StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Construction Project Management - Essay Example

Comments (1) Cite this document
Summary
The recent global economic crisis virtually affected various facets of business in the United Kingdom and the world at large and the construction industry was also not spared. This prompted organisations to review their business strategies by virtue of looking at the possibility…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER96.3% of users find it useful
Construction Project Management
Read TextPreview

Extract of sample "Construction Project Management"

Download file to see previous pages Current projected demand for planned wind farm construction ranges between US$ 8 – 10 billion, based on an estimate of US$ 200 million for 50 MW wind farms (European Bank, 2011 and Bobylev, 2009). Wind power in Russia is still low compared to other European countries. Thus, the following are some of the anticipated large projects in Russia:
However, it has been observed that factors such as corruption, differences in language and culture, a tendency by the government to indulge in politically motivated campaigns against foreign firms as well as terrorism are likely to pose problems to investors. However, given the lucrativeness of the construction industry in Russia, it is possible for Natural Power Consultants to overcome such difficulties. It has been proposed that a cautious approach has to be taken upon entry into this market. The company must have something to offer and the impact of corruption should not be ignored.
This section of the study seeks to critically analyse information about Russia, its construction industry as well as various cultural issues that often shape the operations of organisations in this country. Thus, according to Datamonitor (2011b), the construction and engineering industry in the Russian Federation shrank by about 20 percent in 2009. Although most of the construction within the energy sector emphasises oil and gas pipelines, Russia has on-going wind farm projects. These include the ones within the 50 – 150 MW rated capacity range (European Bank, 2011). Recently, Russia announced a plan for investment of about US$200 million for what is yet to become the largest wind farm project in the country. This includes the 50 MW city of Yeisk wind farm located on the coast of the Sea of Azov (RIA Novosti, 2010). Based on a construction cost figure of US$200 million / 50 MW capacities for a wind farm in Russia, the following relatively large projects ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction Project Management Essay Example | Topics and Well Written Essays - 6000 words”, n.d.)
Construction Project Management Essay Example | Topics and Well Written Essays - 6000 words. Retrieved from https://studentshare.org/miscellaneous/1589855-construction-project-management
(Construction Project Management Essay Example | Topics and Well Written Essays - 6000 Words)
Construction Project Management Essay Example | Topics and Well Written Essays - 6000 Words. https://studentshare.org/miscellaneous/1589855-construction-project-management.
“Construction Project Management Essay Example | Topics and Well Written Essays - 6000 Words”, n.d. https://studentshare.org/miscellaneous/1589855-construction-project-management.
  • Cited: 0 times
Comments (1)
Click to create a comment or rate a document
vh
vhyatt added comment 1 year ago
Student rated this paper as
This essay saved me today. I liked the structure. It was very useful for my miscellaneous course.

CHECK THESE SAMPLES OF Construction Project Management

Managing Construction Project Management

...Managing Construction - 2021 Construction Project - Number and Number Number of Words: 3,050 Introduction As a result of global warming, different countries all over the world are starting to experience extreme changes in the future weather forecast. Since countries all over the world are expected to experience the adverse socio-economic consequences of hurricanes, sparkling wildfires, droughts, floods, and heat waves (Environmental Defense Fund, 2011), this study will assume the lead construction manager who is directly in-charge of building construction projects in the territory of North Yorkshire in United Kingdom will be held liable for project delays caused by changes in weather forecast by 2021. It is clearly stated... to labour...
12 Pages(3000 words)Essay

Culture, Behaviour and Management in field of Construction Project Management

...? Culture, Behaviour and ManagementProject management in the British construction industry and the credit crisis – mind-sets and ideologies Abstract The use of mind-sets and ideologies is a common practice in regard to various social, political and economic plans. The potential use of these frameworks in the construction industry has not been adequately examined. In this paper, the ideologies available to the managers of construction projects for facing various cultural and behavioural challenges developed in the construction industry are critically reviewed. The potential effectiveness of these ideologies is tested through the London Olympics 2012 construction projects. It is proved that such ideologies can be effective... for handling...
12 Pages(3000 words)Essay

Construction Project Management

...? International projects. An analysis of about six construction projects which take place in two countries. Research International projects. An analysis of about six construction projects which take place in two countries. Synopsis Even though principles of project management are the same in all nations throughout the world, certain aspects, which may be specific to the nations, may affect projects in different nations differently. Other than the typical constrains of project management such as time, cost and scope, certain aspects such as national...
6 Pages(1500 words)Essay

Techniques available for Resource allocation and aggregation in Construction Project Management

...Techniques available for Resource allocation and aggregation in Construction Project Management This paper gives an overall view of decision making, the importance of Resource management in the process of decision making and discusses a few techniques available for resource allocation and aggregation in construction Project Management. The techniques discussed are Network Critical Path Analysis, Bar Charts, S - Curves) Introduction Resource allocation is one of the most important aspects of Construction Management. Resources are the true sources of the cost of the project. The management responsibilities lies with the proper utilization of available resources and at the same time to ensure that project delay does not occur due... to...
8 Pages(2000 words)Essay

Construction Project Management

...Construction - Project Management ment of the Problem I have just been asked by the Commercial Department of the Contractor for whom I work toexamine contract No 205 (for the construction of offices and yards for Russ Ting metal Stockholders plc) and report on its financial status. Writing a report for my employers setting out the factors that need to be taken into account in determining its current financial/commercial status - The report includes a table setting out how the determination of different factors will affect the financial status of the project. Stating clearly the additional information I still require. Executive Summary - The report presented here gives a detailed analysis of the examination of a contract... that the...
7 Pages(1750 words)Assignment

Marketing Plan for AUP Coffee

9 Pages(2250 words)Case Study

Construction Project Management

...from the same script. This facilitates commonality in performing safety techniques. The other is clear separation of duties or even space among the different contractors. This will ensure that workers of one company specialize in what they are doing without undue influence from others. There is need to have common points of reporting emergencies so as to promote orderly rescue or corrective measures. This goes a long way in minimizing casualties or fatalities. Contractors need to come up with collective minimum safety requirements at the site for there to be uniform standards. This goes helps in promoting high safety standards and monitoring. There should be a plan to minimize material and equipment congestion. According to Rojas...
1 Pages(250 words)Essay

Masters Level - Project Management in Construction

...Construction Project Management Process and Project Systems Contents 0 List of Figures iii 2.0 Chapter Introduction 1 3.0 Chapter 2: Task 1 2 3.1 Design Selection 2 3.2 Project Planning 3 4.0 Chapter 3: Task 2 - Risk Analysis 8 5.0 Chapter 4: Task 3 – Integrated Teamwork 11 6.0 Chapter 5: Conclusion and Recommendations 13 6.1 Chapter 6: References 15 1.0 List of Figures Figure 1 - Design selection UML process 6 Figure 2 - Project planning UML process 7 2.0 Chapter 1: Introduction Throughout history the English Channel served as a...
10 Pages(2500 words)Essay

Construction Project Management

...CONSTRUCTION OF 18 TIMBER HOUSES IN MANCHESTER PART A Stages of construction Stage A: Appraisal and feasibility In this stage, theproject manager and the client will determine the requirements and objectives of the project. These requirements and objectives will help in providing a clear project design that has to be agreed between the stakeholders and the project team. The requirements at this stage include the client, risk management, feasibility documents of the project, appointment of the project manager, making an estimate of costs and approval of capital funding....
10 Pages(2500 words)Essay

Supply chain management plan in construction project

...By The of the The of the School The and where it is located The Supplychain management plan in construction project Aim and strategy This supply chain management (SCM) plan aims at centrally controlling and also linking the production, ferrying or shipment of construction materials, excellent information movement, and least financial costs from one point to another and finally to the site of construction a multi-storey car park on the existing green field site in the north-west side of Bradford. The strategy lies in proper linking of the all stakeholders in material movement process ensuring that there is no break at any point of...
6 Pages(1500 words)Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Essay on topic Construction Project Management for FREE!

Contact Us