Then next phase we have Planning in which we have three sub tasks survey, design and analysis. First step in this phase in which: We have to determine the…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.6% of users find it useful
Phase 1 Discussion Board Schedule and Cost Control Techniques
Read Text Preview

Extract of sample "Phase 1 Discussion Board Schedule and Cost Control Techniques"

Running head: DISCUSSION BOARD SCHEDULE AND COST CONTROL TECHNIQUES Discussion Board: Schedule and Cost Control Techniques Affiliation October 2008Discussion Board Schedule and Cost Control TechniquesAs a project manager I have the responsibility to design the Process for implementation, implementing a schedule, and estimating expected costs of the Email System Upgrade for my organization.1In this project we will follow these phases: Initiating phase in which we determine the feasibility, project charter.

Then next phase we have Planning in which we have three sub tasks survey, design and analysis. First step in this phase in which: We have to determine the schedule of the project. This project is an up gradation project and this reflects that the overall cost of this project will be lesser then the new implementation of such project. For scheduling this project first sub task we have to cover is survey of overall previous system, and determining which areas require more attention. After this survey we have to analyze the gathered data from the survey.

This analysis sub phase provides all required information for our project seclude and cost estimation. After this analysis sub phase next comes the design sub phase of the project in which we have to design all events and process that are necessary for the completion of this project. In this phase we also demine expected expenditure, estimate time required, and main events of the up gradation project. Then next phase is Executing Phase. Here we hire a software development team for the implementation of this new upgraded email system, now our project team completes the work related to all aspects of this up-gradation.

Here an impotent phase is controlling phase that will run in a parallel way with all other phases. In this phase we control the time, cost, manpower required, resources needed and all things that are associated with is project. We analyze all the ways like project is running on time, is any module required additional time, then managing time in such a way that additional time is not required. Cost and expenditure monitoring is done in such a way that no extra resources will be needed along the way.

Then the last and final phase would be Closing Phase: here we have to ensure that the project work is complete successfully, we have to confirm and verify that the deliverables and then completed out the project finances, panel reports, and lessons learned are all documented and analyzed that all thing are well and new email system is working properly.Cost estimation is one of main and difficult part of any project (Chamoun, 2006). All project depends on this estimation, if this estimation goes wrong then lot of complexities might occur during the project.

So in our Email Up-gradation project we have to estimate the cost in such a way that no complicity can happen, and project can be completed successfully. As a project manger it is my responsibility to Schedule cost control processes. Cost Control is the process of successfully organize transformations to the project financial plan, and then putting together those modifications across the whole project throughout the incorporated Change Control process. Now I will describe few Cost Control Techniques.

As a project manager it my responsibility to discourage unnecessary cost increase, we are going to upgrade the old email system, here we do not need to purchase new system for those 2000 current email users, by modifying a little those system will also become compatible with newly developed system. Here a new idea to cut down purchase for new systems for 2000 current email users is by: developing new email system that is compatible with old system, and can work on those systems without any difficulty.

Another point for cost minimization is: we do not need new IP address; our old IP that can support 2000 current email users will also support 2500 or more users also. Another point for cost control mechanism is: when legitimate financial plan alters are warranted, they should be alter it according to the project’s cost change control system.” Earned value analysis or EVA is a key means utilized to compute project routines. Earned value investigation will be utilized by us that incorporate expenditure, capacity and plan to obtain dimension values that in particular charge project progress to date, also estimated outlook performance.

In this up-gradation we will utilize Planned Value that is also called as Budgeted Cost of Work Scheduled. This will create baseline that point outs the quantity of capital premeditated for expenditure to date, at every exacting point in time (Kwysocki, 1997). So I will use these techniques to control cost process through out the project of up-gradation email system.References1. Chamoun, Y. (2006). Professional Project Management The Guide 1st.Edition, Monterrey, NL MEXICO: McGraw Hill.2. Kwysocki. (1997). Effective Project Management.

McGRAW Hill.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Phase 1 Discussion Board Schedule and Cost Control Techniques Essay”, n.d.)
Phase 1 Discussion Board Schedule and Cost Control Techniques Essay. Retrieved from https://studentshare.org/miscellaneous/1548508-phase-1-discussion-board-schedule-and-cost-control-techniques
(Phase 1 Discussion Board Schedule and Cost Control Techniques Essay)
Phase 1 Discussion Board Schedule and Cost Control Techniques Essay. https://studentshare.org/miscellaneous/1548508-phase-1-discussion-board-schedule-and-cost-control-techniques.
“Phase 1 Discussion Board Schedule and Cost Control Techniques Essay”, n.d. https://studentshare.org/miscellaneous/1548508-phase-1-discussion-board-schedule-and-cost-control-techniques.
  • Cited: 0 times

CHECK THESE SAMPLES OF Phase 1 Discussion Board Schedule and Cost Control Techniques

Project Management in IT Sector

The research analyses the planning and control techniques used by project management teams in enterprise software development.... Project Management allows companies to build plans for software products and to have full control over the team organization of the projects....
41 Pages (10250 words) Essay

Business Project Management

The paper “Business Project Management” aims to point out the relationship between time, cost and quality and the critically evaluate the techniques used to demonstrate the balance of time, cost and quality using critical path method, calculation of the return on investment and quality management.... he study aims to point out the relationship between time, cost and quality and the critically evaluate the techniques used to demonstrate the balance of time, cost and quality using critical path method, calculation of the return on investment and the quality management....
11 Pages (2750 words) Essay

Project Anglia Tower

The report lists the responsibilities of the project manager of Project Anglia Tower; the structure of the organisation; the stakeholders involved; the project life cycle; the possible work scheduling and cost budgeting methods; and quality, risk and communication management plans.... Ensure that work is going on as per project schedule and there is no delay in completion 11.... Anticipate, control and mitigate risks that arise during carrying out the project 10....
13 Pages (3250 words) Assignment

The modern project management approach

Project Management is said to be a set of principles, practices, and techniques used to guide project teams and control project schedule, cost, and performance risks so as to bring about the desired results for the benefit of the customers.... Formal project management techniques were developed in USA in the 1960's as part of the early missile programmes.... These techniques have since been used in almost every area of society, from government agencies to non-profit organisations, and from engineering companies to service industries (Wikipedia)....
19 Pages (4750 words) Essay

Urban Transportation System in India

Project management has been defined as “the application of knowledge skills, tools and techniques to project activities in order to meet or exceed stakeholder needs and expectations from the project” (Duncan, 1996).... Such projects typically have cost and time overruns and are surrounded by litigations and objections from various stakeholders.... These factors in turn are responsible for cost and time overruns....
18 Pages (4500 words) Essay

Major Project Management Techniques

I have got time to construct this… In this report I will demonstrate the implementation of different project management techniques.... The basic aim of this section is to estimate the project cost for the overall project activities.... I have estimated the cost $ 25100.... This house is selling for $230,000 and the land costs $30,000, then the construction cost is around $200,000.... The home is 2,000 square feet, and then the cost per square foot is $100....
10 Pages (2500 words) Essay

The Impact of Changes on Safety and Cost of SABIC

In the paper “The Impact of Changes on Safety and cost of SABIC” the author provides  the quantitative data analysis and the case study parameters, the reasons and impact of work scope changes in  SABIC plant turnaround processes.... hellip; Based on discussion of the results, a set of recommendations have been formulated for  SABIC....
61 Pages (15250 words) Dissertation

New Concept evaluation with planning & execution proposals

In essence, the product As Griffin's model above indicates, the addition of a new product line is the riskiest venture that a company can undertake so careful planning and execution is required to avoid negative cost and schedule variances.... The stage-gate (alternatively phase-gate) technique is utilised in project management when dealing with new product development.... Each phase has its own sets of objectives to achieve.... The zero phase is intended to allow for project management planning through the confluence of different departments that would need to corroborate for product development....
18 Pages (4500 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us