StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Post Project Implementation Audit; Office Move Scenario - Coursework Example

Cite this document
Summary
The office move scenario provides a lesson learning activity to be used in the future project of similar nature. The audit serves to evaluate the project goals and achievement. This is measured against the initial project plan, the budget estimates, time schedules, the conformance of deliverables to specifications and customer satisfaction…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.1% of users find it useful
Post Project Implementation Audit; Office Move Scenario
Read Text Preview

Extract of sample "Post Project Implementation Audit; Office Move Scenario"

Download file to see previous pages

h office furniture and personal belongings was by using the Monster Movers at $ 18,500 when added to the electrical installation costs of $ 12,000 makes $ 30,500. The lower costs were to use Willies Workers while the lowest was to use the services of staff workers and the members of the choral group with obvious incentives. Assuming the project manager was rational, the method that would minimize costs was chosen, the Willies workers. The costs were literally reduced owing to an incentive by the corporate manager of a bonus of half the amount of everything saved within a budget of $30,000.

The costs optimization was possible by using Calvin’ s Cartage. The ability of the mover to meet risk insurance part was catered for by their insurance cover while saving on costs by quoting $9,950 (Project smart, 2010). The new office space comfortably accommodates 32 employees bigger than the previous that only settled in 24 employees. The office space also guarantees future expansion. Moving warehouse, stockroom and file archives first followed by desks, office equipments the following week made sure no employee or processes were disrupted.

For electrical installations, an experienced electrician, whose record is known by the company, was hired. This contractor was identified and tendered because of trusted competence in handling lighting, power, wiring and cabling needs. Besides, the contractor had crew members available any time of the week. Weekdays allowed for critical layout of office design, changes were also made to electrical power service to cater for new Local Area Network, computer systems and desktop work stations. Satisfactory placement of lighting to meet new lighting arrangement was done.

Office cubicles were retained as the previous one which brought a same. The client was contented with the ability of the project manager to engage and actively involve employees in the relocation exercise. The employee work time was not interrupted hence productivity within this period was not compromised. Employees showed support to any course that would improve and sustain company’s objectives. Their acceptance for relocation meant their desire to meet employer’s objectives and goals. Owing to the fact that all the furniture and equipment transfer was done within a given time and cost frame, the client would certainly approve of the method or process used.

The aspect of employee participation in the exercise motivates and inculcates sense of ownership of the relocation exercise. It was not forced down their throats. Time management: Reasonable time for the project allowed successful delivery of office equipment to the new building.

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Post Project Implementation Audit; Office Move Scenario Coursework”, n.d.)
Post Project Implementation Audit; Office Move Scenario Coursework. Retrieved from https://studentshare.org/information-technology/1447246-onduct-a-post-implementation-audit
(Post Project Implementation Audit; Office Move Scenario Coursework)
Post Project Implementation Audit; Office Move Scenario Coursework. https://studentshare.org/information-technology/1447246-onduct-a-post-implementation-audit.
“Post Project Implementation Audit; Office Move Scenario Coursework”, n.d. https://studentshare.org/information-technology/1447246-onduct-a-post-implementation-audit.
  • Cited: 0 times

CHECK THESE SAMPLES OF Post Project Implementation Audit; Office Move Scenario

Transparency in the Cost of Justice

The data involved comprises four types of costs in respect of four case studies for data acquired from 28 European countries.... EU seeks to establish a… n area of Justice” to facilitate the access of individuals as well as business to justice by reducing hindrances that discourage or prevent them from using their privileges....
10 Pages (2500 words) Statistics Project

Project Paper Part C

The linear relationship between the credit balance and customer's size of household is established at 0.... 5.... While a perfect positive linear relationship is… at +1, a coefficient variance of 0.... 5 indicates that there is a positive and strong linear-relationship between the credit balance and size of the holding. A coefficient of determination (r2) normally explains the portion of fluctuation (variance) of a particular variable Similar to the coefficient of variation, the coefficient of determination normally ranges between +1 and -1....
9 Pages (2250 words) Statistics Project

Accounting Policies and Procedures Followed by J Sainsbury Plc and Tesco Plc

After this the role of the audit committee in monitoring internal controls and practices has been discussed.... Finally the internal auditor's opinion and Statement on Corporate Governance with respect to internal audit and internal control has been briefly discussed....
8 Pages (2000 words) Statistics Project

The Marketing Communication Mix and a Significant Influence Towards Its Audience

This report aims at analyzing the context of marketing communication applied to consumer and the wider aspect of the business, mainly relating to the charity or funded organizations for similar purposes as to study how the marketing communication process differs amongst the two.... hellip; According to the father of marketing, Kotler, marketing is a phenomenon that has risen from a point where it was considered to be an added cost to the organization to the point where it is now assumed the driving force for the organizational revenues; the respect for marketing activities and marketers is present across the globe....
9 Pages (2250 words) Statistics Project

Assessing the Effectiveness of Violence Counseling Programs

The objective of the project "Assessing the Effectiveness of Domestic Violence Counseling Programs" is to solve three statistical tasks that feature testing of a given hypothesis and analysis of intermediate results.... The presented tasks share the topic of physical force incidences....
5 Pages (1250 words) Statistics Project

Post-Traumatic Growth Inventory

The following paper under the title 'post-Traumatic Growth Inventory' gives detailed information about the data file named “911 and depression” The dataset is a part of the study conducted after the 9/11 event on a number of variables related to post-traumatic stress disorder.... These surveys were on demographic information, post-traumatic growth inventory, Center for Epidemiologic Studies Depression Scale, post-traumatic Stress Disorder Checklist-Terror- Part 1, and post-Traumatic Stress Disorder Checklist-Terror....
5 Pages (1250 words) Statistics Project

Analytical Techniques in Public Administration

This project applies sensitivity analysis as the major technique for decision making.... et present values of the project are taken as the difference between the benefits (B) and the costs (C).... In option A, the Net present value is obtained as follows:NPV (A) = B - CNPV (A) = $186,800,000 - $500,571,150 NPV (A) = -$313771150 By applying a discount of 30%, the NPV of option A is obtained as follows:NPV (A) = -$313771150 – (30/100) * -$313,771,150 NPV (A) -$407,902,495The Net Present Value of Option B is calculated as:NPV (B) = B – CNPV (B) = $433,272,000 - $240,000,000NPV (B) = $193272000Applying a discount of 30%, the NPV of project B reduces as follows:NPV (B) =$193,272,000 – 10/ 100 * $193,272,000NPV (B) = $135,290,400In the two prior estimates, Analysis of option A by the Baltimore Chamber of Business shows higher NPV for option B than option A, whether discounting is applied or not....
6 Pages (1500 words) Statistics Project

Google vs Lycos - Search Engine Analysis and Comparison

Alternative search terms given; Information retrieval systems ppt 2, 350,000 results, Information retrieval systems definition 45,400,000 results, Information retrieval systems theory and implementation 7, 710, 0000 results, Information retrieval systems notes 6, 270,000 results.... Alternative search terms given; Information storage and retrieval systems19, 400, 000 results, Information retrieval systems theory and implementation 53,500,000 results, Definition of Information retrieval systems 482,000,000 results, Evaluation of Information retrieval systems 209,000,000 results....
5 Pages (1250 words) Statistics Project
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us