StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

The Health and Safety System at Leeds Metropolitan University - Case Study Example

Cite this document
Summary
"The Health and Safety System at Leeds Metropolitan University" paper states that a health and safety management system brings together multiple aspects including management organizational arrangements, such as planning and review, consultative arrangements. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.7% of users find it useful
The Health and Safety System at Leeds Metropolitan University
Read Text Preview

Extract of sample "The Health and Safety System at Leeds Metropolitan University"

Construction management Health and safety management system They health and safety system at Leeds Metropolitan includes, firstly, the health and safety planning components such as general health and safety policy, policies and procedures as well as health and safety planning; secondly, with two exceptions, that is, design and training strategy, the other specific health and safety program components. The management organizational arrangements (health and safety responsibilities, health and safety specialist support, supervisor activity and senior management activity) also cannot be distinguished on the basis of this system type, although particular features of the components suggest a relationship warranting further investigation. Additionally, breadth, amount as well as quality of health and safety management system activity appear independent of the system type. Leeds Metropolitan University, like other large institutions pay special attention to health and safety management system functionality. Conventionally, such systems’ successes are more realistic when measurement is based on positive outcomes rather than negative outcomes. Such measures however fail to take into consideration the risks faced by organizations and how these risks are handled but rather pay much attention to hazards encountered. As a matter of fact, this approach reports the challenges faced by health systems while failing to assess their preventive structures. Additionally, it would be preposterous to assume that a health and safety management system is a failure just because more accidents have been recorded or vice-versa. It is important to note that a health and safety management system brings together multiple aspects including management organizational arrangements, such as, planning and review, consultative arrangements, as well as specific program elements which work together to enhance health and safety performance. Elements of interest include hazard identification, risk assessment and control, contractor health and safety, information as well as recordkeeping, and training, among others. Such should therefore be accorded extreme importance in assessment of health and safety management systems. Health and management system planning The university’s health and safety system is structured such that the following are incorporated, Senior management drives health and safety changes. Implemented strategies are aimed at transforming the role of supervisor, to support rather than policing role, and more extensively to systems monitoring role of health and safety. A commitment to mobilization of all possible resources in pursuit of improved health and safety standards. A comprehensive approach to inclusion of health and safety in design of all tasks, equipment as well as procedures. A comprehensive approach to planning of health and safety training. A comprehensive approach to hazard identification and elimination through operation of across-hazard elimination programs as part of focus on systematic hazard identification and elimination. Introduce specific health and safety innovations in response to multiple stimuli, which include the need to establish solutions to the identified problems, opportunity to surpass expectations inherent in traditional systems, as well as the need to establish new ways to facilitation of employee involvement in health and safety. The university has a carefully planned health and safety management plan as is illustrated in its report/action plan. Its guidelines describe formal management inspection practices upon which the system is built and on which a continuous improvement objective is achieved. The guidelines describe not just actions expected within the university but also describe how equipment should be handled and even tested. Additionally, it details a plan for health and safety initiatives including plan on how to handle Health & Safety Training, management of stress, handling accidents, festivities, and first Aid. The centralized operations of the university allow use of a single centralized system planned to meet the needs of all the faculties in the institution. The universities’ health and safety policy statement acts as the benchmark for health and safety issues within the institution. The document is a true demonstration of the organization to enhanced health & safety within the organization. According to the policy, the center of the policy approach is building of a health and well-being policy based on eight strategic values derived from legislation, guidance, and recognized good practice. The values of which are established in the overarching policy statement, “run operational structures and reflected responsibilities and duties all stakeholders have towards safety, health and wellbeing.” At the same time, case evidence highlights deficiencies in extent of integration of health and safety management into larger workplace management systems. While an examination for linkages between system type and performance generally show a high level of integration, no area performs satisfactorily on what needs to be considered as basic integration tests, that is, rigorous integration of health and safety to management accountability mechanisms, as well as audit and review mechanisms. Other underdeveloped health and safety management system components in all cases are contractor health and safety programs. Implementation and Stakeholder involvement All stakeholders at Leeds Metropolitan University have a role to play in making the health and safety management system a success.as a matter of fact, all and sundry have a role to play in ensuring that work and study at the university go on in a healthy and safe environment. The board of governors has a responsibility to develop a Policy for safety, health and wellbeing as well as maintenance of an oversight role in ensuring the policies effectiveness. On the other hand, the corporate management team is charged with the responsibility of implementation of the Safety, Health and Wellbeing Policy, in addition to ensuring accountability at all levels across the University. The line managers are as well responsible for management of the safety, health and wellbeing of staff as well as students, visitors, contractors and other members of the public who interact with the universities’ activities. The staffs are responsible for ensuring their own safety, health and wellbeing, and liaise with line managers with regard to safety, health and well-being. On the other hand, students have a responsibility for their safety, health and well-being, as well as having an obligation to cooperate with academic supervisors with respect to safety, health and well-being. Support on the other hand act as a dedicated team available to serve the rest of the stakeholders in ensuring availability of a dedicated safety, health and well-being. Additionally, there are a number of supporting documents policies and procedures aimed at facilitating implementation of the health and safety management system. Additionally, the university has an Accidents, Incidents & Dangerous Occurrences Report in which all incidences no matter how small are recorded and hence allow collection of accident statistics for use in assessment of how successful the implemented health and safety management system is truly yielding positive results. The available information clear-cut procedures through which accidents are reported, to whom and the remedial actions taken to deal with the recorded accidents. Although no quantitative statistics are availed to support, it is evident from the vast information accidents reports that the system is fully functional and has not only reduced accident cases but also provides guidelines and assigns responsibilities in dealing with all accidental cases reported. This is emphasized in the audit report which states that, “Both faculties achieved considerable improvement in the 2010 audit as compared with the initial results for the 2009 audit. It is recommended that areas not achieving full compliance in 2010 are highlighted in the action plan for the new Faculty.” As a matter of fact, This Management System is based on nationally agreed principles, defined and developed to provide the necessary strength, flexibility and appropriate foundation for the development of a sustainable health and safety culture throughout the Partnership. An illustration is provided below, Health and safety management system are of crucial importance to every organization. Conventionally, analysis of health and safety management systems takes into account its common elements including elements are planning, performance, and performance assessment and performance improvement. Alternative, it may be wise to assess the characteristics which constitute the system including, health and safety culture, stakeholder involvement, effective audit and evidence of continuous improvement. Depreciation Methods Depreciation is defined as a systematic and rational process through which an asset’s costs are distributed throughout its life cycle. Typical, depreciation depends on the costs of the asset, its salvage value and the useful life of the asset. Based on this, a number of depreciation methods have been proposed three of which are discussed for purposes of this project. These include Straight line method, reducing-balance method, and the sum-of-the-years-digits method (Kieso, Weygandt, & Warfield, 2005). Straight-line method Typically, straight-line method is represented by the equation, Depreciation = (Cost - Residual value) / Useful life The method is simple and most common. It is calculated by deducting the salvage value of the asset from its purchase value and dividing the resulting value by its useful life. Reducing balance method Depreciation using this method is calculated by the formula, Depreciation = Book value x Depreciation rate Whereby, the book value is given as, Book value = Cost - Accumulated depreciation In this method, applies percentage depreciation on the un-depreciated amount in subsequent years. It is conventionally referred to as an accelerated method due to the fact that it results into more depreciation expense being incurred in the early years of an asset’s life and lesser depreciation in the latter years of the asset’s life (Kieso, Weygandt, & Warfield, 2005). Units-of-Production Method This approach records different amounts of depreciation based on the usage of the asset. The depreciation using this method is done using two-steps (Kalfayan, 2005). Calculate depreciation cost for every unit. This is given as the cost-salvage Value divided by total units of production. The value is then multiplied by the number of units. Depreciation calculations The six pumps and back up generating units cost £18,000,000 in total and it is anticipated that the useful life of each unit will be eight years. Resale values indicate that the units will be worth £500 000 after this time. Straight-line method Cost = £18,000,000 * 6 = £108,000,000 Residual value (Total) = £ 500,000*6 = £ 3,000,000 Depreciation = (108,000,000 – 3,000,000) / 8 Depreciation = £ 13,125,000 annually Depreciation for Year 1 13,125,000.00 Depreciation for Year 2 13,125,000.00 Depreciation for Year 3 13,125,000.00 Depreciation for Year 4 13,125,000.00 Depreciation for Year 5 13,125,000.00 Depreciation for Year 6 13,125,000.00 Depreciation for Year 7 13,125,000.00 Depreciation for Year 8 13,125,000.00 Double Declining balance method Useful life = 8 years --> Straight line depreciation rate = 1/8 = 12.5% per year        Depreciation rate for double-declining balance method              = 12.5% x 200% = 12.5% x 2 = 25% per year Depreciation for Year 1 20,250,000.00 Depreciation for Year 2 21,937,500.00 Depreciation for Year 3 16,453,125.00 Depreciation for Year 4 12,339,843.75 Depreciation for Year 5 9,254,882.81 Depreciation for Year 6 6,941,162.11 Depreciation for Year 7 5,205,871.58 Depreciation for Year 8 3,904,403.69 Sum-of-the-years-digits method In this method, depreciation is given by the formulae, Depreciation expense = (Cost - Salvage value) x Fraction Where the fraction values are given as follows,          Fraction for 1st year = n / (1+2+3+………...+ n)          Fraction for 2nd year = (n-1) / (1+2+3+……...+ n)          Fraction for 3rd year = (n-2) / (1+2+3+……..+ n) Fraction for final year = 1 / (1+2+3+……...+ n) n in this case, is the number of years for useful life. Depreciation for Year 1 2916666.67 Depreciation for Year 2 5833333.33 Depreciation for Year 3 8750000.00 Depreciation for Year 4 11666666.67 Depreciation for Year 5 14583333.33 Depreciation for Year 6 17500000.00 Depreciation for Year 7 20416666.67 Depreciation for Year 8 23333333.33 Discussion of the depreciation methods used The three depreciation methods used present different scenarios and results as summarized below, Straight-line method Double-declining method Sum-of-the-years-digits method Depreciation for Year 1 13,125,000 20,250,000 2,916,667 Depreciation for Year 2 13,125,000 21,937,500 5,833,333 Depreciation for Year 3 13,125,000 16,453,125 8,750,000 Depreciation for Year 4 13,125,000 12,339,844 11,666,667 Depreciation for Year 5 13,125,000 9,254,883 14,583,333 Depreciation for Year 6 13,125,000 6,941,162 17,500,000 Depreciation for Year 7 13,125,000 5,205,872 20,416,667 Depreciation for Year 8 13,125,000 3,904,404 23,333,333 End value 3,000,000 11,713,211 3,000,000 The straight line method and the Sum-of-the-years-digits method returns a value equivalent to the salvage value provided. However, the marginally differ in terms of approach. While straight-line method assumes that an asset will undergo same rate of depreciation during its lifetime, Sum-of-the-years-digits method presumes that an asset will initially depreciate at a slower pace and eventually depreciate at a higher rate towards the end of its useful years (Marston, 2012). This is actually the reverse of double declining method which assumes that an asset will undergo rapid depreciation during its early life, slowing down as it ages. Straight-line method is therefore recommended where the asset is expected to depreciate at a uniform rate through its lifetime. On the other hand, double declining balance method is more applicable where the asset is expected to initially depreciate at a fast rate before eventually taking a slow pace. On the other hand, the Sum-of-the-years-digits method is more applicable for assets which deteriorate slowly until such time that they are close to the end of their useful and begin depreciating much faster. Relevance of depreciation in infrastructure assets Infrastructure assets form part of huge investments and are often an effort of both the public and private sector. Conventionally, depreciation is defined as a reduction in value of the asset due to usage, elapsing of time, wear and tear, depletion as well as a myriad other factors. Depreciation allows for allocation of the cost of a capital asset over the asset’s useful life. Depreciation takes into account decrease in service potential of infrastructure capital assets invested in a venture, resulting from acts such as physical wear and tear in use, deterioration through natural elements or obsolescence as a result of technological changes (Kieso, Weygandt, & Warfield, 2005). As a matter of factor, it is useful in reflection of the loss in value. References Allan, N. (2006). Strategic risks: thinking about them differently. Proceedings of ICE Civil Engineering 159, p. 10–14 Arditti, F.D. (1996). Derivatives: A Comprehensive Resource for Options, Futures, Interest Rate Swaps and Mortgage Securities. United States of America: Harvard Business School Press Baker & M. (1996).Infrastructure project: The Guide to Financing Power Projects. Playhouse Yard: Euromoney. Banks, E. (2007). Credit Risk of Complex Derivatives. Basingstoke: Macmillan. Bantas, H. (2009). Fixed Assets and Depreciation. Greece: Reluctant Geek Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23, p. Buckley, A. (2004). Multinational Finance (5th Ed). Essex, United Kingdom: Prentice Hall. Chance, D. M. (2002). An Introduction to Derivatives and Risk Management (5th Ed). Orlando: Harcourt College Publishers. Clifford, C. (2003). Infrastructure project. London: IFR Publishing. Donaldson, T.H. (2006). The Traditional Approach, in Project Lending. Edinburgh: Butterworths. Esty, B. (2003). “The economic motivations for using infrastructure project”, mimeo, Harvard Business School. Hainz, C. & Kleimeier, S. (2003). “Political risk in syndicated lending: theory and empirical evidence regarding the use of infrastructure project”, LIFE working paper 03–014, June. Hoffman, S. L. (2001). The Law and Business of International Infrastructure project (2nd Ed). Ardsley: Transnational Publishers Inc. Kalfayan, J. (2005). Mastering Depreciation. Lisbon: Amer Inst of Professional Kieso, D. E., Weygandt, J. J., & Warfield, T. D. (2005). Intermediate Accounting. London: McGraw Hill Publishers. Lewin, C. (2006). Enterprise risk management and civil engineering. Proceedings of ICE Civil Engineering 159, p. s 4–9 Paper 14895 Marston, A. (2012). Engineering Valuation and Depreciation. Iowa: Iowa State Press Nevitt, P. K. (2000). Project Financing (7th Ed). London: Euromoney, 2000. Perry, J. G. & Hayes, R. W. (1985). Risk and its management in construction projects. Proc. Insin Civ. Engrs. Part 1, p. 499—521 Raz, T. & Michael, E. (2001). Use and benefits of tools for project risk management. International Journal of Project Management, 19, p. 9 – 17. Smith, M.R. (2002). Infrastructure project in the Utilities Industries, in Project Lending. London, United Kingdom: Butterworth’s. Smith, N. J. (2003). Appraisal, risk and uncertainty. London: Thomas Telford Publishing, Thomas Telford Ltd. Smith, V. (2007). Infrastructure project Review, International Infrastructure project Lecture Note, CEPMLP, Unit 1. Tinsley, R. (2005). Infrastructure project: Infrastructure project Risks, Structures and Finance ability (2nd Ed). London: Euromoney. Vinter, G. D. (2006). Infrastructure project (3rd Ed). London: Sweet and Maxwell. Wilson, R. (1982). “Risk measurement of public projects”, in Discounting for time and risk in energy policy, Resources for the Future, Washington DC. Civil engineering project, like other projects undergo typical phases from the time they are initiated to their time of completion. More often than not, a project has to go through all the phases in order to achieve successful completion. A typical project will go through appraisal stage, planning stage, implementation stage and project view. These are highlighted in the table below, Stage What takes place Appraisal The needs are identified, broad parameters of a solution are agreed upon, and an Approval-in-Principle is granted. Planning The needs are quantified and the assumptions verified, desired outputs are specified, and a solution is designed. Implementation The solution is constructed. Project review An assessment is carried out as to how successfully delivered solution addresses pre-defined needs. However, other typical civil engineering project cycles have been discussed widely by bot researchers, policymakers, and many other stakeholders. The figure below provides a widely embraced step by step illustration of the phases involved in a civil engineering project cycle. Figure 1: Civil Engineering Project Phases The framework forms the basis for this paper’s discussion of the phases involved in civil engineering projects. The figure displays sequence of major phases through which the development of the project passes, alongside the main activities that Sponsoring Agency or personnel and/or consultants must undertake during every stage and project reviews which take place at major project development points. The phases considered are listed below; Phase 1: Concept and Feasibility Studies This is the stage where a project is proposed to solve a problem or address a need. Such could be the conception of an idea to construct a dam to solve water problems of a community, construct a bridge to improve accessibility of an area or to construct a tower to address office needs of a particular organization. The organization then submits the evaluation and selection process. Evaluation is a vital step in the life cycle of any given project. More often than not, project failures are a product of inappropriate evaluation measures and hence lack of appropriate controls. Generally, evaluation of a project takes the form of formative assessment and evaluation. All the aspects are dependent on collected data. As earlier mentioned, data differ in importance as well as importance to a program evaluation process. This without a doubt highlights the importance of selecting data that are not only relevant to the areas of the project being evaluated, but also offer reliable information to aid the process. Kaufman et al (2006) notes that validity and reliability of data are key to a successful evaluation of any given project proposal. Data offers the basis upon which factual conclusions are drawn. They offer a basis upon which evaluators able to evaluate and make adjustments to various aspects of the proposed project. Amongst the areas addressed during this phase include; Forecasted Future Demand Location Resources’ availability Transportation access Political and Institutional Challenges Sociological as well as Economic Impact on the host Community Environmental Impacts Overall Technical and Economic feasibility Its accomplishment brings together not just engineers but a team of specialists including economists, geologist and environmentalists, among others. Phase 2: Project initiation This is the phase where a project manager is assigned. The project manager works and in hand with the Project Sponsor in order to establish resource requirements as well as the needed team members to help in further development of the projects parameters. Such parameters include project costs, scope, schedule, as well as quality Clifford, C. (2003). These are all documented in form of a project charter whose preparation is largely based on the proposed project. The sponsor’s approval of the Project Charter marks authorization of the designated team to start initial planning effort. The initial Project Plan arising from project initiation differs in terms of detail’s levels as well as validity of estimates from the first phase and hence need to attain sufficient levels to get additional resources required for the progress to proceed. This phase of the project also includes plans for involvement and communication with all the stakeholders, in addition to, identification of an initial set of foreseeable risks which pose threat to the project’s successful continuity. At the end of this process, based on initial evaluation, the case is revised and re-assessed and a decision arrived at, whether to halt the project, or proceed to the next phase. Phase 3: Engineering and design This is the phase where the real experts including engineers, architects, geologists, and economists, among others are brought on board. Information on client’s needs is translated into three dimensional physical solutions including buildings, roads, and bridges, among others. Design activities take place at all stages. The phase can be categorized into preliminary and detailed design sub-components. Among the major activities included in the preliminary stage include; Architectural concepts Technological process alternatives assessment Size and capacity assessment Comparative economic evaluation Regulatory compliance assessment Zoning regulations Building codes and standards Licensing procedures Safety standards Environmental impact assessment  On the other hand, the detailed engineering design stage involves the following: Design of Architectural Elements Design of Structural Elements Site Investigation Foundation Design Electrical and Mechanical Design Preparation of Specifications and Drawings Preparation of Contract Documents Tender documents are also prepared in this phase. These include; Project Charter Project Scope Statement Project Management Plan General Conditions Supplementary Conditions Technical Specifications Full and Detailed Drawings Amongst the likely contracts are; A101 Standard Form of Agreement between Owner and Contractor – Stipulated Sum A111 Standard Form of Agreement between Owner and Contractor – Cost of the Work plus a Fee A201 General Conditions of the Contract for Construction B141 Standard form of Agreement between Owner and Architect A132 Performance Bond and Payment Bond The stage paves way for procurement. Procurement involves two major tasks, that is, contracting and sub-contracting of services, both for general and specialty works and the other is obtaining of materials and equipment required for the project’s construction. These are best summarized in the figure hereafter; Phase 4: Project Execution and Control This is the phase at which lots of resources are put to use in advancement of the project. A significant number of team members join the project at the start of the phase. The primary task of Project Manager during this phase is enabling execution of tasks on defined Project Schedule and development of the product/service expected to deliver. The Project Manager puts to use processes and plans prepared during Project Initiation and Planning to manage the entire project, while preparing the respective organization for implementation of product/service and transitioning of the product/service responsibility to the organization. In general, the project manager coordinates of all resources to complete the project on schedule, on budget, and according to Specified Standard of Quality and Performance. Phase 5: Project Closure and hand-over In this phase, the team assesses outcome of the project, and their as well as performance of the contracting organization. It also involves testing of components and giving a warranty period. Based on the contract, this may extend to regular maintenance of the project. References Clifford, C. (2003). Project Management. London: IFR Publishing. Donaldson, T.H. (2006). The Traditional Approach, in Project Management. Edinburgh: Butterworths. Esty, B. C. (2005). An overview of project Management: update. Harvard Business School Case. Smith, V. (2007). Project Management Review, International Project Finance Lecture Note, CEPMLP, Unit 1. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(The Health and Safety System at Leeds Metropolitan University Case Study Example | Topics and Well Written Essays - 3500 words, n.d.)
The Health and Safety System at Leeds Metropolitan University Case Study Example | Topics and Well Written Essays - 3500 words. https://studentshare.org/engineering-and-construction/1814104-civil-engineering-management
(The Health and Safety System at Leeds Metropolitan University Case Study Example | Topics and Well Written Essays - 3500 Words)
The Health and Safety System at Leeds Metropolitan University Case Study Example | Topics and Well Written Essays - 3500 Words. https://studentshare.org/engineering-and-construction/1814104-civil-engineering-management.
“The Health and Safety System at Leeds Metropolitan University Case Study Example | Topics and Well Written Essays - 3500 Words”. https://studentshare.org/engineering-and-construction/1814104-civil-engineering-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Health and Safety System at Leeds Metropolitan University

To Explore the Model of Future Intelligent Buildings via the 2010 Shanghai World Expo

These underling needs must be satisfied first include, among other things, safety, shelter, and belonging.... The concept of an intelligent building has been in vogue since the last 25 years.... Yet until now very little discussion or study has been undertaken to explore the universal applicability of a green building....
54 Pages (13500 words) Dissertation

Application in Australian Health System

Health professional mobility changes the health workforce in both the sending and receiving countries.... The gains and losses strengthen and weaken the overall performance of the health systems.... Outflows of these professions can impact the health system performance when the skills involved are rare and essential.... Globalization of the health workforce is a major factor in the global development of the knowledge economy (Palmer and Ho, 2008)....
10 Pages (2500 words) Essay

The Significance of a Paediatric Retrieval Service

According to university Hospital Southampton (2011), the Paediatric Retrieval Service consists of a highly skilled team who have specialist training in the transfer of sick children from other hospitals to the Paediatric Intensive Care Unit.... hellip; According to the data presented by the Paediatric Intensive Care Audit Network in its Annual Report, there are 52,337 paediatric intensive care admissions aged below 16 years of age to 29 National health Services trusts and health authorities, over the three year period from January 2008 to December 2010 (Paediatric Intensive Care Audit Network, 2011)....
13 Pages (3250 words) Essay

Police Strategy Assessment

This paper explores the use of the police operational strategy of community policing in fighting the crime of burglary in metropolitan neighborhoods.... However, it regarded as an incomplete offense as only the security and the safety of the house or premise broken into is compromised....
9 Pages (2250 words) Assignment

Requirements for Dental Office Network Design

The network shall contain metropolitan Area Network components integrated in manner that it supports the Local area Network (Stair & Reynolds, 2010).... Protection of information is a requirement of health Insurance and Accountability Act (HPAA).... Dental office network design Name Professor Institution Course Date Analyze the given case and provide a clear set of requirements for the network solution Operation of a single dental office does not require a lot of attention in terms of network solutions as compared to several offices....
4 Pages (1000 words) Case Study

Social Policy and Childhood Play

health consciousness is also considered in this framework.... The essay "Social Policy and Childhood Play" focuses on the critical analysis of how different perspectives on childhood and the current social policy context impacts children's opportunity to play.... nbsp;What is morally right and socially acceptable is learned from childhood play....
11 Pages (2750 words) Essay

Improving the Human Conditions

All the experiences with smallpox, yellow fever, measles, and poliomyelitis vaccines have focused on using an attenuated virus that could replicate in the host initially, would not harm the host, yet would provide enough stimulus for the host's immune system to combat and clear the viral infection.... For reasons that are not yet clear but may reflect the victim's high level of viral load and unique properties of the virus, both the humoral (antibody) and cellular (CTL) arms of the immune system respond vigorously to HIV throughout the course of infection, yet some of the viruses remain in place (Campbell, 2003)....
4 Pages (1000 words) Essay

Safety Structures and Systems in Adams Park and Wembley Stadium

That is the reason why when public venues like stadiums and parks are been designed, the authorities take precautions to include safety systems and structures.... his paper will be looking at the safety structures and systems in two stadiums, comparing and contrasting them.... To this end, many organisers put in place safety management systems that are aimed at providing safety for the crowd and at the same time managing it.... The event organisers are helped to a great length by safety structures and systems that are already incorporated in the venue, be it a stadium or a park....
12 Pages (3000 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us