Name: Instructor: Class: Date: Critical Chain Over years, managers and other leaders have developed and implemented several methods to effectively manage projects. These methods have recorded varying success in use and applicability. Project management and schedule traditional methods contain numerous problems which are considered dire to the project’s overthrow and plan stability (Hong & Ji-Hai, 330)…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER95.3% of users find it useful
Critical Chains in Project Management
Read Text Preview

Extract of sample "Critical Chains in Project Management"

Critical Chain Over years, managers and other leaders have developed and implemented several methods to effectively manage projects. These methods have recorded varying success in use and applicability. Project management and schedule traditional methods contain numerous problems which are considered dire to the project’s overthrow and plan stability (Hong & Ji-Hai, 330). Traditional methods of project management, Program Evaluation and Review Technique (PERT); Design Structure Matrix (DSM) and Critical Path Method (CPM) are successful in application of running of individual projects, but cannot be successfully applied in multiple projects’ parallel management.

The attempts to resolve this disadvantage led to the development of critical chain project management method (CCPM). Critical chain is described as the project network’s longest series of activities, after resource contentions’ resolution (Rezaie, Manouchehrabadi & Shirkouhi, 481). Basing on his theory of constraint (TOC), Goldratt, introduced the method of critical chain project management (CCPM) (Rezaie, Manouchehrabadi & Shirkouhi, 481; Li, Gong &Kou, 485; Hong & Jihai, 330). The key advantages of CCPM are its simple understanding and visual imagery while its chief weakness is failure of reflecting the constraints, process logic and critical work (Hong & Jihai, 330).

Therefore, it has limited application. The development of critical chain theory was subsequent to the development of the following methods: Critical path method by United States Rand Corporation and Dupont, Program Evaluation and Review Technique (PERT) by Allen and Hamilton firm (Yu-Cheng, cited in Hong & Ji-Hai, 330), the Graphical Evaluation and Review Technique (GERT) by Apollo Lunar Landing Program (Jin-Bo, Zhen-Ming & zhi, cited in Hong & Ji-Hai, 330) and Venture Evaluation Review Technology (VERT) (Lewis, cited in Hong & Ji-Hai, 330).

Critical chain theory was introduced in the year 1997 basing on TOC. It advanced the CPM and PERT methods of project management from the limited resources’ viewpoint. The critical chain theory incorporates cognitive, resource-constrained and physiological factors, together with the bottlenecks of projects; those critical factors resulting in the project’s time of delay. This theory utilizes conduct science, which covers up the limitation of traditional project management, in management of project schedule.

This theory follows seven steps (Hong & Ji-Hai, 331): The structure of work breakdown establishment Activities definition Network chart drawing Critical chain (constraints) identification Restraint use; project activities’ times’ estimation, feeding buffer and project buffer and resource buffer identification Small non-critical path chain identification; and Project’s critical chain schedule scheming Time estimation and buffers are the key components of critical chain. Time estimation refers to the length of the anticipated activities’ time of completion whereas buffers denote the time added to the anticipated completion time of the activities to offer safe completion of the whole project without delays (Rezaie, Manouchehrabadi & Shirkouhi, 482).

Despite activities containing more safety times, projects fail to be completed on due dates. This is attributed to two reasons according to Goldratt; Parkinson law that argues the idea of work expanding itself to use extra time and student syndrome proposing people’s postponement of project’s work by to focus on their individual undertakings, up to the time they feel they will complete the project’s work on time. There exist two buffer types in critical chain; feeding buffer (protecting the chain from non-critical chains’ uncertainty) and project buffer (absorbing the critical chain activities’ variability and protecting the chain from uncertainty) (Rezaie, Manouchehrabadi & Shirkouhi, 482).

Rezaie, Manouchehrabadi & Shirkouhi (483) suggests a different method of estimating the activities’ time. This presented method bases on the fact that relation of time safety and each activity’s duration; estimating each activity’s embedded safety time. The extensively used method of uncertainty measurement considered duration as the difference between pessimistic time and average estimate. On contrary, the method presented by Rezaie, Manouchehrabadi and Shirkouhi determines the coefficient of statistical distributions’ dispersion.

The coefficient is given by dividing standard deviation by the distribution mean. Li, Gong and Kou (486) describes an algorithm of critical chain under subheadings ant colony optimization, critical chain algorithm and algorithm steps. In their work, they view the scheduling of resource-constrained projects as a problem of generalized optimization. Ant colony optimization, devises virtual ants that explore varying routes, and eventually leave the virtual pheromone steady disappearance. It explains that, the best route is chosen on the principle of “mutually pheromone closer to the line” (Li, gong and Kou, 486).

This method involves the main idea, heuristic information and information update. They argue that the method of critical chain employs critical chain and not critical path, in its algorithm. The critical chain’s activity set and critical chains number rely on the RCPSP solving process. They suggest that methods of critical chain ought to solve buffer setting in critical chain and activity duration’s cut coefficient. The duration cut ratio is given by dividing the project’s time excluding resource constraint (T1) by the project’s ACO length (T2).

The buffer is greater than or equal to zero, but less than or equal to the difference between duration excluding resource constraint consideration (t2) and duration including limited resource consideration (t1), that is t2-t1. The algorithm steps part describes the procedures of implementation. It involves three steps. First: determining project’s length and critical path excluding resource constraint’s consideration and ACO’s use in obtaining the project length, and critical chain. Second: cut ratio computation and modification in presence of other feasible alternatives of resource utilization.

Third: modification of the improved critical chain using the activity flexible and project’s flexible coefficients Li, Gong & Kou, 487). Works cited Hong, L. J. R. & Ji-Hai, L. J. Critical Chain Management Based Heuristic Algorithm for Multiple Resources-Constrained Project. Seminar on Business and Information Management, 2008, 330-335. Li, K., Gong, L. & Kou, J. resource-constrained project scheduling based on ACO-Critical Chain Method. International Workshop on Computer Science and Engineering, 2009, (2), 485-489.

Rezaie, K., Manouchehrabadi, B. & Shirkouhi, S. N. duration estimation: a new approach in critical chain scheduling. Asia International Conference on Modeling and Simulation, 2009, (3), 481-484.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Critical Chains in Project Management Research Paper”, n.d.)
Critical Chains in Project Management Research Paper. Retrieved from https://studentshare.org/information-technology/1473680-critical-chains-in-project-management
(Critical Chains in Project Management Research Paper)
Critical Chains in Project Management Research Paper. https://studentshare.org/information-technology/1473680-critical-chains-in-project-management.
“Critical Chains in Project Management Research Paper”, n.d. https://studentshare.org/information-technology/1473680-critical-chains-in-project-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Critical Chains in Project Management

Project Management Refers to the Discipline of Securing

project management Introduction A project is a temporary endeavor whose beginning and end are clearly defined.... hellip; This requires the hiring of competent project managers who will conduct a good and successful project management.... By definition, project management refers to the discipline of securing, planning, organizing and managing available resources with an aim of achieving a successful completion of a project and the attainment of its goals and objectives (Bjarne 2007)....
8 Pages (2000 words) Essay

Critical Chain Project Management Based Heuristics Algorithm

Goldratt utilized TOC in project management in 1997.... This paper is a summary of the article Critical Chain project management Based Heuristic Algorithm for Multiple Resources-Constrained Project by Liu Jian-bing Ren Hong and Liu jian-bing Xie Ji-hai.... The paper is divided into six parts which contain different sub-sections that explain the Critical Chain project management Based Heuristic Algorithm for Multiple Resources-Constrained Project, a conclusion, and Critical Chain project management Based Heuristics Algorithm This paper is a summary of the article Critical Chain project management Based Heuristic Algorithm for Multiple Resources-Constrained Project by Liu Jian-bing Ren Hong and Liu jian-bing Xie Ji-hai....
2 Pages (500 words) Essay

Lean Project Management

The purpose of the paper "Lean project management" is to conceptualize the project management model named LPM.... A good charter must be in a position to offer written documentation that efficiently approves the launch and the requests of the efforts in project planning.... Furthermore, the writer emphasizes the role of project buffers capacity in lean management.... Getting the sponsors and management to sign is normally difficult....
10 Pages (2500 words) Term Paper

Project Management Stages

The aim of project management is to bring… The main challenge of project management is to attain all the project goals and objectives honoring the preconceived constraints.... Some of Topic: project management This is a process that entails planning, organizing, motivating and controlling resources to achieve specific goals in our daily problems.... The aim of project management is to bring beneficial change or added value....
1 Pages (250 words) Essay

Programme and Project Management

Its role is to add importance to these activities by involvement of the senior level executive for bringing in the role of leadership so as This paper is aimed at developing a comprehensive understanding of the concepts of strategic project management and its roles in the modern project management context.... The paper presents a review of various studies in order to incorporate a precise and detailed study of strategic project management under the literature review segment....
20 Pages (5000 words) Essay

What is Operations Management

This assignment "What is Operations management " discusses a sound knowledge of operations management to any business organization (the manufacturing, service industries).... The assignment considers issues in supply chain management: procurement issues; and customer, market, government change issues.... hellip; Operations management (OM) is the management concept concerned with the planning, designing, leading and controlling of products, services, and processes from throughout the supply chains....
4 Pages (1000 words) Assignment

Challenges of Selecting a Supply Strategy in Project Environments

This Article posits that in a project environment, many firms face the dilemma of deciding whether to adopt either an agile supply management approach or a lean one.... The basis of selecting an approach to supply management is based on whether the product offering is innovative or… An innovative product offering is characterised by high variety of goods, short life cycle of products as well as unpredictable demand for the products.... The most recognized philosophies in supply chain management are Lean Thinking and Agile thinking (Liu, 2007)....
4 Pages (1000 words) Essay

Logistics and Operations Management

This aspect further complicates the LOM of the industry and will require highly detailed and professional project management (Flick, Kardorff & Steinke 2004, p.... This paper will use theory to suggest reengineering of the construction industry's supply chain and project management and the advantages that would be realised by employing suitable processes.... As two concepts that cannot be discussed exhaustively Therefore, logistics and operations management (LOM) is the larger field that is concerned with the direction of activities targeted at the creation of goods and services by transforming inputs....
18 Pages (4500 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us