StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Project management assignment NO.2 - Essay Example

Cite this document
Summary
In the United States, there are more than 100 million housing units, and the majority of them are "single family dwellings," or houses (Brain 1). Unfortunately, building a house is not as easy as drawing a shelter on a piece…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.3% of users find it useful
Project management assignment NO.2
Read Text Preview

Extract of sample "Project management assignment NO.2"

Download file to see previous pages

During construction, activities are done based on the order that they should be carried out. Duration for each activity is estimated based on current data available. A network model is established to show the relationship among the activities and a critical path method is used to determine the critical and non critical activities. CPM is important because it shows the management the activities that need much attention and monitoring to avoid unnecessary delays in project completion (Taha 267).

As shown in Diagram 1, constructing foundation and framing are the first two important activities to do because they serve as the framework of the house. Several activities such as plumbing, roofing and wiring are done right after framing since these activities are associated with the different parts of the house and so, they can be started anytime without any delay. Landscaping requires a stable water system so it should be done only after plumbing is finished. Finishing activities and painting are both done after plastering since the house is considered almost finish by that time.

Lastly, activities such as making curtains and laying carpet are considered as final activities and should only be done after the whole structure of the house is built and painted. This means that these two paths constitute the time period of project completion. According to the computed critical path (Table 1), the project will be completed in 42 working days. Therefore the project should be started on November 17, 2008 in order to finish it by January 19, 2009. Working days exclude weekends and holidays like New Year and Thanksgiving Day.

All the critical activities are shaded in Table 1. This means that these activities are the most important tasks in the project and therefore must be done on schedule. Non critical activities are plumbing, wiring, landscaping, finishing and attaching TV antenna. They are considered non critical because they can be done in advance or

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project management assignment NO.2 Essay Example | Topics and Well Written Essays - 1000 words”, n.d.)
Project management assignment NO.2 Essay Example | Topics and Well Written Essays - 1000 words. Retrieved from https://studentshare.org/miscellaneous/1551284-project-management-assignment-no2
(Project Management Assignment NO.2 Essay Example | Topics and Well Written Essays - 1000 Words)
Project Management Assignment NO.2 Essay Example | Topics and Well Written Essays - 1000 Words. https://studentshare.org/miscellaneous/1551284-project-management-assignment-no2.
“Project Management Assignment NO.2 Essay Example | Topics and Well Written Essays - 1000 Words”, n.d. https://studentshare.org/miscellaneous/1551284-project-management-assignment-no2.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project management assignment NO.2

Operations Strategy and Operations Management

project management assignment Name Al Khawarizmi International College Part 1: Project description Cancer being one of the worldly-feared diseases; this project has been aimed at determining the effects of transformer oil on the lives of workers at the power substation section in Almhy Cargo Company.... According to Roberta R and Bernard WT (2006), this will require tight project schedule in terms of time management in which resource allocation, time estimation, defining a serial style of events and determining periodic constraints that may arise in the process....
3 Pages (750 words) Assignment

Project Management and Predetermined Business Targets

The paper "project management and Predetermined Business Targets" discusses the chance of arising conflicts amid various firms that broadly embrace quality enhancement programs and innovative products.... Specially mentioning, the above described “soft side” of project management would support in finding out the obstacles to attain desired project targets by a considerable level (Andersen, 2010).... Thus, it can be stated that the above-discussed instruments must be incorporated to ensure better project management (Docstoc, 2011)....
7 Pages (1750 words) Assignment

Team Reflection

Redmine This is an Open Source project management tool with a big base of user friendly scheming features.... Team Reflection Student: Course Name: Instructor: Institution: Department: Date: Part I Introduction In accordance to the challenges that emerged from the training project for the firm “Enterprise Rent-A-Car”, the importance of management tool availed itself.... hellip; As such, this project was conducted through two open source management tool namely; ‘Microsoft Project' and Redmine....
10 Pages (2500 words) Assignment

Effective Project Planning and Management

This paper "Effective Project Planning and Management" discusses the theoretical framework for project management.... In fact the basic goal of any project management is to develop high quality engineering and technology products.... In addition, the high quality project management practice of engineering products and technology can be a realistic activity that involves project management resources for each engineer, professional, experienced architecture and managers moving into management roles....
8 Pages (2000 words) Assignment

Project Management Organazing a Sports Day

hellip; This discussion talks that effective project management is key to overall success of the projects.... In this scenario implementation of effective project management principles and technology is really necessary.... Effective leadership is the main factor in overall effective project management and its handling.... In case of effective management and handling of the project activities, we can have the overall success of projects....
3 Pages (750 words) Assignment

Cross-Cultural Project Management for International Construction in China

Cross cultural management includes communications, dispute resolutions, organizational and national culture, and negotiations.... As such, it is incumbent upon project managers to develop the skills necessary for successfully interacting with individuals whose behavioral traits are affected by distinct cultural primacies.... In the context of the global marketplace, project managers require efficient communication skills, competent leadership skills, suitable interpersonal skills, adaptability, and technical and functional powers (Pheng and Leong 308)....
7 Pages (1750 words) Assignment

Project Management Applicatio

The paper "project management Applications" describes what the programs allow a user to manage and analyze various aspects of projects.... In this project, to project management applications have been analyzed that is the Basecamp Personal application and the Mavelink.... Table for Critical Path Analysis Activity Duration Days Immediate predecessor Activities A 7 - B 10 - C 15 - D 8 E E 2 A and B F 5 D and G G 2 E H 8 G I 2 C and F J 3 I Critical Path Diagram Early start = early finish of the previous activity +1(Forward pass) Early finish= Early start + early finish-1(Forward pass) Late Start= Early finish - Early Start+1(Backward pass) Late finish= Late start-1(Backward Pass) First Path(using forward pass) ES=1 ES= 16 ES=17 EF=15 EF=17 EF=19 LS= 15LS = 16 LS=17 LF= 15LF = 2LF=0 Second Path ES=1 ES =8 ES=15 ES=17 ES=25ES=23 EF=25 EF=7 EF=14 EF=16 EF=24 EF=22 EF=24 ES=27 LS=8 LS= 15 LS =17 LS= 19 LS=23 LS=25 LF= 14 LF =16LF=17 LF=22 LF=24 LF=24 Third path ES=1 ES=11 ES=12 ES=20 ES=25 ES=27 EF=10 EF=11EF=19 EF=24 EF=26 EF=2 LS=1 LS= 10 LS=12 LS=20 LS=25 LS=0 LF=0 LF=9 LF =11 LF=19 LF=23 LF=0 Fourth Path ES=1 ES=11 ES=13 ES=15 ES= 20 ES=22 EF=10 EF=12 EF=14 EF=19 EF=21 EF=24 LS=1 LS=11 LS=13 LS=15 LS =20 LS=22 LF=10 LF=12 LF=14 LF=19 LF=21 LF=0 Fifth Pat ES=1 EF=8 EF=9 ES=11 ES=16 ES=18 EF=7 ES=8 ES=10 EF=15 EF=17 EF=20 Question two project management applications help in a wide view of solutions, from individual to team....
2 Pages (500 words) Assignment

Project Management Engineering

In the paper “project management Engineering” the author answers the question: How does a tracking Gantt chart help communicate project progress?... Gantt charts are horizontal bar charts that show all tasks and activities in a project to explain the overall schedule.... hellip; The author states that by using Gantt charts, the project manager can monitor individual tasks, as well as the overall project progress.... A tracking Gantt chart is a visual format tool for showing the status of a project's progress with respect to the schedule....
6 Pages (1500 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us