The Channel Tunnel: An Analysis - Essay Example

Comments (0) Cite this document
Summary
Joining Britain and France with only 34 kilometres between them was only a dream in the 1800s, but in 1994, it finally became reality. Above-ground conditions between these two countries are not exactly friendly so that only underground avenues had to be exploited to serve the purpose of a railway…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER96.4% of users find it useful
The Channel Tunnel: An Analysis
Read TextPreview

Extract of sample
"The Channel Tunnel: An Analysis"

Download file to see previous pages The tunnel was said to be officially opened by Queen Elizabeth II and French President Francois Mitterrand in a ceremony held in Calais on May 6, 1994. Eurostar trains now travel at high speeds in France and upon the Channel Tunnel Rail Link, where the tracks are modern and custom-made for the standard cruising speed of 300 km/h.2
The Channel tunnel has been declared by the American Society of Civil Engineers to be one of the Seven Wonders of the Modern World.3 However, the venture was not without many hassles. In fact, the construction had faced a stop-gap measure with at least three attempts at construction - non-construction. This may be perceived as normal among gargantuan projects, considering its capital cost of nearly 5 billion,4 its period of construction stretching so many years with several interruptions, and with intricacies primarily from its character of being below ground and even below sea-level.
It is said, all significant human undertakings can be viewed as projects and that some have more successful outcomes than others. Channel Tunnel in this paper is examined using the project management approach.5 Particularly, it shall look into the "how" of project delivery, examining process. Evaluating the project management allows learning from its successes and mistakes. ...
The project. The Channel Tunnel, also known as 'Euro-tunnel' or 'Chunnel', is a series of three tunnels - two carrying and one service tunnel - linking England to France. The longest undersea tunnel system in the world, the tunnels are 50km long, with an undersea section of 39 km.7 It has a smaller access and emergency evacuation tunnel between them, and through the chalk marl beneath the water,8 it runs underground under the English Channel.9 Through over seven years, 15,000 workers dug for the tunnel from both ends simultaneously. The prime contractor for the construction was the Anglo-French TransManche Link (TML), a consortium of ten construction companies and five banks of the two countries. 10
At that time, this was Europe's most prestigious engineering project. The tunnels were lined with precast concrete segments and, where considered necessary, with cast iron. Linked by cross-passages, the service tunnel provides ventilation and enables access for evacuation in emergency situations. In addition, the tunnels contain cooling pipes, fire-fighting mains, drainage pipes, ventilation equipment, signalling and communication systems and extensive monitoring and control systems. 11
On each side of the Channel, two major terminals were built and linked directly to the respective national road and motorway networks. The road vehicles are carried on shuttles which operate on a loop system between the two terminals. Through-trains directly between London, Paris and Brussels Passengers and freight, passengers are carried on at speeds up to the maximum allowable of 130 km/h.12

B. The business case. By the definition of the Office of Government Commerce (OGC) of the United Kingdom, Channel Tunnel would be more of a program than a project because it is a component of ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“The Channel Tunnel: An Analysis Essay Example | Topics and Well Written Essays - 2000 words”, n.d.)
Retrieved from https://studentshare.org/architecture/1527096-the-channel-tunnel-an-analysis
(The Channel Tunnel: An Analysis Essay Example | Topics and Well Written Essays - 2000 Words)
https://studentshare.org/architecture/1527096-the-channel-tunnel-an-analysis.
“The Channel Tunnel: An Analysis Essay Example | Topics and Well Written Essays - 2000 Words”, n.d. https://studentshare.org/architecture/1527096-the-channel-tunnel-an-analysis.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
The Channel Tunnel Project: Initial Planning, Actual, Execution Recommendations
Based on this research the success of the Channel Tunnel project is an astounding feat in both technical terms as well as management terms. The Channel Tunnel project provides a host of different opportunities for learning and improving on existing project management knowledge so that the problems experienced in this project can be avoided elsewhere.
12 Pages(3000 words)Essay
Problems with the Channel Tunnel Project
The essay aims to pay special attention to the problems with the Channel Tunnel Project. A number of complex factors and situations were responsible for creating delays and overruns through the life of the project. These factors will be looked at in detail from the perspective of the planning and implementation phases that represent the greatest project management problems.
12 Pages(3000 words)Essay
The Channel Tunnel Project: Critical Assessment and Probable Upgrading
The researcher of this paper provided a detailed critical analysis of the current and past decisions that have been taken which will again put forth the aspects that need to be improved. Hence, the major question under discussion and evaluation is “whether or not through better project management strategies, the Channel Tunnel project could have been made?”
12 Pages(3000 words)Essay
The Channel Tunnel Project
The most amazing fact about the project is that it has been positioned 45 meters deep into the sea level. But during the manufacturing phase it suffered huge losses due to improper project scheduling and work break down. The project also incurred loss in its initiation phase due to consecutive alteration and modification in the designing of the project.
8 Pages(2000 words)Essay
A New Tunnel under the Thames
4. A list of the official bodies/authorities that would need to be contacted 5. an environmental impact analysis 6. Compare THREE methods of tunnelling, choosing one to be used in this project, explaining why you choose this method and rejected the others.
6 Pages(1500 words)Essay
Channel tunnel
two used for rail and the third one used for maintenance which allows mixed traffic by way of special ‘shuttles’ that carry cars and national trains. The Service Tunnel Transport System that is used for maintenance is made up of 24 twin – cab, rubber tyred vehicles that travel at a speed of 80kmph.
3 Pages(750 words)Essay
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
Resources management is a fundamental aspect of the construction phase of the Channel Tunnel Project, which ensures that the resources are applied objectively towards their intended purposes, without any mixing of the resources of the different project activities (Lycett, 2004 p294).
3 Pages(750 words)Term Paper
Financial management of channel tunnel
Much of the financing for the tunnel had come from debt and at the end of 1997; eurotunnel had debt obligations in excess of 5,000 millions, raised from a variety of bond issues and bank debt. Adding the expected interest payments and coupon payments on the debt brings the total obligation of the firm up to 8,865 million.
8 Pages(2000 words)Essay
Channel Tunnel (between UK and France)
Its foundation has been on the basis of its big size and the amount of time it cuts down for the passengers traveling through trains. The Channel Tunnel is one of the busiest international railways in the world.
3 Pages(750 words)Essay
Comparison between the Channel Tunnel (UK, France) and the Seikan Tunnel (Japan)
Although the Seikan Tunnel in Japan is longer with its 53.85 kilometer measurement, the Channel Tunnel has however the longest undersea portion among all the tunnels in the world (Rail Europe, 2009). The Channel
12 Pages(3000 words)Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Let us find you another Essay on topic The Channel Tunnel: An Analysis for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • Miscellaneous
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us