StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Building Cost Estimation and Calculation of Construction Profit - Essay Example

Cite this document
Summary
In the essay “Building Cost Estimation and Calculation of Construction Profit” the author considers an approach towards a construction project. The size, scale of complexity and the final function of the final built product influence the details of contracting out the work, tendering and finally, the methods by which a contractor makes a profit…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.3% of users find it useful
Building Cost Estimation and Calculation of Construction Profit
Read Text Preview

Extract of sample "Building Cost Estimation and Calculation of Construction Profit"

Labor contracts1. Profit from labor.2. Profit from the administration, site office, and other reimbursable expenses.Design-Build Contracts. Sources of profit in Design-build contracts:1. Profit on design services.2. Ability to maximize profit by influencing the design process.3. Reduction in costs through better coordination and streamlining of execution.4. Control of costs through easy and efficient tracking of changes and adaptability to change.PFI (Private Finance Initiative) or BOT (Build Operate Transfer) contracts:The only way for contractors executing such projects to maximize revenue by operating the project for a specified period of time that is deemed to be sufficient for the contractor to recoup expenses and a reasonable profit.

Such contracts are given for large public projects like roads or power plants.In conclusion, a contractor has two avenues of maximizing profit from a project; direct and indirect methods. Direct methods are. Material is bought low and contractor's fee is calculated as a percentage of a higher material cost. Profit from material and from administrative charges. Not possible if the material bought by the client. The only way for contractors executing such projects to maximize revenue by operating the project for a specified period of time that is deemed to be sufficient for the contractor to recoup expenses and a reasonable profit.

Such contracts are given for large public projects like roads or power plants. In conclusion, a contractor has two avenues of maximizing profit from a project; direct and indirect methods. Direct methods are those that are built into the contract, and indirect are those profits that accrue due to an efficient and well-managed project team.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Building Cost Estimation and Calculation of Construction Profit Essay, n.d.)
Building Cost Estimation and Calculation of Construction Profit Essay. Retrieved from https://studentshare.org/finance-accounting/1530426-building-cost-estimation-and-calculation-of-construction-profit
(Building Cost Estimation and Calculation of Construction Profit Essay)
Building Cost Estimation and Calculation of Construction Profit Essay. https://studentshare.org/finance-accounting/1530426-building-cost-estimation-and-calculation-of-construction-profit.
“Building Cost Estimation and Calculation of Construction Profit Essay”. https://studentshare.org/finance-accounting/1530426-building-cost-estimation-and-calculation-of-construction-profit.
  • Cited: 0 times

CHECK THESE SAMPLES OF Building Cost Estimation and Calculation of Construction Profit

Material Failures and Embodied Energy

(Lane Thomas, 2010) Therefore apart from the kind of construction, the total life span of the building structure all go into accounting the embodied carbon efficiency of materials.... Material Failures and Embodied Energy (#518537) Introduction Conservation of energy is an important facet of building construction in recent times.... Ways and methods of creating low cost and low energy buildings form an integral part of the new construction process....
10 Pages (2500 words) Assignment

Estimating Purchasing and Cost Control

Cost management is an integral part of financial control and management in any for profit and non-profit organisation.... Cost management is an integral part of financial control and management in any for profit and non-profit organisation, notwithstanding the industry or sector.... he same applies particularly to the engineering and construction sector in which the huge amounts of financial and other resources pumped must be accounted for stakeholders … Unfortunately, for various reasons, many countries' construction sectors lag behind in the use of cost control techniques such as the Cost Value Reconciliation (CVR) and Earned Value (EV), two rather common methods of cost control....
7 Pages (1750 words) Essay

Manufacturing and Non-Manufacturing Overhead

To make profits, firm has to allocate the cost to each and every product effectively.... hellip; The company must know how to control its overhead cost and assign it correctly to every product being manufactured.... Overhead costs can be divided into two types: Manufacturing overhead Non-manufacturing overhead Manufacturing overhead is the indirect factory cost that is incurred when the product is being manufactured.... The cost of direct labor, direct material and manufacturing overhead must allocate to each and every unit produced....
6 Pages (1500 words) Literature review

Effective Management of Suppliers

The tender may also be valued at a lower price than it should leading to the firm offering the job incur losses or make insignificantly small profit.... According to Aibinu and Pasco (2008), causes of inaccurate estimates in the project may occur from two places: prejudice linked with the project itself and prejudice associated with the calculation methods used and the working environment Preparing the cost estimate of the work is one of the most challenging tasks in managing a project because it has to be done before the accomplishment of the project (Oberlender 1993)....
13 Pages (3250 words) Assignment

Project Times and Cost

This is because the inaccuracy involved may result into either a profit or a loss.... For instance, in a project to construct a building, the construction manager would need to make accurate estimates of all the materials required so that cost estimates can be made.... This will enable the manager to make informed decision on how much the cost of completing the construction would be without making any losses.... In fact, poorly managed project shows such symptoms majorly because of inaccuracies that existed during estimation or estimations were totally absent Project managers usually need to make good and informed decisions concerning the amount of the estimates that they require for the specific projects....
5 Pages (1250 words) Assignment

Cost Value Reconciliation and Earned Value

Since the main objective of each company is to obtain maximum profit, methods, and tools need to be implemented to reduce the high levels of uncertainty experienced (Horngren and Foster, 2003).... It involves the comparison of cost with a value per time, the difference being the aggregate profit or loss on the task.... hrough legal requirement guidelines, recommendations, and requirements found in the construction company; hence, promoting easy identification of any loss or potential losses incurred so that the entity does not claim to be more profitable than it is....
14 Pages (3500 words) Coursework

The Viability and Feasibility of the Coronary Investment Company

The difference is over £ 9, 000, 000 meaning the company would be in a position to cater for every operation in the event of construction and the subsequent letting.... It also presents the calculation of the yield value discussing its importance for the development appraisal.... Further, the article also presents the calculation of the yield value besides discussing its importance for the development appraisal of the Coronary Investment....
10 Pages (2500 words) Book Report/Review

Financial Appraisal of New Residential Housing Development

It is typically very time-consuming, complicating, and makes the proposed project very costly if risks are not identified and evaluated in the construction industry.... In fact, the proof indicates the opposite: throughout the last years, construction firms with a higher self-financing ratio developed significantly faster compared to firms with a low self-financing ratio.... This implies that these risks are likely to occur but the cost of mitigating them will be lower than £ 260,000....
19 Pages (4750 words) Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us