The Essential Aspects of Project Management - Assignment Example

Cite this document
Summary
The assignment "The Essential Aspects of Project Management" discovers what should be known about the field…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.6% of users find it useful
The Essential Aspects of Project Management
Read Text Preview

Extract of sample "The Essential Aspects of Project Management"

Project Management Project Management The war that had engulfed Iraq for the last few years resulted in the partial or total destruction of schools, other institutions and amenities. Reconstruction during that time was impossible as a result of insecurity and fear of attacks. After the war had subsided, the government initiated a series of reconstruction and construction work to build new schools and other amenities and repair old ones (SIGIR 2009, p. 19). We won one such tender for the construction of a new school in the Dahuk region. The project’s objective is the construction of a ten-classroom school in the Dahuk area of Iraq. The project has an overall performance period of three hundred days, but the agreement allows for an extension of up to thirty days. The project’s guidelines and objectives are in the contract signed between ourselves, the Iraqi government and the relevant funds donor for this project. The contract outlines the hierarchical system of reporting project progress from the relevant Iraqi Ministry to the donor group. The project contract also allows for continuous monitoring of project progress by the other partners, whenever there is a need. The Chief Engineer of the Dahuk region provided the architectural designs of the project. The scope of work for the project’s classrooms construction begins with clearing and marking the site. The school is to be constructed on an unoccupied lot, donated by the Dahuk Governorate. The area was previously used for agricultural purposes thus will require digging up and removal of plants, excavation of buried non-organic materials, which may have an adverse effect on the building. In addition, there is a need to remove the upper unsuitable soil primarily made of sandy and loamy soils, before lastly; trenching is done to mark the school boundaries. The removal of unsuitable soil followed the compilation of soil tests results, which showed that appropriate soil was at a depth of two meters. Digging was done to the stated point. Moreover, findings from the Global Resources Network (GRN) show that the area’s underground water rose to high heights; it is paramount to construct a filter layer to redirect water flow from the project area. Upon completion of site preparation, construction of classrooms, a supplementary building and a generator housing room begins. Firstly; classroom construction takes center stage as it is the most critical part of the project. Ground slabs, reinforced by steel, are used in floor construction where trenches are dug around the proposed classroom perimeter before cages are laid in for reinforcement. Concrete, which is premixed, is poured into the trenches up to the ground level. Vertical steel bars are used for reinforcement; these bars protrude above the floor slabs. Termite and moisture, protective systems are laid before additional concrete is poured onto the floor. The poured concrete forms one large floor slab, which is strong and resistant to regular wear and tear (Levy 2002, p. 85). Wall construction entails the use of solid masonry techniques whereby construction of walls utilizes concrete blocks and natural stones. Using these materials ensures temperatures inside the classrooms are optimal, considering that the area is a semi-desert and experiences extremely high temperatures. Wall construction is done keeping in mind allowances for fitting of doors, windows and wall ventilators. Being a two storey building, the walls and floors are reinforced using steel bars to prevent caving in due to weight and pressure being exerted on them. Once the ground floor is fully constructed, and the concrete and finishing have been given sufficient time to dry, construction of the first floor ensues. This construction is done similar to that of the ground floor. Construction of the roof takes place as soon as confirmation that verifies that the flooring and walls are capable of holding the extra weight is in place. Choosing and appropriate roof construction style and material are crucial as largely impacts the quality and appearance of the building. In the project, aluminum is used in constructing the roof; aluminum is the best material for this project as it is both durable and cost effective. A slightly inclined roof is the appropriate choice in this case as it allows for easy drainage of rainwater. Upon completion of construction tasks, electricians begin their tasks of electrical circuitry and fitting, other electrical fixtures. Electrical circuitry is done before painting to ensure minimal interference with the paintjob. The project contract allows for ceiling fans as the only allowed electrical fixture. As soon as electrical work is complete, windows are set in their respective frames and painting, both inside and outside, ensues (Levy 2002, p. 96). Construction of an auxiliary building adjacent to the classrooms should commence as soon as the latter construction is done. This reduces on manpower costs, and considering that the project is on schedule, there is no need to hire additional construction workers. However, construction of the auxiliary building and generator housing unit will run concurrently. The auxiliary building will house student and teachers’ lavatories as well as hand washing stations outside the building. Floor, wall and roof construction of the auxiliary building utilizes the same materials and techniques as the main building. The only difference in construction is, however, laying of toilets, sinks and plumbing implements in the flooring slabs before more concrete is poured on top. Plumbing pipes and pumps are set up leading to the rooftop where tanks will eventually be placed. The generator building is a single-roomed building, which is constructed a few meters from the main classroom building to prevent generator noise from reaching the classrooms. Once both buildings are done, we embark on the construction of a play yard and garden area. The play yard and garden area need filling as the top level is too low, it is essential that more top soil is laid on the area before construction of football, basketball and cricket pitches are done. The garden will require lying of rich, loamy soil before the area is fenced off. Furthermore, the project entails the construction of a perimeter wall around the school and fitting of two school gates; one at the front entrance and the other at the back entrance point. According to contract, a two and a half meter long perimeter wall made of concrete blocks with cement finishing should be done. The perimeter wall provides an allowance of up to five meters adjacent to the play yard. This will serve as an entry point for easy delivery of materials to the play yard. Lastly, the project contract calls for the setting up of a septic tank system for the auxiliary building. This entails the connection of underground sanitary sewer lines to the manholes to enable flow of sewage (Salvadori 2000, p. 134). In the course of the project, several constrains limit effectiveness. For instance, the time issue is a significant constraint on the project. This is because the set period of up to three hundred days does not factor in the rainy season, which caused serious setbacks in the completion time. As earlier noted, the area is a semi-desert; mostly dry, but its rainy season is characterized by extremely heavy downpour and strong winds. This affects the project’s success as precipitation deters concrete from becoming consolidated thereby posing a serious setback. The project performance term is also minimal considering that the region’s infrastructure is in a deplorable state so impedes on the transportation of both materials and manpower to the site. We note that, on some occasions, workers from nearby towns are unable to arrive at the site on time after torrential rains leave the dirt roads impassable. In addition, another project constraint is the cost factor. We note that the project is set on a fixed term contract, which stipulates the total project costs shall not exceed $300,000. However, the project manager experience difficulty in managing this amount amidst unexpected rises in costs of materials and labor. Construction material prices are on a constant rise all over the world as the cost of raw materials and fuel escalates. This makes it difficult to determine the actual cost of materials and labor involved in the construction process. In addition, finding qualified construction workers in the area is a grueling task because the war drove off most of manpower in the area. In addition, most of the available workforce in the Dahuk area is unskilled as they have never undergone any construction training. We have; however, managed to train a few able bodied persons to undertake various tasks in the project. Moreover, the area is surrounded by several slum areas, which house many residential properties; safety is, therefore, a key concern. We need constant surveillance to guarantee the security of manpower and materials from armed bandits (SIGIR 2009, p. 31) The chief strategy employed in this classroom construction project is to adhere to the satisfactorily designed projects module constructed by the Dahuk Chief Engineer prior to initiation of construction. The project plan clearly outlines the construction module together with providing detailed depictions of the proposed building when completed. We, however, note that the project faces significant regulatory issue in waste management. The Dahuk area lacks an adequately established sewage collection system as most of the earlier systems were destroyed in the war. In some areas, sewage sips onto the surface and runs off along the earth. The project has made provisions for the collection of wastewater in a septic tank, as outlined earlier. This septic tank connects to the lavatories and hand washing bays through a series of sewage pipes, which channel wastewater into the septic tank. Once the septic tank fills up, it drains by the aid of pumps which pass through a vent placed at the top part of the tank. The project programme should be adhered to ensure timely and effective completion of the project’s scope of work. The proper sequent to be followed begins with site clearing and marking, followed by construction of main and ancillary buildings before the construction of the play yard and atrium. Installation of interior fittings such as lighting and ceiling fans is then followed by the construction of a generator building. Lastly, installation of pumping systems and septic tanks is done before the construction of the school’s perimeter wall, and gates (Salvadori 2000, p. 94) As earlier noted, the area is devoid of purchase points for high quality materials. Prior to the war, Iraq was a leading manufacturer and distributor of cement and other construction materials, but the war resulted in the destruction of these manufacturing plants. The project’s purchasing programme, therefore, entails the importation of construction materials from neighboring nations such as the UAE. The project’s head of procurement is in charge of locating and importing high quality materials. She ensures importation of standard materials, which are allowed by the Iraqi General Technical Specifications guidelines. The head of procurement works hand in hand with the project’s Resident Engineer to ascertain the amount of materials required before importation. The project encompasses a number of highly specialized persons; these include a Project and Contracting Officer,in charge of ensuring that the project abides by the stipulations of the contract terms and conditions. Furthermore, the Resident Engineer is in charge of technical aspects of the projects’ constructions and ensuring they are to the highest standard levels. The Project Quality Assurance Manager ensures that the materials and manpower utilization is at par with the Iraqi standards as well as the donor’s stipulations in the contract. Lastly we have the delivery team, which is in charge of the actual hands-on construction of the project’s proposals and implementation of the specialists’ instructions. The anticipated success outcomes include achievement of a construction that abide by the Iraqi General Technical Specifications as well as obtain the universal UN design for primary schools. Moreover, the key success factor is for the school to accommodate up to five hundred students and forty teachers comfortably (Berkun 2008, p.235). Bibliography Berkun, S. 2008. Making Things Happen: Mastering Project Management (Theory in Practice). New York: OReilly Media. Salvadori, M. 2000. The Art of Construction: Projects and Principles for Beginning Engineers & Architects. 3rd ed. Chicago: Chicago Review Press. Levy, S. D. 2002. Project Management in Construction. 4th ed. London: McGraw-Hill Professional.  Special Inspector General for Iraq Reconstruction (SIGIR). 2009. Hard Lessons: The Iraq Reconstruction Experience. Iraq: US Independent Agencies and Commissions. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(The Essential Aspects of Project Management Assignment, n.d.)
The Essential Aspects of Project Management Assignment. https://studentshare.org/management/1762608-project-managment
(The Essential Aspects of Project Management Assignment)
The Essential Aspects of Project Management Assignment. https://studentshare.org/management/1762608-project-managment.
“The Essential Aspects of Project Management Assignment”. https://studentshare.org/management/1762608-project-managment.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Essential Aspects of Project Management

Features of Project Management

The focus then shift to the aspect of project management.... This is an elaborate process and lead to identification of a number of reasons why most organizations apply the elements of project management in their projects.... project management (Author's Name) (Institutional Affiliation) Abstract In order to increase, diversify, and change production, most businesses carry out projects as means of achieving all or some of these goals.... However, the word ‘Project' has a more real meaning; according to The project management Institutes, a project is defined as, “"a temporary endeavor undertaken to create a unique product, service, or result"....
17 Pages (4250 words) Essay

Project Management Skills - OS Upgrade Project

Tools Analysis Gantt Chart This type of project management tools is regarded as one of the classic instruments.... Conclusion Introduction IT project management is often regarded as the most significant part of proper business management.... The aim of this report is to analyze the project management tools applied for upgrading the OS on the computers within an organization, and define the effectiveness of these tools and management principles....
14 Pages (3500 words) Essay

The Theoretical Concept of Risk Management

In addition, relevant corporate governance aspects of organisations are also included.... The risks can affect different aspects of an organisation or project including physical, monetary, cultural, and social dimensions (Loosemore and Raftery, 2006, p.... The Theoretical Concept of Risk management Name University Course Date The Theoretical Concept of Risk management Introduction Risk management is a discipline that is focused on the determining, planning and implementing of the different was and resolving different risks in organisations and companies....
10 Pages (2500 words) Coursework

Websites Regarding Project Management

Project management techniques are applicable to all types of projects and these techniques or methods not only make it easy for the project managers to control all phases of project management effectively but also these methods are widely Your full full July 02, Project Management Project management is a systematic approach towardsaccomplishment of a specific task, for example, constructing a new building or developing new software.... Project management techniques are applicable to all types of projects and these techniques or methods not only make it easy for the project managers to control all phases of project management effectively but also these methods are widely used to manage various complex processes involved in the development of projects....
2 Pages (500 words) Essay

Quality of Software in Project Management

This paper “Quality of Software in project management” discusses some of the important aspects that are required for managing a project with high quality.... It discusses the importance of quality for the software in project management along with other issues that can influence the quality of software.... Furthermore, project team members and their awareness of high quality management practices, organized software improvement.... hellip; The author states that in order to ensure the superior quality software development; software project managers as well as their development groups collectively perform an important role....
7 Pages (1750 words) Research Paper

Scheduling and Project Management on the Various Departments of Walmart

s application of project management is in relation to its own benchmarking practices that are widely used to define the prospects for a project in the respective department.... In an organizational culture, the consideration that is usually accorded to project management is that in which it is applied to ease the relational considerations among numerous departments of an organization.... As an essential characteristic, project management has often allowed… For example, for an organization to significantly record increases in the volume of incoming projects and meet their intended goals, the Typically, projects are part of organizations and their accomplishments largely depend on the organizational structure, style of management, culture and systems applied towards the same (Vanhoucke, 2012)....
4 Pages (1000 words) Assignment

Successful Implementation of Effective Project Controls Systems

Operations management ensures that proper designing, planning and control of production process is attained so that the business targets are met (Pearce & Robinson, 2011).... This ensures that the most crucial strategy gets a higher Running an advert for a new project is significant before embarking in the real project.... When a small business is planning to establish a new project, it is important for it to analyze literature in the relevant field to avoid making the wrong decision (Stephen, Lakhani, Brown & Malmi, 2008)....
6 Pages (1500 words) Essay

PRINCE 2 and PMBOK Methodology in Project Management

10 Pages (2500 words) Assignment