The Process of Demolition of Concrete Frame Structure - Article Example

Cite this document
Summary
The strategy and equipment for demolition of concrete structure depend on the size and type of framework and also its foundation. Time is also an important factor as demolition required within a short time frame may have to be undertaken by skilled experts to avoid complications, dissatisfaction, hazards to life and limb, and ensure compliance with federal regulations.
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.5% of users find it useful
The Process of Demolition of Concrete Frame Structure
Read Text Preview

Extract of sample "The Process of Demolition of Concrete Frame Structure"

Download file to see previous pages

There are various ways of carrying out a demolition. Hydraulic excavators, wrecking balls, grapplers, shears, sawing and drilling machines, and crushers are some of the machines and equipments normally used in demolitions. The process varies depending on the scope and nature of work involved. For removal of few slabs and walls, hammers, sawing and drilling machines suffice. For smaller two or three floor constructions, the process of reverse construction demolition may also be feasible if there is sufficient time duration and the process for demolition of the foundation is also manageable with the use of small excavators.

However, for complete buildings and multi-storey structures, it becomes necessary to used heavy excavators, grapplers, shears and wrecking balls. The size and range of the heavy machines vary according to the size of the structure. The actual process begins with removal of recyclable material like electrical wires and fittings, asbestos, etc. The pre-demolition activities may not be all that easy as they appear. Hence, there must be proper assessment done to ascertain the nature of dismantling involved in the preliminary activities besides electrical fittings and water connections.

(Tower Building for Demolition) The pavements around the building structure may need to be broken up. It is necessary to remove the pavement before the actual demolition of the structure so that the ground is smoothened and ready for foundation of the new structure to be laid. Demolition of the concrete frameworkThe job of breaking and crushing the framework follows as the final blow. However, the demolition of walls and columns is not the final task in the demolition process although it is the main job.

After the demolition the broken structure has to be crushed by a special crushing machine. The debris is separated from steel and other recyclable material and shipped out for use in road construction or landfills. The demolition is normally done in three ways; by hydraulic excavators, wrecking balls, or implosion.Hydraulic excavatorsThese are mobile wreckers with long and broad steel 'arms' with which the structure is hit from several directions and angles. The structure crashes under the impact of constant and persistent blows of the excavator.

Hydraulic excavators function like the human arm. The end point of the excavator is versatile and could be fixed with a bucket, scissor, drill or a crusher. (What are Hydraulic Excavators)Wrecking ballsThe wrecking balls are huge steel balls weighing 1000 lbs. and above. With the use of a crane the huge steel balls are swung at the structures resulting in the demolition by the blows of the ball. However, wrecking balls are

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“The Process of Demolition of Concrete Frame Structure Article”, n.d.)
The Process of Demolition of Concrete Frame Structure Article. Retrieved from https://studentshare.org/miscellaneous/1518274-the-process-of-demolition-of-concrete-frame-structure
(The Process of Demolition of Concrete Frame Structure Article)
The Process of Demolition of Concrete Frame Structure Article. https://studentshare.org/miscellaneous/1518274-the-process-of-demolition-of-concrete-frame-structure.
“The Process of Demolition of Concrete Frame Structure Article”, n.d. https://studentshare.org/miscellaneous/1518274-the-process-of-demolition-of-concrete-frame-structure.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Process of Demolition of Concrete Frame Structure

The Process of Managing and Design of Projects in the Construction Industry

Connect the exterior and interior for goods flow in the process.... The paper describes the creation of channels and handrails of stainless.... It provides retention of connectivity of two levels with grouted balustrades of glass allowing ground level viewing.... It uses of 28.... 5mm clear toughened sentry glass for special loading requirements....
10 Pages (2500 words) Essay

Investigating the Collapse of WTC Building 7

In order for the Architects & Engineers for 9/11 Truth to support their claim they used free fall acceleration point to mid-air pulverization of concrete and lateral ejection of steel during the buildings collapse as their main explanation basis.... hellip; They continued further to explain that once the initiation of collapse had been initiated the global collapse of the structure was unavoidable.... In addition, contributed to the increased strain on the core columns, which had already been weakened by the extreme fires, lastly the floors above the collapse zone produced a tremendous energy that eventually led to the global collapse of the structure ( The National Institute of Standards and Technology (NIST))....
3 Pages (750 words) Essay

Construction Technology: Provisions of the Basic Environmental Envelope and the Effects of Weather on Buildings

The author concludes that building format could be a possible way to provide a durable structure that allows changes in the finishes, and in the secondary building elements.... Elements of a passive solar design can be done in the south side of any given building or structure that is super insulated, while the super insulated approach would be a feature of the north side of a passive solar building.... The ground floor of any structure of building normally absorbs moist from the soil or earth material underneath....
16 Pages (4000 words) Term Paper

Design Project in UK

hellip; Though the architectural requirements are taken into consideration, this does not take in the other parameters like the overall appeal and the personal design preferences on the look of the structure from the client.... The paper "Design Project in the UK" tells us about producing an engineering design for a project in Bristol, UK....
8 Pages (2000 words) Assignment

The Advantages of Steel in Building Construction

The basic requirements of this space are that it should be a single storey and 35 m wide span, these attributes make this part of establishment unique and this structure has to be designed accordingly.... This paper "The Advantages of Steel in Building Construction" focuses on the first tread towards the planning of a facility which is to understand the requirements of the building and then enter into the design phase....
12 Pages (3000 words) Assignment

Maltese Islands Demolition and Construction

he engineer must be informed on the type of building structure, sewage, and water lines.... The paper "Maltese Islands demolition and Construction" gives detailed information about the benefits that the Maltese government will achieve out of the demolitions, for instance, the residential houses that will be built after the demolition will attract tourists and other investors.... As a result, the demolition work will be conducted by a foreign contractor that employs adequate capital and also has to solidify its name as a professional....
12 Pages (3000 words) Assignment

The Construction with Reference to Beetham Tower in Manchester

The site ground preparation involved the demolition of the railway viaduct, unsuitable materials were removed and scarification was carried out.... indicates that the Beetham tower has soffit insulation that was retrofitted beneath the concrete slabs.... Beetham Tower has earned different awards that include Project of the Year, and Design and Construction Award in the RICS North West Award (2008), Best tall building by Council of Tall Buildings and Urban Habitats (2007), and Best building by the concrete Society Award (2007)....
10 Pages (2500 words) Literature review

Asta Risk Management

The major tasks of this project will include clearing of the site and the necessary demolitions, external work and sewers, subsidiary structure, super structure, and roads and finishes.... Progress Tracking During the 15th week, the construction work was delayed, which affected the overall time frame of the project.... Second, the contractor for the steelwork encountered severe labour problems, which delayed the steel frame work by two weeks....