Safety Analysis: the Chernobyl Accident Technology Case Study
11 pages
(3071 words)
, Download 0
, Case Study
In September 2007, Ukraine approved the building of a steel casing over the reactor. The casing, to be built by the French firm Novarka, will be at a cost of $1.4bn. The arch-shaped structure, which will measure 190 m wide and 200 m long, is scheduled to take 5 years to complete. Once the structure is complete, the dismantling of Reactor 4 will begin”