StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Engineering and Construction Issues that Surrounded the Three Gorges Project - Essay Example

Cite this document
Summary
An essay "Engineering and Construction Issues that Surrounded the Three Gorges Project" reports that the project was quite promising since, at the time, the concept of sustainability was not given much weight; the primary focus was on the massive prospects associated with the project. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.1% of users find it useful
Engineering and Construction Issues that Surrounded the Three Gorges Project
Read Text Preview

Extract of sample "Engineering and Construction Issues that Surrounded the Three Gorges Project"

Engineering and Construction Issues that Surrounded the Three Gorges ProjectOverview of the ProjectA project whose construction decision received an approval in 1948, the Three Gorges Dam Project, replaced the Great Wall as the largest project. Marred by contentions and controversies, the project would later be a mega undertaking that would stretch the limits of engineering and China’s resources. Initially, the project was quite promising since, at the time, the concept of sustainability was not given much weight; the primary focus was on the massive prospects associated with the project.

As such, the Chinese government and all the parties to the decision incepted without a second thought, a project that later threatened to break China and its environment plus the general ecosystem apart. Riddled with massive corruption that even worsened the environmental hazards tied to the project, the Three Gorges projects holds the world record for the number of people displaced (Shu, 2012 pg. 14).Discussion of the IssuesThe most damning yet unthinkable reality is the number of people displaced during the construction of the Dam.

From the onset, the dam was intended to be a massive project, little was it known that the effects will be enormous as well. According to available statistics, close to 1.2 million people were ejected out of their dwellings to give room for the project. As if not enough, several cities, towns and villages were flooded. As such, the project led to unimaginable levels of human rights violations.Moreover, the environmental impacts of this initially heroic undertaking are incredible. To make the situation even worse, the environmental effects of this project may continue into the unforeseen future if measures are not taken to mitigate them.

As the dam transforms the landscape of the area, so are the weather pattern and ultimately, the climatic conditions. Precisely, while the erosion is likely to cause landslides, the weight of water in the reservoir is likely to cause reservoir-induced seismicity. Also, the model of this dam is likely to develop complications in future, which may in turn add more trouble to the existing string of trouble for the locals. As much as the effects may be blamed on corruption and the engineers, it is also certain that the size of this project may have significantly contributed to the current predicaments facing the dam.

How the Situation May Affect Future DesignsUp until now, more and more controversies spring up from engineers concerning the model of the Three Gorges Dam, which, unfortunately, is already being replicated by the Chinese engineers world-over. Even before most of the mistakes made in the project are rectified, Chinese engineers are already building dams throughout the world using the same model. Therefore, the errors are propagated from one place to another and from one dam to another. It will adversely affect the future designs since those projects that take after the Three Gorges will have similar environmental and other effects.

Violation of Ethical ConsiderationsThe typical engineering operation guidelines stipulate that all the necessary ethical considerations be made prior to any project, level alone those as huge as the Three Gorges. Now, in this project, the plague of corruption might have led to flouting of some ethical guidelines. One glaring violation is the failure to estimate the future effects of the Dam on the local environment and the ecosystem. If any such considerations were made, there would not have been the level of destruction witnessed as a result of the project.

The effects on River Yangtze, the effect on crops and the disastrous model, all would have been included in the planning, and a comprehensive method developed to deal with them. The lack of organization and order in the resettlement of the displaced, and the flooding of the area are all manifestations of flouted guidelines. All in all, the Three Gorges should be a source of learning for future humongous engineering projects to avoid a repeat of the mistakes.Work CitedShu, Gao. The Three Gorges Project: Development and Environmental Issues.

Beijing: Macalester International, 2010.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Engineering and Construction Issues that Surrounded the Three Gorges Essay”, n.d.)
Engineering and Construction Issues that Surrounded the Three Gorges Essay. Retrieved from https://studentshare.org/engineering-and-construction/1692418-i-am-not-sure-about-the-name-please-pick-one-for-me
(Engineering and Construction Issues That Surrounded the Three Gorges Essay)
Engineering and Construction Issues That Surrounded the Three Gorges Essay. https://studentshare.org/engineering-and-construction/1692418-i-am-not-sure-about-the-name-please-pick-one-for-me.
“Engineering and Construction Issues That Surrounded the Three Gorges Essay”, n.d. https://studentshare.org/engineering-and-construction/1692418-i-am-not-sure-about-the-name-please-pick-one-for-me.
  • Cited: 0 times

CHECK THESE SAMPLES OF Engineering and Construction Issues that Surrounded the Three Gorges Project

Why Prefabrication housing in form of Volumetric system is not fully used in UK housing

Towards the commencement of twentieth century, futuristic assumptions regarding building construction in U.... had wide speculation about the utilization and involvement of volumetric offsite construction methods as a major replacement of traditional methods.... construction companies tended towards offsite construction; however, looking back to the supposed rise of volumetric and hybrid construction methods, limited involvement was observed onwards....
40 Pages (10000 words) Dissertation

Building construction technology

Lack of document, however, does not affect the report because the writer provides a thorough assessment through direct interview with the people involved in the project development and construction.... The report will contain the pre-construction concerns and how they were handled, construction methodology – of structures that are in place as well as some predictions of the structures yet to be built, materials – that had and were planned to be used to the extent known, and construction practices and future projections of the impact on the local community from an individual, governmental and business perspective....
8 Pages (2000 words) Essay

Civil Engineering - the Manhattan Project

The Manhattan project was the American program for researching and developing the first atomic bombs.... The goal of the Manhattan project was effectively summed up by scientist Robert Serber when he deduced, "Since the one factor that determines the damage is the energy release, our aim is simply to get as much energy from the explosion as we can.... [1] Thus, due to the nature of the program's objective, the Manhattan project is one of scientific engineering's foremost successes. ...
13 Pages (3250 words) Essay

Civil Engineering

This essay is going to implement high and low roads.... It will discuss why this would impact the design and how to implement designs that are sound structurally.... speaking.... In developing high and low roads, the civil engineer must take into consideration the development of the region too surrounding the roads....
45 Pages (11250 words) Dissertation

Three Gorges Dam Project Analysis

The government, in 1932, under the leadership of Chiang Kai-shek started preliminary plans on the three gorges.... In addition, three gorges Dam is the 2nd biggest functional hydroelectric project in regard to annual energy production, generating in 2012 over 98.... e envisioned a dam with a capacity of producing 22 GW of power being feasible downstream three gorges.... The construction of the dam started on 14th of December 1994 and the project apparently cost an incredible amount of monetary, environmental, and… resources and finally got completed on 20th may 2006....
12 Pages (3000 words) Essay

ARCHITECTURE HISTORY NoteBook 3

It is drawn from the context of three Prussian pillars of society depicted by the arsenal, palace, and cathedral.... In Europe, Historicism idealized past realms and acculturations, where they used motifs stirred by them to inspire national reminiscence. ... ... irst the need to… the traditional styles with the emerging societies brought by industrialization, hence the old styles were incorporated to stamp authority in town halls, railway stations, opera houses and legislatures. ...
20 Pages (5000 words) Book Report/Review

Redevelopment of High Street Plaza Shopping Centre

Lack of document, however, does not affect the report because the writer provides a thorough assessment through direct interview with the people involved in the project development and construction.... The report will contain the pre-construction concerns and how they were handled, construction methodology – of structures that are in place as well as some predictions of the structures yet to be built, materials – that had and were planned to be used to the extent known, and construction practices and future projections of the impact on the local community from an individual, governmental and business perspective....
12 Pages (3000 words) Report

Final Year Professional Practice Project

"Final Year Professional Practice project" paper aims to present the theory which was learned in class in a more practical way.... The project was carried out for a client (WBJ Training Centre) shed light on the real world of civil engineering with lots of construction works… All the facts learned in class were applicable in the field.... The project majored most on the incorporation of managerial skills adopted by various teams ranging from the employer to the contractor....
13 Pages (3250 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us