The author states that among the uncertainties considered in the EAC, the project is all the factors that are not readily quantifiable. This implies that such features lack concrete figurative connotation a feature that makes it impossible to place in the Gantt chart.    …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.8% of users find it useful
Project Planning and Control
Read Text Preview

Extract of sample "Project Planning and Control"

The EAC project is viable and is likely to run into specific risks that are not easy to factor into the project management. The same applies to the possible opportunities the project is likely to meet in its course. As such, the Gantt chart will lack the two figures, which are vital since the project managers must always be on the outlook for either the risks or opportunities since they both influence the success of the project.Risks and opportunities are uncertain factors often considered by project managers but they cannot factor in either in the project (Roeser, 2013).

The uncertainties in the two arise from the magnitude and nature of their effects on the project. As such, project managers can only anticipate risks and handle them based on the prevailing factors. In retrospect, project management requires a degree of versatility in order to enable the project managers to consider the two factors and change the nature of the project based on the influence of either the risks or the opportunities they face at various stages. The Gantt charts alongside show project process.

They illustrate the project schedule as different activities occur at various stages. In doing this, the charts show the relationship between the activities. Key among the activities shown in the chart is project preparation and the WBS activities. Additionally, the charts portray the computation of both the pessimistic and optimistic showing their expected start and end times.  

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Project Planning and Control Assignment Example | Topics and Well Written Essays - 343 words, n.d.)
Project Planning and Control Assignment Example | Topics and Well Written Essays - 343 words. Retrieved from https://studentshare.org/management/1659511-project-planning-control-project-management
(Project Planning and Control Assignment Example | Topics and Well Written Essays - 343 Words)
Project Planning and Control Assignment Example | Topics and Well Written Essays - 343 Words. https://studentshare.org/management/1659511-project-planning-control-project-management.
“Project Planning and Control Assignment Example | Topics and Well Written Essays - 343 Words”, n.d. https://studentshare.org/management/1659511-project-planning-control-project-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Planning and Control

Pre-Contract Cost Planning and Cost Controlling

re-Contract Cost planning and RIBA Plan of Work ... … When undertaking a project such as construction, it is important for individuals involved to keep in mind cost planning as well as cost control.... Cost control is a key objective in any given construction project and should, therefore, be recognized that, it is only achieved through the final decision of the manager (Potts, 2007, p.... On the other hand, Cost control should be provided from start to completion of the project, ensuring that the estimated final cost is always known....
9 Pages (2250 words) Assignment

Building Project: A Case Study in Project Planning and Control

All of these are important components of Project Planning and Control.... hellip; planning and control are two essential management functions that one must be able to master and should appropriately use in task management.... control is necessary in order be able to monitor how well everything is going and also to apply corrective measures if necessary (Carpenter et al.... This activity is a form of control because it sees to it that project be delivered on-time while taking into account the associated cost with significant delays....
8 Pages (2000 words) Essay

Operation Strategy and the Factors Affecting Operation Strategy

Operation strategy is the collection of concrete actions that are choosing keeping in mind the corporate strategy that a firm or an organization is following.... They involve basically the operation aspects of the strategy which are chosen or mandated keeping in mind the overall position the business wants to be in....
9 Pages (2250 words) Essay

Project Management Planning

A Variable Time Project Planning and Control Model.... Rosenwinkel (1995) explains that for every project success, there must be a proper planning and lack of planning may lead to many disasters and failures.... No one had a prior experience and that really gave us a bit of a problem in planning and finishing the project in time.... Rosenwinkel (1995)… Free-wheeler's believe that project planning is insignificant is very wrong since there is less tolerance for misjudgements required in Project Management Project plan is very important for all projects since it minimizes waste of time....
2 Pages (500 words) Essay

The History of Sprint Nextel Corporation

he proposed project will focus on the improvement of the company.... In the first segment; secondary research, the project will be mainly secondary research which will make use of secondary sources of information like books, journals, magazines, newspapers and online sources....
6 Pages (1500 words) Essay

Pre-Contract Cost Planning and Cost Controlling

Project Planning and Control is a process followed for the realization of the project's objectives.... hellip; Since time immemorial, project management has been recognized as a crucial methodology for the organization, planning, coordination, monitoring, and control of project implementation in many parts of the world.... "Pre-Contract Cost planning and Cost Controlling" paper states that cost control should be provided from start to completion of the project, ensuring that the estimated final cost is always known....
9 Pages (2250 words) Coursework

Planning and Control Practices: Low-Cost Solar Panel Project

bjectives of studies on Project Planning and Control practices ... ignificance of studies on Project Planning and Control practices  ... "planning and control Practices: Low-Cost Solar Panel Project" paper proposes measures that can be implemented for timely achieving of engineering projects via iteration protocols.... nbsp; Engineering organizations (Outsell 2001:303-311) face the challenge of efficient project management practices that are subject to the integrity of project planning and project control procedures....
7 Pages (1750 words) Case Study

Wembley Stadium: Project Management Principles, Establishment and Measurement of Success and Failure

Some of the activities that can be accomplished by a project manager include setting monitoring and control deliverables that include time management, cost management, quality management, risk management, and acceptance management.... These numerous monitoring and control factors are aimed to ensure value for money is achieved.... hase 2: Planning – the second stage is planning and it involves creating a set of documents that guides the project team towards fulfilling the requirements of the project....
7 Pages (1750 words) Assignment