Nobody downloaded yet

Inquiry of The Scottish Parliament building at Holyrood - Essay Example

Comments (0) Cite this document
Summary
After the United Kingdom’s Parliament devolved powers to the Scottish Parliament in 1998, the new Scottish Parliament building was planned at Holyrood in central Edinburgh, Scotland. Construction of the building began in June 1999, and was to be completed by 2001. However,…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER91% of users find it useful
Inquiry of The Scottish Parliament building at Holyrood
Read TextPreview

Extract of sample
"Inquiry of The Scottish Parliament building at Holyrood"

Download file to see previous pages Enric Miralles, the Catalan architect and designer of the building died while the project was in progress. The former Lord Advocate Peter Fraser in his Holyrood Inquiry in 2003 has identified the Construction Management method of procurement as one of the major factors affecting the final cost of the project (White and Sidhu 2005).
Thesis Statement: The purpose of this paper is to outline the alternative methods of construction procurement that may have been considered for the Scottish Parliament building. One of the methods will be selected as the most suitable, and the reasons for the choice will be explained.
The Scottish Parliament building has won numerous awards including the 2005 Stirling Prize for its architecture. The design of the construction was conceived as a poetic fusion of the “Scottish landscape, its people, its culture and the city of Edinburgh” (Satellite Sites 2008). However, the unrealistic cost estimates at the conception stage, the lack of true comprehension of the architects’ evolving design, requirement for changes and increases approved by the client: the Secretary of State and later the Parliament, and the consequent rise in costs resulted in financial difficulties during the construction. Most significantly, there was inadequate understanding of the Construction Management route of procurement, with no information given to the ministers regarding the risks involved in this method. Moreover, due to the complexity of the project, high maintenance costs are being incurred in an ongoing manner (White and Sidhu 2005).
The procurement system is the project organisational structure adopted by the client. It is defined as the “collective action required to acquire the design, management and installation of inputs” (Ngowi 2000, p.362). According to Morledge (2006), over the last twenty-five years, there have not been any significant changes in the United Kingdom strategies for the procurement of new ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Inquiry of The Scottish Parliament building at Holyrood Essay”, n.d.)
Inquiry of The Scottish Parliament building at Holyrood Essay. Retrieved from https://studentshare.org/miscellaneous/1562721-inquiry-of-the-scottish-parliament-building-at-holyrood
(Inquiry of The Scottish Parliament Building at Holyrood Essay)
Inquiry of The Scottish Parliament Building at Holyrood Essay. https://studentshare.org/miscellaneous/1562721-inquiry-of-the-scottish-parliament-building-at-holyrood.
“Inquiry of The Scottish Parliament Building at Holyrood Essay”, n.d. https://studentshare.org/miscellaneous/1562721-inquiry-of-the-scottish-parliament-building-at-holyrood.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
The Scottish Parliament Building
...ensured proper scheduling of activities that were involved in the completion of the entire project. According to Taylor (1999) despite the criticisms and a mixed public reaction, the building was welcomed by architecture professionals and critics. The choices of location, architect, design, use of non-indigenous materials and construction company were all criticised by politicians. A major public inquiry into the handling of the construction criticised the management of the whole project from the realisation of cost increases down to the way in which major design changes were implemented. The success of Scottish Parliament was also as a result of skilled human labour...
3 Pages(750 words)Essay
The Scottish Parliament Building
...and the Establishment of the Hollyrood Progress Group.” [online] Available at: http://www.scottish.parliament.uk/vli/holyrood/inquiry/sp205-11.htm The Holyrood Inquiry. “The Project from Handover to February 2000.” [online] Available at: http://www.scottish.parliament.uk/vli/holyrood/inquiry/sp205-10.htm The Holyrood Inquiry. “Project Management – 1998 to 1 June 1999.” [online] Available at: http://www.scottish.parliament.uk/vli/holyrood/inquiry/sp205-09.htm The Holyrood Inquiry. “Construction Management.” [online] Available at:...
12 Pages(3000 words)Book Report/Review
PROJECT MANAGEMENT: THE SCOTTISH PARLIAMENT BUILDING
...options for the proposed Parliament building and Ministers received feasibility studies along with their cost estimates. The debate over devolution of the Scottish government was distracted over the issue of the site. The proposed site for the Regent Road/St Andrew’s House reached £65 million, not counting fees and VAT. Leith site reached £59 million, also not counting fees and VAT. Haymarket was a bit lower with £53 million, not counting fees and VAT and acquisition costs, an additional of £6 million. The Holyrood site was the lowest. II. An analysis of the reasons that explain the delays or cost increases encountered during the project First, there was a...
11 Pages(2750 words)Assignment
Report on The Scottish Parliament Building (Edinburgh)
...?Topic Inserts His/her Inserts 14.11. Introduction Over the last 100 years, the British architecture has described the Scottish Parliament building as a tour place of arts and crafts. Many people are interested in its art work which was done by the late Enric Miralles, who died before the building was completed, and since then, the building has continued receiving various visitors who are interested in its great history. This building was specifically designed to house over 1,000 staffs and 129 MSPs with other civil servants (Great Britain, Scottish parliament, 2003, p.2). the major purpose was to unite...
4 Pages(1000 words)Assignment
The Scottish Parliament Building
...? The analysis of the Scottish Parliament Building (Edinburgh) Project management is the process of planning, designing, implementing and guiding project processes from start to the end. It is a systematic approach that needs careful planning of time, resources and Labour therefore to finish the work as intended. This process goes through five phases i.e. initiate, plan, execute, control and finally close the project. These processes can be applied to typically any type of project. With the view of managing time, a clear description and detailed analysis of the project should be done. This starts with creating a terms of reference or clear specification of the project. This is followed by...
4 Pages(1000 words)Essay
PROJECT MANAGEMENT- The Scottish Parliament Building (Edinburgh)
...for the project management team who was assigned the task of constructing the building. This eventually created a budget overrun and delay in the project completion. References Andersen, E.S., Grude, K.V., Haug, T., & Turner, J.R. (1987), Goal directed project Management” Bain, Susan (2005) Holyrood: The Inside Story. Edinburgh University Press Fraser, P. (2004), The Holyrood Inquiry, Scottish Parliamentary Corporate Body, Scotland. Flyvbjerg, B., Holm, M. and Buhl, S. (2002), “Underestimating Costs in Public Works Projects”, Journal of the American Planning Association, Vol. 68(3). Hood, J. and McGarvey, N. (2002), “Managing the Risks of Public-Private...
4 Pages(1000 words)Essay
The Scottish Parliament Building
...project managers to appropriately manage their time, is a key issue that leads to delays in the completion of projects. In order to ensure timely completion of the Scottish Parliament, despite the controversies of cost increment and site selection, project managers ensured appropriate scheduling of activities that were concerned in the completion of the parliament building. Balfour & McCrone (2005) argues that notwithstanding the criticisms from various individuals for example Lord Fraser and public reaction, Scottish Parliament building was welcomed by various professionals and architects.  Public...
4 Pages(1000 words)Assignment
The Scottish Parliament
...think that was the right way to go about it Mr. Armstrong: It was not my choice. Mr. Campbell QC: That was not what I asked you. Mr. Armstrong: I think that is my answer. (The Holyrood Inquiry n.d.) It can clearly be seen that this type of attitude does not deliver the kind of great architect the Scottish were hoping to build. The lack of communication resulted in the lack of results as well. Enric Miralles, who won the competition in 1998, was to select an architect to work with on the design. His envision was that, "The Parliament should be able to reflect the land it represents. The building should arise from the sloping base of...
8 Pages(2000 words)Essay
Analysis of the criticism of the design and development of the scottish parliament building at Holyrood, Edinburgh
... Order# 307357 Academia-research 6 July 2009 An Analysis of the Criticism of the Design and Development of the Scottish Parliament Buildingat Holyrood, Edinburgh ABSTRACT The New Scottish Parliament Building Project, executed as part of the Scottish Devolution Plan of 1997 was set to open against a deadline period of the new millennium in 2000, and expected to cost around £50 million. However, the construction of this landmark building was fated to pass through a sequence of events steeped in controversy which resulted in the building being opened three years behind schedule at a cost of around £431 million. This paper is an attempt to analyze the Criticism of the Scottish Parliament Building Project, including the problems... of the...
8 Pages(2000 words)Essay
The Scottish Parliament Building
...inquiry was chaired by Lord Advocate, Peter Fraser. Also, the location, the architect, the design, and the operation of the construction was highly criticized. Three years from the start, from 40 million British Pounds, to 414 million, the city of Edinburgh would never be the same. Met with mix reaction between the city’s people, their culture, and the character of the exterior Scottish landscape, the project finally came to fruition after four years. Architectural academics and critics alike, voiced a poetic union, giving the new Scottish Parliament Building, named the Holyrood Building, it’s place in history....
12 Pages(3000 words)Book Report/Review
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Let us find you another Essay on topic Inquiry of The Scottish Parliament building at Holyrood for FREE!
Contact Us