhance the fire resistance levels of the building.
Preview sample
Fire Protection Strategies in the Building Engineering and Construction Case Study
17 pages (4529 words) , Download 0 , Case Study
Free
Various elements of the fire protection strategies include: detection and warning systems means of escape Internal fire spread lining Internal fire spread structure External fire spread Access to fire-fighting equipment and fire services The analysis of these elements will enable the author to make recommendations to the building’s owner on the reliability of their fire protection strategy.
Preview sample
Academic Building Fire Protection Engineering and Construction Case Study
9 pages (2500 words) , Download 0 , Case Study
Free
The walls are important in starting, preventing, and extinguishing fires. Even though the walls do not support the building (e.g. structural support), it is appropriate to ensure it stands for a long time before it collapses in case of fire. Thus, the walls should be covered with material and paintings that resist fires.
Preview sample
Layout and Configurations of the Building Engineering and Construction Case Study
17 pages (5371 words) , Download 0 , Case Study
Free
The structure under consideration is a building with a set of rooms with windows and doors. All these structures have been put in place for the utilization of the building on an optimum basis. The rooms are both of smaller sizes as well as of the larger constructed areas depending on the availability of the space as well as the utilization needs of the building.
Preview sample
Construction Technology of the Buncefield Compound Engineering and Construction Case Study
8 pages (2233 words) , Download 0 , Case Study
Free
The Buncefield compound is made up of numerous tank farms and oil storage procedures. Two of these are functioned by HOSL, a joint project between Total and Texaco. Another site is worked by a joint group between Shell and BP, the British Pipeline Agency (BPA), and is located among the HOSL East and West locations.
Preview sample
Construction Technology in the Buncefield Incident Engineering and Construction Case Study
10 pages (2752 words) , Download 0 , Case Study
Free
The Buncefield incident was a blaze that occurred on 11th December 2005. The owner of the depot was TOTAL UK limited and it was the fifth-largest depot in the UK with a capacity of sixty million gallons of fuel. On this day large amounts of vapor were noticed coming out from a pipe in the North West corner of the site constantly with loss of the contents from tanks through the pipes.
Preview sample
Construction Technology in Buncefield Fire Engineering and Construction Case Study
9 pages (2556 words) , Download 0 , Case Study
Free
This was caused by an oil storage tank that was positioned near a motorway by the organization management team in the heart of Hertfordshire in renowned England. This is terminal was rated in position five in the whole of England and the united kingdom and it had a possibility of holding at a time sixty million gallons of fuel.
Preview sample
Microphone Amplifier Engineering and Construction Report
8 pages (2111 words) , Download 0 , Report
Free
The amplification factor in this circuit is determined mainly by the characteristics of charge Q1 and value of resistor R2. The circuit is designed for quite optimum performance but for modification purposes the value of resistor R1 TO values like 100 K ohms and 1 M ohm in order to achieve any significant performance.
Preview sample
What Is an Internal Combustion Engine and How Have Car Manufacturers Modified It Engineering and Construction Assignment
11 pages (2859 words) , Download 0 , Assignment
Free
The history of internal combustion engines' invention can be traced way before the start of commercial production of the commonly used petroleum fuel. However, the application of these engines was limited until the late 1800s when they were used in various applications. The real practical use of ICEs to power cars started after the modification of an engine concept developed by Nicolaus Otto.
Preview sample
Manufacturing Microphone Amplifier Engineering and Construction Assignment
1 pages (324 words) , Download 1 , Assignment
Free
The capacitor that you install allows the alternating current signal to pass through the circuit but it blocks the direct current by the resistors. There should be two resistors so that any preceding circuit does not become affected by the direct current. The two transistors that form the differential amplifier allow usage of the negative feedback. 
Preview sample
Examination of Shuttle Challenger Disaster Engineering and Construction Case Study
8 pages (2204 words) , Download 0 , Case Study
Free
The main cause of Challenger’s disaster was mostly human errors as well as bad weather conditions. This is because, despite the negative weather forecast, the launching of the Shuttle Challenger went ahead. However, the main cause was human errors. Therefore, in the future, human errors and ignorance of small faults should be avoided to hinder any further disasters.
Preview sample
Emergency Exit Lighting Engineering and Construction Case Study
13 pages (3465 words) , Download 0 , Case Study
Free
Hazards are inherent in real-life situations and these hazards are disastrous to properties and other economic development. Thus, the development of numerous strategies that assist people to escape from scenes of accidents especially in buildings is important, and hence the presence of Integrated emergency fire exit lights that aid civilians to exit a hazardous area. 
Preview sample
Emergency Lighting System Engineering and Construction Case Study
10 pages (2705 words) , Download 0 , Case Study
Free
An emergency lighting system is a lighting system that is mainly used in emergency situations when a building’s main power supply fails either as a result of a fire or a power cut. This abrupt power cut may lead to total darkness which may cause panic and lead to unnecessary movements hence collision and physical danger for the occupants.
Preview sample
Analog Circuits Utilizing Electronic Workbench Engineering and Construction Case Study
7 pages (1993 words) , Download 0 , Case Study
Free
An operational amplifier is the most common circuit that is used to rectify, amplify or even regulate any alternate current source. Numerous circuits that employ operational amplifiers exist that may include general oscillator diagrams and Schmitt Trigger. All the simulation values obtained from the experiment are similar to the calculated ones.
Preview sample
Columbia Space Shuttle Disaster Engineering and Construction Case Study
8 pages (1961 words) , Download 0 , Case Study
Free
An example of technological exploration that scientists and researchers have been associated with is space exploration. Space exploration is utilizing space technology to explore outer space, an approach that is conducted by humans’ spaceflights and robotic spacecraft. The idea of shuttle design has been developed even before the inception of NASA.
Preview sample
Fire and the Build Environment to Wales, Northern Ireland, England and Scotland Engineering and Construction Case Study
11 pages (3198 words) , Download 0 , Case Study
Free
Major building fires the world over have been responsible for loss of life and millions of dollars in property destruction. The greatest challenge is that most of these building fires occur without warning in most cases their depiction and control are usually very hard. This in turn makes investigation efforts even harder in their attempts of ascertaining the causes of such fires.
Preview sample
Fire in Buildings - England and Northern Ireland Engineering and Construction Case Study
11 pages (3124 words) , Download 0 , Case Study
Free
An investigation was ongoing after bookmakers and an estate agent was to be demolished due to a subsequent fierce blaze. The fire spread to the neighboring estate agents, Bradshaw, Far ham, and Lea, and nearby inhabitants were evacuated. Fire officers were delayed by a ruptured gas principal, which added stable fuel to the blaze, and high winds.
Preview sample
Fire and the Built Environment Engineering and Construction Case Study
9 pages (2319 words) , Download 0 , Case Study
Free
The main aim after the fire occurred was to create a tunnel that would be having more fire-resistant materials. There was the loss of human lives in the tunnel and more than 30 vehicles were gushed down in the vagaries of fire. These vehicles were stationed at their rest areas between 19 and 23 covering a distance of 1.2 km.
Preview sample
The Issues and Concepts of Fire Safety Engineering Engineering and Construction Term Paper
10 pages (2753 words) , Download 0 , Term Paper
Free
The fact of the matter however is that the smoke movement system was not correct otherwise the fire would not have reached the proportion that it did. the material used in the garage was combustible despite the fact that it might have been previously assumed that fire-related work would and in the garage.
Preview sample
Computing and Technology Building West Campus, UCLan Preston Engineering and Construction Case Study
10 pages (2440 words) , Download 0 , Case Study
Free
One of the stairways is located near the main entrance, one on the left-wing, and two on the right-wing.  It has a total of four comfort rooms (CM 102, 103, 136, and 146), two on each side of the building. The main entrance has two double swing doors, leading to the main reception area near the first stairway to the right. A lift is also available on the left side of the main entrance.
Preview sample
Analysis of Fires, Accidents, and Catastrophes Engineering and Construction Case Study
8 pages (2321 words) , Download 0 , Case Study
Free
The case study provides interesting description. An analysis would provide that there has to be a sensitive approach when it comes to fire handling in older buildings when compared with newer buildings. There has to be a high fire and safety management that would be protecting people and building together.
Preview sample
Fires and Built Environments Engineering and Construction Case Study
10 pages (2923 words) , Download 0 , Case Study
Free
There were several combustible materials in the factory yet it was not being supervised by anyone. This is dangerous as any small thing could have sparked off the fire. All buildings with combustible materials such as these should always be supervised and measures should be put in place to store them safely to prevent them from catching fire. 
Preview sample
Fire Safety Engineering and the Built Environment Engineering and Construction Case Study
10 pages (2822 words) , Download 0 , Case Study
Free
The aim of fire safety engineering principles, therefore, is to ensure lives are saved, the property is protected and the environment is conserved including heritage buildings (Christian & BSI, 2003), analytically evaluate both the protective and the preventive optimum measures in order to reduce fire effects, identify and quantify fire risks and hazards (Christian & BSI, 2003).
Preview sample
Factors that Causes and Outcomes of Fire Engineering and Construction Report
7 pages (2046 words) , Download 0 , Report
Free
Some common causes of fires that are associated with individuals are smoking, inappropriate use of electrical equipment and electrical wiring, use of candles, stoves, and heating appliances. In the case of family members or groups of individuals, matches, combustible material, accumulation of easily ignitable paper and rubbish cause fires, and arson & fire started intentionally.
Preview sample
Leeds Airport and Horsforth - Environmental Factors and Cost-Benefit Analysis of the Routes Engineering and Construction Report
31 pages (6080 words) , Report
Nobody downloaded yet
A link has been done to connect Leeds airport and Horsforth. Leeds airport and Horsforth are areas that are connected with a road. There have been three suggested routes and there have been choosing the routes using the environmental factors, horizontal and vertical alignments, and cost analysis would be evaluated in detail.
Preview sample
Stress Corrosion with its Effects Engineering and Construction Term Paper
6 pages (1772 words) , Download 0 , Term Paper
Free
SCC on aircraft parts may be due to a residual within the part itself, this usually occurs as a result of the production processes employed during manufacturing or even an externally applied cycle loading. Severe metal forming and tapered bolts are good examples of high residual tensile stresses and can eventually lead to SCC. 
Preview sample
Conservation of Old Buildings The Essential Bridge from Yore to Future Engineering and Construction Term Paper
7 pages (2055 words) , Download 0 , Term Paper
Free
Buildings have always been an integral part of human existence; initially as essential shelter and later as a symbol of human development and progress. Evidence of this can be seen in the way mud dwellings have evolved into huge megalithic structures and more recently, into condominiums of concrete, steel, and fiberglass.
Preview sample
Building Construction Methods and Materials for a 10-Storey Sustainable Building in Manchester Engineering and Construction Case Study
8 pages (2000 words) , Download 0 , Case Study
Free
There are certain factors that ought to be taken into consideration when designing a 10-storey sustainable building. These include the safety and sustainability aspects of the building. A sustainable building is one that promotes efficient use of resources such as water, materials, and energy while reducing the effects on the environment and human health throughout its lifecycle.
Preview sample
The Edge and Wave Building Engineering and Construction Report
20 pages (5151 words) , Download 0 , Report
Free
The main issue that has risen on the construction of Wave and Edge from the political front was the feasibility of the high rise building and the way it can bring down the scarcity of office space in Adelaide, Australia. Will the building code be maintained for the construction of high-rise buildings in Adelaide?
Preview sample
1901 - 1950 results of 5601 items
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us