StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Economics and management Quantity Surveying - Essay Example

Cite this document
Summary
It is noticed that it is the most important contributor of the economy in United States (US). In 2001, Bureau of the Department of Commerce in United States declared…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92% of users find it useful
Economics and management Quantity Surveying
Read Text Preview

Extract of sample "Economics and management Quantity Surveying"

Download file to see previous pages

onstruction industry worldwide employs huge numbers of workers as this industry is labour driven; if there is lack of labour the construction industry encounters huge challenge. The attrition in this industry is higher compared to others as wage becomes the problem (Wong, 2003). The labours do not get the motivation to work in this sector as they cannot find ways to improve their standard of living by employing their skills. Construction companies concentrate on planning, leading, organizing and controlling the operation in order to excel in the present competitive world.

Managers focus on these aspects before executing the project. There have been a number of researches pertaining to construction industry, which have highlighted the fact unambiguously that the project managers are the most important success factor of the projects. Herbert et al. (1970 cited in Goetsch and Davis, 2006) has identified that little attention has been given to the leadership issue that arises in the construction industry on a regular basis. In spite of this situation, there are several researches pertaining to this issue and the authors have provided their views accordingly.

Although the researches failed to address the main issues in the industry instead, they highlighted the general problems that are encountered by all the industries worldwide. The reason behind the inefficiency to provide the exact reason pertaining to effectiveness of leadership in construction industry is the lack of understanding. Therefore, the present essay lays emphasis on the importance of leadership in the construction industry (Hotho and Dowling, 2010). Leadership is defined as the behaviour of an individual by virtue of which one aims at directing or controlling a group of team members.

It is a reciprocal process that encourages individuals to concentrate on values, political and economic resources so as to achieve an ascertained goal. The leaders should posses the ability to direct their subordinates

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Economics and management Quantity Surveying Essay”, n.d.)
Economics and management Quantity Surveying Essay. Retrieved from https://studentshare.org/management/1654122-economics-and-management-quantity-surveying
(Economics and Management Quantity Surveying Essay)
Economics and Management Quantity Surveying Essay. https://studentshare.org/management/1654122-economics-and-management-quantity-surveying.
“Economics and Management Quantity Surveying Essay”, n.d. https://studentshare.org/management/1654122-economics-and-management-quantity-surveying.
  • Cited: 0 times

CHECK THESE SAMPLES OF Economics and management Quantity Surveying

Managing Growth In a Professional Firm: Falkner Wilks

This essay is based on the detailed analysis of the Falkner Wilks, which is an organization established by two chartered surveyors Clifford Falkner and Collin Wilks 12 years back for quantity surveying that had successfully grown to mid sized modern company.... Under the able leadership of Falkner and Wilks Company had grown to mid sized and well respected for quantity surveying practice.... Falkner expanded its services range apart from quality surveying to project Management, design management, building surveying and maintenance and interior design etc....
10 Pages (2500 words) Essay

A Profession in Search of an Identity

This has increasingly affected the quantity surveying profession.... Inevitably, continuing industry change and technological developments will present the… It was not until the 17th century restoration of London after the Great Fire that quantity Surveyors developed as an occupation but it is believed that the ancient Egyptians used a system of quantity Surveyors are employed predominantly on major building and construction projects as consultants to the owner, in both the public and private sectors....
10 Pages (2500 words) Essay

A Profession Undergoing Rebirth -Transformations in the Quantity Surveyor's Role

This has affected the quantity surveying profession.... Technological improvements and persistent industry change will present the quantity surveying profession with many challenges, threats, as well as opportunities.... The quantity surveying surfaced in England as early as the eighteenth century.... From the discussion in the essay "A Profession Undergoing Rebirth - Transformations in the quantity Surveyor's Role," it may be concluded that quantity surveyors today must realize that their success depends not only on their abilities to control cost and improve efficiencies....
10 Pages (2500 words) Essay

Quantity Surveying Practice: Civils

The "quantity surveying Practice: Civils" paper states that investigations will be undertaken at the site to determine the engineering features of the ground on which the foundation of the structure will be laid and offer details on bearing capacity.... The training in production work procedures, secure systems, and management systems guarantee that works are finished safely.... ll operations are under the management of (INSERT NAME) located at (INSERT ADDRESS)....
8 Pages (2000 words) Assignment

Quantity Surveying Practice

"quantity surveying Practice" paper states that the production process in construction involves a variety of players among them the engineers, contractors, quantity surveyors, workers, and financial analysts.... When tenders have been accepted, the quantity surveyor provides data on the cash flows and when the project is completed, he prepares a statement of final account so as to summarize cost charges incurred.... His advice on cost management is an essential part....
10 Pages (2500 words) Assignment

Role of Client Quantity Surveyor

nbsp;quantity surveying requires a combination of financial, legal and technical knowledge.... This case study "Role of Client quantity Surveyor" discusses and compares the roles played by both Client quantity Surveyor and Contractor's quantity surveyor in detail and assesses the future developments within them.... hellip; Modern quantity surveyors play an integral role in managing construction projects.... Both Client quantity and Contractor's quantity surveyor have similar knowledge and experience, but their roles differ depending on the one who has employed them....
7 Pages (1750 words) Case Study

Floodwalls, Construction Materials and Land Surveying

This literature review "Floodwalls, Construction Materials and Land surveying" discusses the tachometer as a rapid system of the survey in which measurements of both horizontal distance and vertical elevation of a point along with the distance without using any leveling instrument.... The EDM used in this way is used in contour surveying....
21 Pages (5250 words) Literature review

Assessing Spatial Data Infrastructures Using Management Model

Management Model evaluation framework can be seen as a management model that links the managerial, operational, policy, and external aspects of land use and management.... This literature review "Assessing Spatial Data Infrastructures Using management Model" presents various spatial data infrastructure performance.... This paper will use the management Model evaluation framework to evaluate and compare land administration systems between Australia and Switzerland....
8 Pages (2000 words) Literature review
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us