"Construction Product and Process Technologies" paper examines the speed of construction, availability of resources (materials, labor, plant, and equipment), logistics, and proposed falsework and formwork system for the casting of the floors to the structural frame…
Download full paperFile format: .doc, available for editing
Extract of sample "Construction Product and Process Technologies"
Construction Product and Process Technologies 26 July Since the Structural Engineer proposes the use of an in-situ concrete frame for this project there will be implications relating to the construction speed, availability of resources and logistics. In-situ reinforcement concrete structural frames are commonly employed as frames for multi-storey office buildings.
i. Speed of construction
The use of an in-situ concrete frame will provide flexibility that may improve the speed with which the project is being carried out. In-situ reinforcement concrete can also be casted into various shapes and designs by using an appropriate formwork. This improves efficiency and the possibility of customising the available design solutions to fit specific construction problems, thereby increasing the speed of construction in this project. Using an in-situ concrete frame for this project will lead to speedier construction and thus a reduction in construction costs and faster revenue generation.
ii. Availability of resources (materials, labour, plant and equipment)
The use of an in-situ concrete frame for this project is advisable, since in-situ concrete is widely used for construction projects and the materials for such a frame are readily available (Riley & Cotgrave 2009). This availability of resources (i.e. materials, manpower, plants and equipment) also enables better aesthetics and cost efficiency for the project.
iii. Logistics.
The engineer’s decision to use an in-situ concrete frame for this project is a sound one logistically because the concrete can be readily obtained from many locations. Using an in-situ concrete frame here is appropriate as such a frame will be economical because of its longevity and facilitation of the construction process. The in-situ concrete used for making the frame is also recyclable, as old concrete frames can be reused as aggregate for new concrete mixtures (Barry 1996). An in-situ concrete frame would be a more economical choice for the project because of its longevity and construction facilitation.
2. Using in-situ concrete flat slabs for the floors in association with an in-situ concrete frame for this project will yield good results as described below:
i. The chosen floor provides the necessary sound and fire resistance to a high degree.
In-situ concrete flat slabs for the floors will enable a high degree of fire resistance and fire proofing in the construction project since in situ concrete is originally fire-resistant as well having no need for any additional treatment for fire protection and the required structural qualities at the same time (Chudley 1999).
ii. In-situ concrete flat slabs floors provide an economic and efficient production method.
In-situ concrete flat slabs floors enable design flexibility and so the floor slabs can be casted into various design shapes with the use of the suitable formwork. This flexibility results in the ability for customized design solutions that will fit the specific challenges faced for this particular building project and enables aesthetic finishing that nullifies the need for any further finishes for the floors.
Using in-situ concrete slabs for the floor will enable an efficient and economic method of production, as in-situ concrete slabs are cost efficient and aesthetically pleasing. In-situ concrete slabs possess high strength, low maintenance requirements and long-term durability. The slabs will also provide a competitive construction solution due to their high energy efficiency and long-term economic advantages. In-situ concrete slabs also enable the engineer to have a wide range of structural design options.
3. Leaving the underside of the concrete slabs (as in number 2 above) and the services exposed will have some advantages and disadvantages during the production stage and throughout the life of the building.
Advantages
Increased speed of construction
Shorter duration of construction can be achieved, as well as the possibility of building of structural frames economically.
Possibility of making any alternations or adjustments to the design during the building construction process.
Significant reduction of plant and labour on the site.
Disadvantages
May be labour intensive, thereby leading to a situation where higher amounts of plant and labour are required on the site.
On the other hand, concealing the underside of the concrete slabs above a suspended ceiling will also have some advantages as well as disadvantages.
Advantages
Higher quality control
Disadvantages
Impossibility of carrying out any adjustments or amendments to the underside of the concrete structure during installation.
4. Proposed Falsework and formwork system for the casting of the floors to the structural frame discussed in number 1 above.
i. The proposed falsework and formwork system for the casting of the floors to the structural frame discussed in number 1 above is a traditional wood post-and-beam formwork/shoring system. The description of this system as provided here is an adaptation of the system described by Jensen (1986). For this system, the deck (slab) forms will be supported on shores that are placed on the lower slabs. These shores can be single posts of wood (Jensen 1986).
This falsework and formwork system for the casting of the floors to the structural frame will achieve the required degree of accuracy for the project, since allowance will be made for sideways pressures like stacked materials, wind, and the formwork being struck by crane loads and other machinery, as well as taking care of weight support.
ii. In a building project like this, the structural frame is one of the most important aspects that must be considered even before embarking on the construction. It is therefore critical to the success of the project to evaluate the criteria for selecting the appropriate building materials and structural frames (Stroud & Harington 1994).
In order to ensure structural safety during the project as well as satisfactory performance, it is also important to have a good understanding of the construction loads on the concrete slabs and frames from an early stage (Low, Tadros & Nijhawan 1991). There are several features that are to be included in the proposed falsework and formwork above in order to reduce the risks to the health and safety of the operatives in the project to an acceptable level. These include the use of sheer walls, tube-in-tube structures and braced tube structures.
Sheer walls are employed for the provision of stability in multi-storey buildings due to the fact that lateral loads in this kind of project will usually be a very dominant factor in the planning and design of the building as a whole.
Tube-in-tube structures are used in catering to drift and acceleration for the assessment of the stability of the building.
Braced tube structures are to be used for adding re-shores on the lower levels to reduce and redistribute big constructional loads on the floor to the other lower levels of the building.
Bibliography
Barry, R. (1996) The Construction of Buildings: Multi Storey Buildings, Foundations, Steel
Frames, Concrete Frames, Flooring and Wall Cladding, 4th edition. London: Blackwell
Science.
Stroud Foster, J. & Harington, R. (1994) Mitchells Structure and Fabric. 5th edition. Harlow:
Addison Wesley Longman Limited
Jensen, D. A., (1986) Choosing a Forming System for Concrete Floors and Roof. Concrete
Construction, 81, (1) pp. 5-12.
Riley, M. & Cotgrave, A. (2009) Construction Technology 2: Industrial & Commercial Building,
Second Edition. London: Palgrave Macmillan.
Chudley, R. (1999) Construction Technology. Harlow: Addison Wesley Longman Limited.
Low, S., Tadros, M. K., & Nijhawan, J. C. (1991) A new framing system for multi-story
buildings. Concrete International, 13 (9), 54-57.
Read
More
Share:
CHECK THESE SAMPLES OF Construction Product and Process Technologies
The second part of the process involves actual costing, detailed work scope and the comprehensive construction plan.... he ER intends to draw the statutory requirements and the desire of the management involved with the project to ensure that the construction will be implemented seamlessly.... The list of Employers Requirements (ER) is a critical step in which most construction projects are initiated.... The other players are the residents living adjacent to the proposed location which will likely be affected by the construction....
This article will explore the subject of emergent technologies in commercial construction under the following divisions: energy conservation and the benefits of biomimicry; future energy delivery models; smart technologies; future construction techniques and innovative material usage.... According to this research the emergent technologies in commercial construction offer retaining the way of life and comfort instead of forgoing certain pleasures for the sake of energy conservation....
It could happen the other way around too; regressive societies could not only hinder technological reconstruction but also gave birth to regressive technologies as happened in Fascist Germany.... Therefore, it is possible to argue that technologies are socially constructed.... The social construction of technology challenges the monopolistic claims by the science and scientific community on the production of technologies.... Non-deterministic 'accounts of artifacts and technologies show that scientific knowledge plays a little direct role in the development of even many state-of-the-art technologies....
This is despite the limited available technologies at the local levels.... One of the technologies synonymous with recycling in the construction industry in modern times includes the “Recore technology” known for the construction of walls by use of recovered waste materials.... This process is widespread among many industries in the globe with the construction sector not trailing behind.... In enhancing the value brought in by this process, a lot of modifications have been made on it time after time....
Some quarters of debaters have even said that a major driving force behind a successful green campaign is the industrial process whereby the various processes that go on in manufacturing and production will be treated with a sense of urgency for the conservation of the environment (Zinc Worldwide, 2011).... In the present paper, the electrical construction industry shall be used as a case study whereby a critical analysis of the industrial process that takes place during electrical construction shall be undertaken to understand the options of sustainability available for industry players and how best they have played their roles in ensuring that these roles are well played....
Decision making process of the organizational factors and key management associated with the incident before, during and after the actual massacre of CTV building.... From the detailed analysis in this chapter, it has been found that there were high extend of inefficiency of the top management in terms of their key responsibilities and ethical work practice and their ineffectiveness decision making process.... Analyse and Evaluate the Decision-making process of Key Management and the Organisational Factors Associated before, during and after the Incident of CTV building collapse 9 4....
he federal government has participated alongside industry in this process.... These structures are often of similar construction type design, and materials.
... projects such as the sovereign Harbor development in East Bourne are taking advantage of ICF's fast track construction....
They are several technologies that are applicable in combination of the said layers or slices in this technology to come up with a solid object, thus this technology is perceived as construction of a definite solid shape from individual building units of given size.... In the process of manufacture the three-dimension design of the object to be produced should be well described with respect to its dimension....
11 Pages(2750 words)Article
sponsored ads
Save Your Time for More Important Things
Let us write or edit the assignment on your topic
"Construction Product and Process Technologies"
with a personal 20% discount.