StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Project Times and Cost - Assignment Example

Cite this document
Summary
This assignment "Project Times and Cost" discusses the differences between bottom-up and top-bottom estimation techniques. The assignment considers the importance of estimates in effective project management. One would need to consider time and costs in project management…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.4% of users find it useful
Project Times and Cost
Read Text Preview

Extract of sample "Project Times and Cost"

? Project Times and Cost Why accurate estimates are critical in effective project management Project control becomes ineffective without accurate time and cost management. This is because the inaccuracy involved may result into either a profit or a loss. As nobody would like to make losses in any project they are involved in, there is need for control of such inaccuracies so that there would not be any wastage that would result into losses (Medica, 2011). At the same time, inadequacy should be avoided so that the project can run smoothly once it is started without stoppages. One would need to consider time and costs in project management since these are the major inputs that need accuracy. To control any project well, accuracy of estimates in mandatory since good project control entirely depends on the extent to which the estimates are accurate. There is no need for under/overruns in a project. In fact, poorly managed project shows such symptoms majorly because of inaccuracies that existed during estimation or estimations were totally absent Project managers usually need to make good and informed decisions concerning the amount of the estimates that they require for the specific projects. For instance, in a project to construct a building, the construction manager would need to make accurate estimates of all the materials required so that cost estimates can be made. This will enable the manager to make informed decision on how much the cost of completing the construction would be without making any losses. This show how important accurate estimates are in decision making. Another important factor to know in a project is how long the project would take as well as the total cost that the project will need to completion (Michael, 2008). These are questions that can only be responded to well by carrying out accurate estimation of both costs and time. Resources are very scarce, therefore the available ones should be planned well with to meet the intended needs. This can only be achieved in project management by good management of time and financial resources through accurate estimates. To control and manage a project well, one needs to develop cash flow needs. This will enable the project manager to predict the payback period of the project and even make the breakeven analysis. From the payback period, is easy to know whether the project is viable or not. It also becomes easy to know how much funds are required for the project maintenance and to achieve all these correctly, accurate estimate is required. Any good managed project requires a time phased budget. To develop this and establish a baseline for the project, accurate estimates must be done. The time passed budgets include the prices of different materials and how they change with time. Time might cause changes in the prices of materials; therefore, proper estimates need to be done to give accurate allowance for such adjustments when they occur in the future. Errors normally occur to anyone doing anything. The only difference is to what significant is the error to the project. Normally errors occur when estimations are not done correctly or just not done at all. To avoid or reduce errors in a given project, there is need for an accurate estimation to be done. This also helps in reducing under/overruns. The differences between bottom-up and top-bottom estimation techniques One must first appreciate that both bottom-up and top-bottom are project estimation techniques. However, bottom-up technique proves more accurate as compared to the top-bottom technique and this marks the major difference between the two (Mark, 1997). The bottom-up technique, however, takes much time to carry out in as much as it is accurate. The top-bottom technique on the other hand is very fast to execute but less accurate. Bottom up technique is carried out by thoroughly by estimating each and every package of work in a WBS. This technique is normally applied once the management and its client are already committed to the project and require accurate estimates. On the other hand, top-bottom technique of project estimation requires that the project management has to rely on the data from a similar previous project in order to develop estimates for the current project. This normally gives inaccurate estimates since there is a lot of parity in the material specification, cost and variation that may be caused by time difference. Such a technique like the top bottom is normally used in such projects where materials are normally static, or do not change much, such as construction projects. Such projects must also have very few unknowns in the requirements so that they can just be easily predicted in estimation. An example to illustrate this point is that, once we establish that the amount that was used to construct a particular road was $1 million, when we want to construct a similar road as our current project, the cost estimate will be around $1 million. This estimation considers that the materials to be used are similar and the cost is the same in the regions. There will be no extra material added or removed and inflation rate in also taken into consideration. As can be seen, the management only needs to decide they are going to make a similar construction then their estimation work is just to take the cost of the previous project and assume it for the current project. This is why this estimation technique is easy and fast. It therefore fits construction projects as well as small software projects. On the other hand, the manager that uses the bottom up estimation technique will need to do the estimation systematically by considering every material and time requirement for the project to be executed. This process is very long, tedious and time consuming in as much as it is the most accurate and the most preferred. It is therefore ideal for large software projects that require a lot of deliverables. It is also the best when the current costs and time estimation are necessary for a better control of a project. Calculations for the dream house The size of the house = 2,900 sq. feet. The price of the house per sq. feet = $120 Therefore, the total cost of the house = $(120 x 2,900) = $348,000 This is the average price of a lot and a house similar to the one that the family of Mr. Serge would like to acquire. This cost is estimated to be the 100% cost for the house. When the constructors complete the house on behalf of the family, the family will need to part with the following calculations of cash; Excavation and framing complete =24% If 100% rep. $384,000 Then 24% represent $? 24 x384, 000/100 = $92,160 Roof and fireplace complete = 8% 8 x 384,000/100 = $30,720 Wiring roughed in = 3% 3 x384, 000/100= $11,520 Plumbing roughed in = 6% 6 x384, 000/100 = $23,040 Siding on =5% 5 x384, 000/100 = $19,200 Windows, installation, walks, plaster and garage complete = 17% 17 x 384, 000/100 = $65,280 Furnace installed = 9% 9 x 384, 000/100 = $34,560 Plumbing fixtures installed = 4% 4 x 384, 000/100 = $15,360 Exterior paints, light fixtures installed, finished hardware installed = 10% 10 x 384, 000/100 = $38,400 Carpet and trim installed = 6% 6 x 3840 = $23,040 Interior decorating = 4% 4 x 3840 = $15,360 Floors laid and furnished = 4% 4 x 3840 = $15,360 The total cost of building by using constructors therefore would be the sum of all the individual costs. Total cost = (92,160+30720+11520+23040+19200+65280+34560+15360+38400+23040+15360+15360) = $384,000 If the family use their talents to do the plumbing and decorations, the total cost will reduce in this way; The total cost by constructors = $384,000 Plumbing roughed in = $23,040 Plumbing fixtures installed = $15,360 Interior d3ecorating = $15,360 Total cost of work done by family= $(53,760) Total cost when the family do some work= $330,240 Router systems project The estimated costs for, a) Designs = 40% x $600,000 / 100% = $240,000 b) Programming = 20% x $600,000 /100% = $120,000 c) In-house testing = 40% x $600,000/100 = $240,000 References Mark, D. H. (1997). Estimating the Relative Roles of Top-down and bottom-up Forces of Insect Herbivore Population. Aclassic Study Revisited Journal , 94 (17). Medica, J. (2011). Improving the Estimation Process. A Journal of the Project Times . Michael, C. N. (2008). How to Accurately Estimate and Forecast In Project Management. The journal of the TechRepublic . Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project times ans costs Assignment Example | Topics and Well Written Essays - 1250 words”, n.d.)
Project times ans costs Assignment Example | Topics and Well Written Essays - 1250 words. Retrieved from https://studentshare.org/management/1492394-project-times-ans-costs
(Project Times Ans Costs Assignment Example | Topics and Well Written Essays - 1250 Words)
Project Times Ans Costs Assignment Example | Topics and Well Written Essays - 1250 Words. https://studentshare.org/management/1492394-project-times-ans-costs.
“Project Times Ans Costs Assignment Example | Topics and Well Written Essays - 1250 Words”, n.d. https://studentshare.org/management/1492394-project-times-ans-costs.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Times and Cost

Project Management and its usage in cost and time mitigation

Report explores the subject of project management under such divisions: an introduction of project Management and its role in the construction sector; Construction Sector at UAE; SWOT Analysis of the UAE construction sector; Importance of project Management in construction industry etc.... hellip; According to the research findings it can therefore be said that though UAE faced a lot of constraints in its construction industry, still it managed to deliver a progressive path to its construction market with the help of the rising project management technology....
88 Pages (22000 words) Dissertation

The Cost-Time Tradeoffs in Reducing Project Duration

The paper "The cost-Time Tradeoffs in Reducing Project Duration" tells that cost-Time Tradeoffs is a tool used to deal with the limitations of not being able to complete a project as scheduled.... cost-time tradeoffs reduce the original project duration to meet a specific deadline at a reduced cost.... These costs include; cost of equipment, interest on investment, machinery, facilities, personnel, labor, and the cost of time lost when some employees do not come regularly to work (Roy, 2005)....
6 Pages (1500 words) Essay

Project Scope, Time, Cost, and Quality

The measuring tools, standards and methodology are in place and the management has knowledge of the project status at all times.... The project is completed and results are obtained but the success is not repeatable since much is attributed to the skills of the resources involved.... Also often the project exceeds limits of time and budget and critical processes are overlooked to get the work done.... In level two, some project management practices are in place and hence the results are repeatable....
3 Pages (750 words) Essay

Finance Issues of the Company

There are reduced lead times and set-up time increases scheduling flexibility.... This paper "Finance Issues of the Company" discusses the following questions: the types of cost and problems to business when holding: too much inventory and too little inventory, the arguments for and against the implementation of a just in time inventory management in this case and others.... As a result of having wider space, there could be increased overhead to maintain the goods like the cost of electricity, security cost of additional guards who will watch the inventories and other preservative supplies in certain cases....
8 Pages (2000 words) Assignment

'Estimating Project Costs'

Based on the requirements set forth by customer project manager opt for defining WBS(Work Break Down Structure) for the project that constitutes of Cost is also the most important parameter of exclusive concern for higher level management, accountant, customer and other stakeholders of project and cost estimation is also performed during project planning phase.... ppropriate cost estimation is very crucial for the successful development and delivery of project....
4 Pages (1000 words) Assignment

Factors Causing Failures of Construction Project in Terms of Cost and Time Overruns

The factors causing failures of the construction projects in terms of cost- and time- overruns are analyzed this paper.... This requires all parties involved in the project to own the project so that they do not entertain personal interests on the cost of the project.... The author states that construction project goals and missions are negatively affected by the wrong construction management practices prevailing in the project....
10 Pages (2500 words) Term Paper

Planning and Control Practices: Low-Cost Solar Panel Project

"Planning and Control Practices: Low-cost Solar Panel Project" paper proposes measures that can be implemented for timely achieving of engineering projects via iteration protocols.... The report leads to the effective planning of projects, estimation of the minimum time required to complete the project.... nbsp; Engineering organizations (Outsell 2001:303-311) face the challenge of efficient project management practices that are subject to the integrity of project planning and project control procedures....
7 Pages (1750 words) Case Study

Project Management: Cost, Time and Quality

This case study "Project Management: cost, Time and Quality" aims at helping people's body impairment was carried out.... Time is an essential resource in project implementation, it ensures that resources are used in the proposed manner, projects that take long periods of time may not be cost-effective.... project can only be termed to be successful if it achieves its overall objectives and if it cost-effective in most of its operations.... Projects are time-bound, they have a defined time frame within which they should be implemented,  in order to have prior knowledge of when to commence and end the project, calculation of how long each activity takes should be carried out....
10 Pages (2500 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us