StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

A New Tunnel under the Thames - Essay Example

Cite this document
Summary
Outline: Introduction Desk Study including location, background, relevant history, reasons for the crossing etc. Description of the access sites and existing features 2. An outline of the CDM requirements you would need to consider for this project. 3. An outline of the roles played by a Land/Engineering Surveyor, a Construction Manager and a Civil Engineer applied specifically to this project…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.5% of users find it useful
A New Tunnel under the Thames
Read Text Preview

Extract of sample "A New Tunnel under the Thames"

Download file to see previous pages

7. Include a set of drawings of your proposed tunnel, including a. a detailed cross section, b. a long section c. a map showing your suggested new road layout and d. a map indicating remedial works to minimise the impact of the extra traffic on the surrounding areas. 8. The site designated for the northern access (between Galleons Reach DLR and the river) is currently a brown field site with possible contamination, which includes an infestation of Japanese knotweed and some fly-tipping which may contain asbestos.

Explain the procedures needed to bring the site into a condition suitable for construction. A new Tunnel under the Thames Introduction A tunnel is a subversive vessel, entirely covered a part from openings for entrance and exit, usually from both ends. A tunnel can be constructed for foot passage, rail, vehicle traffic, or a canal. The new Thames river crossing will allow closing of the Wool Wish Ferry. The bridge will relieve congestion for people living adjacent to Blackwall. This marks the location of Thames Gateway Road Bridge that was scrapped by the mayor in 2008, following the rejection of the plan by the Inspector at a Planning Inquiry.

The tunnel, which will run from Greenwich Peninsula to the royal Docks, is expected to have a capacity of up to 2400 cars per hour in each route. While the link is very much worthy and will perhaps help reduce the severe overcrowding in the city, it will tamper with Blackwall Tunnel, making the suggestion for a Gallions Rach ferry a laughable alternative for the Thames Gateway Bridge. In addition, it raises questions with regards to the future of the current Woolwich Ferry. Supporters of environmentalists are likely to criticize the scheme of the tunnel, alleging that it would bring problems to people of London by creating more traffic, noise and more pollution.

Furthermore, if the leaders in this region want to make London one of the world’s greenest capitals, their policies should be much focused (Irshad, Wagner & Mussger, 2003). Since the era when Brunel made the first Thames tunnel, which was called Rotherhithe Tunnel, the tunnel construction has undergone great breakthrough, especially between 1825 and 1842. Tunnel constructions during these times were done through a rectangular safeguard with a miner revealing the face. The dimensions of the shield were 29ft high and 33ft wide, with brick coating after the miners and an arch brick being constructed.

Nonetheless, tunneling will remain a risky activity since the conditions can never be certain, regardless of the number of boreholes that are taken. Furthermore, it is not uncommon to find tunneling gaining more prominence in the next few decades. The proposed Thames Tunnel will occupy a distance of 25 kilometers from west London. It will be 67 meters below the ground and will widely follow the direction of Thames River. According to the environment agency, this tunnel will link 34 of the most contaminated sewer outflows (Munfah 2003).

CDM requirements CDM regulations background Areas where CDM is applicable and those areas where it is not applicable General health and safety practices and laws Recognition of accident prevention, causation and prevention. Risk management practices Control procedures and reviewing and monitoring requirements Roles of different professional Land/engineering survey Land surveyors establish and give recommendations on the

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“A New Tunnel under the Thames Essay Example | Topics and Well Written Essays - 1500 words”, n.d.)
A New Tunnel under the Thames Essay Example | Topics and Well Written Essays - 1500 words. Retrieved from https://studentshare.org/engineering-and-construction/1453634-name
(A New Tunnel under the Thames Essay Example | Topics and Well Written Essays - 1500 Words)
A New Tunnel under the Thames Essay Example | Topics and Well Written Essays - 1500 Words. https://studentshare.org/engineering-and-construction/1453634-name.
“A New Tunnel under the Thames Essay Example | Topics and Well Written Essays - 1500 Words”, n.d. https://studentshare.org/engineering-and-construction/1453634-name.
  • Cited: 0 times

CHECK THESE SAMPLES OF A New Tunnel under the Thames

Construction Health and Safety: The Crossrail Project

This became a reality when the 2008 Crossrail Act gave the sponsors of Crossrail, TfL and DfT powers to construct and operate the railway which links the Great Western and Great Eastern railways through a new tunnel system passing through the capital city London, with a capacity of holding 24 trains-per-hour.... Halcrow (2011) reveals that, under the project, new tunnels will be built from Paddington in the west, all through to Stratford then to Canary Wharf situated in the Eastern side of the country....
4 Pages (1000 words) Essay

Visiting the Construction of the New York Transport System Then and Now

Using his shield, Brunel completed the world's first underwater tunnel through soft earth, under the thames, in 1843.... Thousands crossed the thames daily, either by ferry or over London Bridge.... As the shield progressed, other workers would lay bricks on the inside surface of the new tunnel to support it.... Had there been another subway under New York before the one they were digging?... THE tunnel diggers gazed in disbelief at what they had uncovered....
9 Pages (2250 words) Case Study

The Need for a Thames Tunnel

There was no land that could connect the South and north banks of the thames and to connect the expanding docks on either… It was designed and constructed between 1825 and 1843 by engineer Marc Brunel.... In early 19 century, there was no land that could connect the South and north banks of the thames and to connect the expanding docks on either side of the River.... It was reported that after 1000 feet of the total 1,200 feet became flooded, the thames Archway project was abandoned....
10 Pages (2500 words) Research Paper

Visiting the Construction of the New York Transport System Then and Now

Thousands crossed the thames daily, either by ferry or over London Bridge.... Had there been another subway under New York before the one they were digging?... THE tunnel diggers gazed in disbelief at what they had uncovered.... he room led to a tunnel.... Deep beneath the streets of new York City, while excavating an extension of the newly built subway, they had broken into a large hidden chamber....
9 Pages (2250 words) Coursework

Measured Building Survey

"Measured Building Survey" paper examines the types of survey depending on cost, work conducted, and detail of the structure and qualifications of type surveyor.... The survey types are a full structural survey, major defects survey, homebuyer report, and specific survey.... hellip; A construction manager ensures that important jobs should be completed before the project commences....
9 Pages (2250 words) Coursework

Fire-Safety in the Channel Tunnel

nbsp;It was 18th November 1996 when train laden with heavy good vehicles just made its way through the Channel Tunnel connected under the sea between France and England, suddenly caught fire.... nbsp;It was 18th November 1996 when train laden with heavy good vehicles just made its way through the Channel Tunnel connected under the sea between France and England, suddenly caught fire.... … The paper "Fire-Safety in the Channel tunnel " is a good example of a case study on engineering and construction....
9 Pages (2250 words) Case Study

Advancement of Storm Water Tunnels

For instance, the Brunel's Thames Tunnel was the first tunnel that was constructed to cross under the tidal river and first shield the driven tunnel.... However, the construction of tunnels is still under several studies since there is a need to upgrade the design of the tunnels according to the needs and time.... A tunnel is along an underground passageway that is completely enclosed except for the openings for exit and entrance, commonly at every end....
6 Pages (1500 words) Essay

Fires Safety of Underground Trains

… FIRE SAFETY OF UNDERGROUND TRAINSIntroductionThe underground railway system has been put in place to solve transport problems on the surface especially in congested metropolitans.... Apparently the benefits of mass transport in today's world cannot be FIRE SAFETY OF UNDERGROUND TRAINSIntroductionThe underground railway system has been put in place to solve transport problems on the surface especially in congested metropolitans....
22 Pages (5500 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us