While considering an approach towards a construction project, the size, scale of complexity and the final function of the final built product influence the details of contracting out the work, the estimation, tendering and finally, the methods by which a contractor makes profit.
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER96% of users find it useful
Building Cost Estimation and Calculation of Construction Profit
Read TextPreview

Extract of sample "Building Cost Estimation and Calculation of Construction Profit"

Download file to see previous pages Item rate contracts
Sources of profit specific to item rate contracts:
1. Profit as a percentage of each executed item from tender. Contractors try to reduce low-margin items and increase high-margin items.
2. Profit from sub-contractors.
3. Profit from administrative reimbursable expenses borne by client.
4. Profit from delays caused due to client, or design changes.
Cost plus fee or Cost plus percentage contracts
Sources of profit in cost plus fee contracts:
1. Profit as a percentage of expenditure. Higher the project cost, higher the profit.
2. Profit from efficient material purchase. Material is bought low and contractor's fee is calculated as a percentage of a higher material cost. Profit from material and from administrative charges. Not possible if material bought by client.
Labour contracts
1. Profit from labour.
2. Profit from administration, site office and other reimbursable expenses.
Design-Build Contracts.
Sources of profit in Design-build contracts:
1. Profit on design services.
2. Ability to maximise profit through influencing the design process.
3. Reduction in costs through better coordination and streamlining of execution.
4. Control of costs through easy and efficient tracking of changes and adaptability to change.
PFI (Private Finance Initiative) or BOT (Build Operate Transfer) contracts:
The only way for contractors executing such projects it to maximise revenue by operating the project for a specified period of time that is deemed to be sufficient for the contractor to recoup expenses and a reasonable profit. Such contracts are given for large public projects like roads or power plants.
In conclusion, a contractor has two avenues of maximizing profit from a project; direct and indirect methods. Direct methods are...
Material is bought low and contractor's fee is calculated as a percentage of a higher material cost. Profit from material and from administrative charges. Not possible if material bought by client.
The only way for contractors executing such projects it to maximise revenue by operating the project for a specified period of time that is deemed to be sufficient for the contractor to recoup expenses and a reasonable profit. Such contracts are given for large public projects like roads or power plants.
In conclusion, a contractor has two avenues of maximizing profit from a project; direct and indirect methods. Direct methods are those that are built into the contract, and indirect are those profits that accrue due to an efficient and well managed project team.
...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Building Cost Estimation and Calculation of Construction Profit Essay”, n.d.)
Building Cost Estimation and Calculation of Construction Profit Essay. Retrieved from https://studentshare.org/miscellaneous/1530426-building-cost-estimation-and-calculation-of-construction-profit
(Building Cost Estimation and Calculation of Construction Profit Essay)
Building Cost Estimation and Calculation of Construction Profit Essay. https://studentshare.org/miscellaneous/1530426-building-cost-estimation-and-calculation-of-construction-profit.
“Building Cost Estimation and Calculation of Construction Profit Essay”, n.d. https://studentshare.org/miscellaneous/1530426-building-cost-estimation-and-calculation-of-construction-profit.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document

CHECK THESE SAMPLES OF Building Cost Estimation and Calculation of Construction Profit

Construction Cost Control & Management

...benefited from the use of integrated supply chain. It has enabled them deliver their services effectively due to increased speed and simultaneous handling of related issues. The main contractors can effectively collaborate with sub contractors for smooth running of construction activities. Companies like Laing O’Rourke, Kier, Morgan Sindall and Kier can now monitor construction materials and labor effectively through the use of integrated supply chain (Westbrook J. T. 2002). 4. The optimal time when the excavator needs to be replaced. Year Operating costs (?) Resale value (?) Income generated Gross Profit= income – O.C Net profit Gain from the Excavator...
15 Pages(3750 words)Coursework

Building and construction management

...for a calculated consideration of roofing support features. The shelter provided from eaves will decrease as the height of the structure increases. The Department of Building and Housing advises eaves for most all tiled roofs; including metal tiles, or profiled metal. For masonry tile, Timber fascia eaves can be recommended. (dbh.gov, 2004) Where rain is a consideration, especially if eaves are to be included in the project, sarking would also contribute to the construction. These layers of insulation underlying roof tiles can improve the durability and conditions of a house both in terms of moisture resistance, and reflectivity of sunlight. Sarking often involves layers of aluminum foil...
14 Pages(3500 words)Essay

Cost, Profit and Cost Function

...). There are various methods of calculating cost function, such as engineering, visual fit, regression, and account analysis. The engineering analysis is past experienced based review of cost in a systematic manner. Visual fit as the name suggest is a representation of data in a scatter diagram. Regression analysis includes mathematical formula to ascertain the cost equation that fits the data best. High low method utilizes linear algebra for the determination of fixed and variable costs, but the results are not reliable. Lastly, account analysis deals with analyzing the accounting records and determining the behavioral patterns (Whittington and Delaney...
4 Pages(1000 words)Essay

Company profit calculation

...?Perfect Competition Question One MC = 3 + 6Q + 3Q2 Part (a) At the profit maximisation level, P = MC = $48: 48 = 3 + 6Q + 3Q2 Q2 + 2Q – 15 = 0 The roots of the equation are: Q = 3 and Q = -5 Since Q = -5 is not physically possible, so Q = 3. ? Profit is maximised when output level is 3 units. Part (b) TC = ?MC = ?(3 + 6Q + 3Q2) = 3Q + 3Q2 + Q3 + c At a production level of Q = 0, the cost of capital remains $3: 3 = 3(0) + 3(0)2 + (0)3 + c c = 3 ? TC = 3 + 3Q + 3Q2 + Q3 Part (c) At Q = 3: TC = 3 + 3(3) + 3(3)2 + (3)3 = $66 Part (d) Tr = p (q) at P = $48 and q = 3: = $144 Part (e) Profit = TR – Tc = 144 – 66 = $78 Part (f) atc = tc / q = (3 + 3Q + 3Q2 + Q3) / Q ATC’ = (3Q2...
5 Pages(1250 words)Assignment

Building construction technology

...centres that would soon congest thoroughfares, add to problems in waste disposal, massive consumption, and segregation of residents. Construction problems usually address pollution within and outside the building: generation and circulation of clean air, waste disposal, and maintenance of sewerage systems. Financial issue: During the construction process, budgeting is usually undermined and constraints highly possible due to fluctuating and overhead costs in manpower and materials. Project management and planning problems: All risks were considered and the expertise of the construction company was maximized and practical at this time. 6.0 Recommendations...
8 Pages(2000 words)Essay

Building Construction

...BUILDING CONSTRUCTION RECOMMENDATION Introduction Building construction is the process of adding in a structure within an own real e property. It could be observed that when such process is being taken into consideration, the owner holds the responsibility of creating certain plans that would make the structure he is to establish and the real estate where he would place in the establishment would work well together. Undeniably, this would mean the involvement of different issues and procedures of planning that are supposed to be prepared and completed before, during and after the building of the structure. Close attention is supposed to be given to the...
4 Pages(1000 words)Assignment

Cost Estimation Plan

...and to provide an easy and safe access to the other part of the city. This tunnel is one of the largest tunnels in Australia and therefore, has much importance. The project for construction of the SHT can be considered as one of its own nature as there are certain outcomes observed which have raised questions about the project. One such important issue is the fact that the project Sydney Harbour Tunnel was a PPP in which the private partner bore higher portion of risk as compared to that of public partner, or to be more precise, in this case government of Australia. In the next section of this essay we will focus on the various assumptions made during the cost estimation of the STH...
9 Pages(2250 words)Coursework

Villa Building and Construction

...becomes inevitable. For example, if the project scope is to construct the servant's quarters with a budget of $ 50,000, then the project manager is expected to do that. Just in case, the project manager is asked to change the specifications of the quarters, say, adding another room in the servant's quarters, then the project scope gets changed. The budget is also to be changed correspondingly. Scope of this project is to build a Villa of 6800 sq ft plinth area, on a budgeted cost of $ 3,000,000 to be completed in 17 months. Quality "Quality is fitness for use" - J.M. Juran "Quality is meeting or exceeding customer expectations at a cost that represents a value to...
32 Pages(8000 words)Essay

Cost Estimation Practice in Construction Companies

...Cost Estimation Practice in Construction Companies Introduction: The fundamental importance of cost estimation practice in construction is inevitable if any construction company is to survive. This process of cost estimates preparation and new jobs bidding is often a complex and costly. Over the years, there haven’t been any substitutes to this practice until recently. Building costsestimation therefore is a representation of the state-of-the-art practices, techniques and experiences for expenditure assessment that must be applied irrespective of equipment, labor and materials costs changes. This proposal therefore aims at scrutinizing the major direct and indirect costs components: material-related cost trends, estimating... of...
5 Pages(1250 words)Research Proposal

Building Construction

...History of building construction and changes in the context of fire prevention Introduction Over the years man has been very creative in his pursuit of a comfortable surrounding. One of his major fundamental needs was a shelter which was very sufficient in protecting man from the hostile outside environment. Buildings as one of the magnificent products of mans creativity are under engineering and architecture (Serageldin, 1997). They have a wide range of shapes and functions, and have been modified throughout history for quite a number of factors, from building materials available, to weather conditions, to risk factors, to land prices, specific uses and aesthetic...
5 Pages(1250 words)Research Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Essay on topic Building Cost Estimation and Calculation of Construction Profit for FREE!

Contact Us