StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Duration estimation a new approach in Critical chain scheduling - Essay Example

Cite this document
Summary
Rezaie, Manouchehrabadi & Shirkouhi (481) discuss the critical chain project management (CCPM), which was initiated in 1997 by Goldratt, referred to as the theory of constraint. Ever since, the CCPM has attracted substantial attention both in execution communities and the…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.5% of users find it useful
Duration estimation a new approach in Critical chain scheduling
Read Text Preview

Extract of sample "Duration estimation a new approach in Critical chain scheduling"

Duration Estimation A New Approach in Critical Chain Scheduling Rezaie, Manouchehrabadi & Shirkouhi (481) discuss thecritical chain project management (CCPM), which was initiated in 1997 by Goldratt, referred to as the theory of constraint. Ever since, the CCPM has attracted substantial attention both in execution communities and the academic world. One of the leading controversial issues of the critical chain project management, which is a subject matter of many critics, is the manner it proposes for activity duration estimation.

Rezaie, Manouchehrabadi & Shirkouhi (481) suggest a new-fangled technique for duration estimation of activities through estimating the level of uncertainty buried in each activity duration and after that taking out of safety periods related to this uncertainty. The validity or soundness of this proposed method, according to the authors, is measured by carrying out a computer simulation on a number of the test problems. Simulation analysis proves that the suggested technique yields schedules that are more dependable than the schedules established by first CCPM technique of duration estimation.

Some of the crucial key terms discussed in this article include critical chain, theory of constraint, duration estimation and project scheduling. Critical chain, according to Rezaie, Manouchehrabadi & Shirkouhi (481) is the longest series of events through the project network following the resource contentions. Critical chain, in other words, is a group of tasks through which the project general duration is decided. The authors also discuss how time/duration estimation is a crucial matter of the critical chain.

The authors discuss how Goldratt dedicated a substantial part of this research trying to explain the cause why safety periods cannot safeguard the projects intended dates against the doubt embedded in projects.Rezaie, Manouchehrabadi & Shirkouhi (482) give numerical facts, which were not broadly discussed in Goldratt’s original work. They argue that Goldratt did not exactly specify any numerical distribution function, but assumed a right distorted distribution for every activity duration whereby there was a significant distance between 50% quantile and 90% quantile.

They further talked about the propensity among individuals involved in time estimation to overrate the required time so that adequate safety period is put into the measures. The third section of the article, Investigating of Time Estimation Methods, analyzes the method proposed by the authors. The authors go deep into the explanation giving both quantitative and qualitative facts. Conveying the logic to the stakeholders might be difficult, and make individuals feel stress and nervousness (Rezaie, Manouchehrabadi & Shirkouhi 487).

The authors simplify the subject through saying that people should realize that these projections are rough plus there are buffers that would balance in case, but the problem occurs because of unrealistic estimation of events. This is when buffers begin warning managers, and they, on the other hand, blame individuals working on events, so there could be better ways of eliminating safety times from events.The final section of the article discusses the experimentation of the findings. In order to assess the competence of the suggested method for activity duration estimation, a simulation was carried out with the aid of the MATLAB 7.

5 software on a PC (Rezaie, Manouchehrabadi & Shirkouhi 488). The findings proved that, in reality, the method proposed by Rezaie, Manouchehrabadi & Shirkouhi was more effective than the one proposed by Goldratt.Work CitedRezaie, Kamran, Manouchehrabadi, Bengrah and Shirkouhi, Nazari S. “Duration Estimation, a New Approach in Critical Chain Scheduling 2009”. Third Asia International Conference on Modeling & Simulation. IEEE Computer Society. Web. 6 April 2013.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Duration estimation a new approach in Critical chain scheduling Essay”, n.d.)
Retrieved from https://studentshare.org/information-technology/1620265-duration-estimation-a-new-approach-in-critical-chain-scheduling
(Duration Estimation a New Approach in Critical Chain Scheduling Essay)
https://studentshare.org/information-technology/1620265-duration-estimation-a-new-approach-in-critical-chain-scheduling.
“Duration Estimation a New Approach in Critical Chain Scheduling Essay”, n.d. https://studentshare.org/information-technology/1620265-duration-estimation-a-new-approach-in-critical-chain-scheduling.
  • Cited: 0 times

CHECK THESE SAMPLES OF Duration estimation a new approach in Critical chain scheduling

Project Time Management

Gantt charts assist in project scheduling by showing that how much time would be needed for each task.... This paper “Project Time Management” is concerned with critical success factor of time, which has emerged as an even more important factor in the past few years.... hellip; The author also analyzes the critical path method, Gantt chart and project time management processes....             In simple words, critical path method is a time management technique in project management, which allows project managers to understand the shortest and longest time required for the completion of each project....
7 Pages (1750 words) Research Paper

Critical Chains in Project Management

duration estimation: a new approach in critical chain scheduling.... There exist two buffer types in critical chain; feeding buffer (protecting the chain from non-critical chains' uncertainty) and project buffer (absorbing the critical chain activities' variability and protecting the chain from uncertainty) (Rezaie, Manouchehrabadi & Shirkouhi, 482).... They suggest that methods of critical chain ought to solve buffer setting in critical chain and activity duration's cut coefficient....
3 Pages (750 words) Research Paper

Effects of Implementation of Information Systems in E-Business

The company has adopted the E-business strategy to eliminate the lengthy supply chain, present in the current strategy.... This reduction has been attributed to the duration taken before bikes are delivered to customers.... Production Introduction The utilization of information systems remains a business strategy adopted in introducing fundamental improvements into the various business processes....
14 Pages (3500 words) Essay

Project Management Methodology

y decision for choosing CPM technique was justified once I compared it with other traditional technique, PERT and scheduling analysis technique like critical chain scheduling.... 33) critical chain scheduling not a revolutionary approach, fundamentally it is based on CPM theory.... 9) Another major limitation of critical chain scheduling is that it is expensive to implement, and depending on the project has certain degree of in accuracy as well....
2 Pages (500 words) Essay

Microsoft Project and Other Open Source Project Management Tools

scheduling plans resources in a logical manner to all the projects (Palmer, 2009).... The critical areas are data collection, project performance, development of action plans, implementation of actions, and progress monitoring and meeting functional goals.... It also has the critical Path Method (CPM) which determines the longest path of the activities, earliest and latest time for activity start and finish....
10 Pages (2500 words) Essay

Programme and Project Management

These include strategic planning, strategic management, strategic finance and strategic marketing.... The term strategic is expected to enhance the value of a… The term strategic is not merely a prefix to the function.... Its role is to add importance to these activities by involvement of the senior level executive for bringing in the role of leadership so as This paper is aimed at developing a comprehensive understanding of the concepts of strategic project management and its roles in the modern project management context....
20 Pages (5000 words) Essay

A Process of Ongoing Improvement

Consequently, it is an influential approach to help individuals without production experience comprehend these substances.... The report, A Process of Ongoing Improvement, is a summary of the famous article 'The Goal' written by Eliyahu Goldratt which is based on a case study of Unico....
11 Pages (2750 words) Essay

The Conduct of the UK Fire Control Program

The government took time to think over the integration of the control rooms and forming a regional structure but the project failed mainly because of the lack of planning and systematic approach (Hodge, 2011).... "The Conduct of the UK Fire Control Program" paper suggests how the successful utilization of the best possible strategies would have helped in mitigating the problems to an extent leading to better solutions and improved benefits....
16 Pages (4000 words) Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us