Construction Delay Claims : How a Contractor can effectively achieve an extension of time or schedule adjustment for Employer/ - Essay Example

Comments (0)
Summary
TABLE OF CONTENTS CHAPTER 1 1.1 Background to the Study 1.2 Aim and Objectives of the Study 1.3 Research Methodology 1.4 Outline of the Chapters CHAPTER 2- PROJECT SCHEDULING 2.1 Background 2.2 Current Scenario on Project Scheduling 2.3 Significance of Project Scheduling 2.4 Project Scheduling Phases 2.5 Project Scheduling 2.6 Communicating the Construction Plan in an Effective Manner 2.7 Types of Project Schedules 2.7.1Narrative Schedules 2.7.2 Gantt Charts 2.7.3 Linear Schedules 2.7.4 Critical Path Method Schedules 2.7.4.1 Critical Path 2.7.4.2 Critical Path Method schedule 2.7.5 Contemporaneous Schedule 2.8 FLOAT 2.8.1 Importance of Float for Owner 2.8.2 Importance of Float to the Contract…
Download full paper
GRAB THE BEST PAPER

Extract of sample
Construction Delay Claims : How a Contractor can effectively achieve an extension of time or schedule adjustment for Employer/

Download file to see previous pages... 4 – DELAY CLAIM MANAGEMENT 4.1 Background 4.2 Delay Claim/Dispute Management In International Construction Market 4.3 Role of the Engineer in the Delay Claim Management (FIDIC Red Book) 4.4 Delay Claims Procedures Followed by the Contractor (FIDIC Red Book) 4.5 Assessment of Delay Damages (FIDIC Red Book) 4.6 Rightful Claimant of Delay Damages (FIDIC Red Book) 4.7 Comments 4.8 Chapter Closing Comments CHAPTER 5 – CASE STUDIES 5.2 CASE STUDY 1   5.2.1 The Case Details 5.2.2 The Dispute 5.2.3 The Judgment 5.2.4 Comments  5.3 CASE STUDY 2 5.3.1 The Case Details 5.3.2 The Dispute   5.3...
Time and again, the importance of scheduling has been acknowledged by industry experts as the necessity for a successful construction project. Time delays arise when the time allotted is being overrun by the contractor party. The issue of delays has not been understood properly and the methods to avoid delays has not been yet accepted, thus leading to capital losses and rise in litigation cases. When such time related conflicts come into picture, both the parties try to impose their losses through claiming against the other party. Since time can be justified as money for this industry, to finish projects on time, and avoid delays, it is necessary that effective project scheduling is executed and benchmarks are set up for both the parties. Delays and time extensions are the main issues of concern and this situation is expected to worsen if any steps are not taken to improve the situation and acknowledge the importance of project scheduling to timely avoid delays. 1.2 Aim and Objectives of the Study This paper was aimed at studying the importance and existing trend of Project Scheduling in the construction industry along with a strong emphasis why a properly statuses project schedule is an important tool when claiming a schedule adjustment. and the delay analysis and claim processes involved. The objectives have been identified as following: a) To identify the different types of project scheduling methods available within the industry b) To identify the different categories of Delay occurring in the construction projects and how to measure delays with and without schedules. c) To study the process of claim management in construction projects ...Download file to see next pagesRead More
Comments (0)
Click to create a comment
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
Construction Law and Dispute Resolution in the Firm
The author states that based on the business conditions or other such stipulations the subcontractor may assume many forms through which he fulfills the instilled obligations of the Employer or main Contractor. In most given circumstances the subcontractors hired by a general contractor in order to execute specific project objectives.
6 Pages(1500 words)Essay
Liabilities of Contractor, Employer
In this case the repudiation of sub contract, the stopping of work by the contractor and termination of the contract by the employer were mentioned. Having a overall view of the situation, it seems that M is liable to E. Various laws regarding the contract and termination must be discussed before deciding the liability.
10 Pages(2500 words)Essay
Time Delay Disputes in Construction Contracts
There are three major categories that could cause delays during the process of construction. These are due to input factors, the internal environment or exogenous factors. Understanding the nature of a delay is instrumental in knowing which step needs to be followed in dealing with it.
4 Pages(1000 words)Assignment
Construction law - standard form contracts
The latest version of NEC came to be known as NEC 3 and that of JCT was JCT 2005. At this juncture, the present essay attempts to evaluate some of the important provisions of the two contracts. The essay takes a comparative approach wherein an attempt is made to compare and contrast the important provisions found in both contracts.
6 Pages(1500 words)Essay
Extension of Time and Delay Analysis
The term “completion of a contract” could have many meanings depending upon the context in which it is used. In case where it implies the completion of the whole assigned task, it has attached to it specific obligations of the contractor and the employer as par the express or implied terms in the contract
5 Pages(1250 words)Essay
When work on a construction site has started long before a formal contract has been drawn up and signed, the parties may have made an agreement to negotiate; or the employer or architect may have written a letter of intent to the contractor. Explore an
Hence, as early as in 1677, the Statute of Frauds was enacted supposedly in order to prevent fraud, perjury and other falsehoods that may attach in an agreement if this is not reduced in written form. (Statute of Frauds 1677. An Act for prevention
10 Pages(2500 words)Essay
How will I schedule time for me everyday
Furthermore, I have found that playing with my kids will do better using toys like remote control planes. My to-do list is operating as a recruiter for the armed forces, starting from 9 am to 5 pm. After my job,
1 Pages(250 words)Essay
Time extension under FIDIC 1999
Construction contracts are legally binding agreements between the Employer (sponsor owner of the project) and the Contractor1. As such, the contract sets the parameters for the activities that would go on between the Employer and Contractor. It controls the relationship
8 Pages(2000 words)Essay
Schedule I & schedule II Drugs
This is because they are considered unsafe for consumption due to their negative effects on the individuals’ wellbeing. Heroin is synthesized from
8 Pages(2000 words)Term Paper
Sacking a contractor
However, in some cases, termination of a contract is inevitable. In particular, termination of a contract may involve the dismissal of a contractor under the advisory of an employer or a client. As a project manager,
4 Pages(1000 words)Essay
Let us find you another Essay on topic Construction Delay Claims : How a Contractor can effectively achieve an extension of time or schedule adjustment for Employer/ for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us