StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Materials Resource Planning Systems and the Just-in-Time Philosophy - Essay Example

Cite this document
Summary
This essay "Materials Resource Planning Systems and the Just-in-Time Philosophy" tackles the two types of systems commonly used today – the JIT and the MRP. Supply chain management is the optimal management of an entire network of business processes involving the provision of products and services…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.9% of users find it useful
Materials Resource Planning Systems and the Just-in-Time Philosophy

Extract of sample "Materials Resource Planning Systems and the Just-in-Time Philosophy"

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“SCM Essay Example | Topics and Well Written Essays - 750 words”, n.d.)
Retrieved de https://studentshare.org/environmental-studies/1427963-scm
(SCM Essay Example | Topics and Well Written Essays - 750 Words)
https://studentshare.org/environmental-studies/1427963-scm.
“SCM Essay Example | Topics and Well Written Essays - 750 Words”, n.d. https://studentshare.org/environmental-studies/1427963-scm.
  • Cited: 0 times

CHECK THESE SAMPLES OF Materials Resource Planning Systems and the Just-in-Time Philosophy

World-Class Manufacturing Issues

Its main features is the utilization of a total quality management (TQM) approach, highly flexible and motivated workforce, Just-in-Time (JIT) manufacturing philosophy, and the pursuit of satisfying customers at a global level.... IT is a manufacturing philosophy which aims to... While there is no exact definition of World Class Manufacturing (WCM), companies that aspire to that description would be expected to have most of the following features: total quality management (TQM); a flexible and highly motivated workforce; just-in-time (JIT) system; and aim to satisfy customers at a global level. ...
9 Pages (2250 words) Essay

The Planning and Control Processes and Supply Chains of Toyota

The author investigates the planning and control processes and evaluates the Supply chains including MRP and JIT systems in relation to Toyota.... The complications allied with manufacturing systems value chains have not been resolved yet.... The importance of planning and control of the supply chain cannot be denied.... The links and processes cover all the activities from the purchasing raw materials to the delivery of the final product....
8 Pages (2000 words) Term Paper

Premier Auto - Material Requirement Planning

The paper "Premier Auto - Material Requirement planning" highlights that the objective of the management will be well served by adopting and implementing Lean Management as discussed above.... There is either a shortage or excess of raw materials at Production Assembly Line as the company works on basis of Material Requirement planning (MRP) and is dependant on supplier offering delivery dates 3.... This shows complete ignorance of how to use data and information for production planning....
9 Pages (2250 words) Essay

Supply Chain Management

The paper "Supply Chain Management" highlights that the collaboration of the organisation within and beyond its own organisational boundaries is key in synchronising the activities of these different elements to work sinuously toward a common goal – value added for the company's products.... ...
11 Pages (2750 words) Coursework

Corus Group: Business Process and Operations

The The organisation implemented a philosophy and culture which they called The Corus Way in order to sustain competitiveness, productivity and profitability.... Along with this philosophy is the practice of continuous improvement programmes across the company.... Effective operations management includes principles of quality, lean production, just-in-time, continuous improvement and so on. ... Using quality tools and techniques, this paper arrives at a proposal for using an online computer based material resource programme as well as four recommendations for the improvement of the depot operations in accordance to the Corus Way....
11 Pages (2750 words) Essay

Just in Time Applications in Construction Projects

A good practice that has been developed that focuses on organizing and managing the materials procurement process is just-in-time (JIT) system.... anaging materials procurement is a vital process that has direct influence on a project's cost.... "A study shows the cost of materials and equipment constitutes approximately 60% of the projects cost" (Akintoye, 1995: 105; Marsh, 1985).... Therefore, controlling materials procurement activities starting from the supplier warehouse through the delivery process until storage on construction sites is essential....
15 Pages (3750 words) Essay

The Principle of Total Quality Management

Most of these functions are focused on planning such sales an operations planning, business planning, master scheduling, production planning, capacity requirement planning and material requirements planning....
9 Pages (2250 words) Assignment

Description of Just in Time Manufacturing

Material Requirements Planning (MRP) and Just-in-Time (JIT) systems, as well as more recent Enterprise resource planning (ERP) systems, are similar on various grounds.... "Description of Just in Time Manufacturing" paper presents a general description of JIT and compares it to MRP/ERP systems while also highlighting its major strengths and weaknesses.... The study then presents a discussion on how the two systems can be intergraded for more effective results....
10 Pages (2500 words) Term Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us