A On Health And Safety Management About A Construction Company In South Wales In The UK - Case Study Example

Cite this document
Summary
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.8% of users find it useful

Extract of sample "A On Health And Safety Management About A Construction Company In South Wales In The UK"

Download file to see previous pages
    • ISO 45001 Requirements
    • Action Plans to Attaining the Certification
    • The Responsible Person(s)
    • Timeline/Timw framework
    • 4. Context of the organization 4.1 Understanding the organization and its context
    • Determination of both internal and external issues relevant to organizational OHSMS
    • Managing Director
    • Three weeks
    • 4.2 Understanding the needs and expectations of interested parties
    • Determination of interested parties, their needs, and expectations with regard to OHSMS
    • OHSMS Health Committee
    • Three weeks
    • 4.3 Determining the scope of the OH&S management system
    • Defining the boundaries and applicability of the OHSMS
    • Management Team
    • Two weeks
    • 4.4 OH&S management system
    • Establishment, implementation, and continuously improving the OHSMS
    • Organization OHS officer
    • Two weeks
  • 5 Leadership
  • 5.1 Leadership and commitment
    • Demonstration of leadership and commitment when undertaking OHSMS responsibilities; adequate resources; and active participation of concerned parties
    • Managing Director
    • One week
    • 5.2 OH&S Policy
    • Establishing effective OHSMS policy through consultation, commitment, and legal requirements
    • OHS Practitioner
    • Three weeks
    • 5.3 Organizational roles, responsibilities, accountabilities and authorities
    • Top management takes full responsibility for OHSMS, allocation of adequate resources, responsibilities, and accountabilities
    • Top management
    • Two months
    • 5.4 Participation and consultation
    • Establish methods of internal and external communication and ensure effective participation of the concerned parties including the workers, provision of mechanisms, time, and resources
    • Management Team
    • Three weeks
    • 6 Planning 6.1 Actions to address risks and opportunities
    • Reduction of the undesired results and continuous improvement of the OHSMS
    • Management Team
    • Two weeks
    • 6.1.2 Hazard identification and assessment of OH&S risks 6.1.2.1 Hazard Identification
    • Establish, implement, and maintain effective procedures for identifying, assessing, and controlling the risks
    • OHS Practitioner
    • One month
    • 6.1.2.2 Assessment of OH&S risks and other risks to the OH&S management system
    • Proper implementation and maintenance of OHSMS risk assessment method
    • Organizational OHS practitioner
    • One month
    • 6.1.3 Determination of applicable legal requirements and other requirements
    • Establish, implement, and maintain procedures of identifying and accessing OHSMS requirements
    • Management Team
    • One month
    • 6.2 OH&S objectives and planning to achieve them 6.2.1 OH&S objectives
    • Ensure establishment, implementation, and documentation of measurable objectives consistent with OHS
    • Top management
    • One month
    • 7 Support 7.1 Resources
    • Determination and provision of resources required to effectively implement the OHSMS
    • Managing Director
    • Two resources
    • 7.2 Competence
    • Delegate responsibilities to competent person based on education, training, and experience
    • Managing Director
    • One week
    • 7.3 Awareness
    • Person(s) undertaking the OHSMS activities need to be aware of the OHS policy, importance of effective OHSMS, implications of compliance
    • Management team
    • One week
    • 7.4 Information, communication, participation and consultation
    • Establish methods of internal and external communication and ensure effective participation of the concerned parties including the workers
    • Management Team
    • Two weeks
    • 7.5 Documented information
    • Documentation of all factors influencing the effectiveness of OHSMS e.g. policy, scope, standards
    • Management Team
    • One month
    • 8 Operations 8.1 Operational planning and control
    • Effectively planning, implementing, and controlling processes required to meet OHSMS objectives
    • Organizational OHS practitioner
    • Two weeks
    • 8.1.2 Hierarchy of control
    • Establish risk reduction mechanisms based on elimination, substation, and engineering controls hierarchy
    • Management team
    • Two weeks
    • 8.6 Emergency preparedness and response
    • Establishment of procedures that identify and respond to potential emergency situations
    • Management Team
    • One month
    • 9 Performance evaluation Monitoring, measurement, analysis and evaluation
    • Establishing and implementing procedures of monitoring the performance of OHSMS on frequent basis
    • Managing Director
    • One month
    • Internal audit 9.2.1 Internal audit objectives
    • Conducting internal audits at intervals to ascertain compliance
    • Management team
    • Three weeks
    • 9.3 Management review
    • Frequently reviewing the OHSMS of the organization to ascertain its effectiveness
    • Top Management
    • One month
    • 10 Improvement 10.1 Incident, nonconformity and corrective action
    • Development of measures to ensure timely response to incidents or dealing with consequences should they occur
    • Organizational OHS practitioner
    • Three weeks
    • 10.2 Continual improvement
    • Ensuring continuous improvement of the OHSMS’s stability, adequacy, and effectiveness
    • Organizational OHS practitioner
    • Two weeks
...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(A Case Study On Health And Safety Management About A Construction, n.d.)
A Case Study On Health And Safety Management About A Construction. https://studentshare.org/engineering-and-construction/2054661-a-case-study-on-health-and-safety-management-about-a-construction-company-in-south-wales-in-the-uk
(A Case Study On Health And Safety Management About A Construction)
A Case Study On Health And Safety Management About A Construction. https://studentshare.org/engineering-and-construction/2054661-a-case-study-on-health-and-safety-management-about-a-construction-company-in-south-wales-in-the-uk.
“A Case Study On Health And Safety Management About A Construction”. https://studentshare.org/engineering-and-construction/2054661-a-case-study-on-health-and-safety-management-about-a-construction-company-in-south-wales-in-the-uk.
  • Cited: 0 times

CHECK THESE SAMPLES OF A Case Study On Health And Safety Management About A Construction Company In South Wales In The UK

Large UK Health and Beauty Retailing Company

The paper "Large UK health and Beauty Retailing Company" discusses that the deposited sum should inflate and equal foreign liability.... hellip; Option hedges allow a company to take one-sided bets on currency movements.... In the case of option hedges a company pays a part now — a premium price, and a part later at a strike price, if a strike price is higher than the future spot price.... It is important to notice that while the group turnover is increasing (more goods are sold), the net profit is decreasing (non-operating costs are rising), and the profitability of the company is falling....
8 Pages (2000 words) Case Study

Construction Management Portfolio

arson and Toubro is one of the most respected companies in the south Asian region having expertise in the domains of technology, engineering, construction and manufacturing (Larson and Toubro, n.... The report present here consists of detailed explanation on key management portfolios that are necessary in a large sized construction management operations.... Thus this report would help to get comprehensive information on the different managerial operations that are very vital to any construction management operation....
17 Pages (4250 words) Case Study

Changes in Toyota's Reporting Practices

The paper "Changes in Toyota's Reporting Practices" shows what changes Japan's largest carmaker will undertake in case of various scenarios in developing business, how the company creates an environment that induces its stakeholders to contribute and participate in the well-being of the company.... Toyota management was managing the company's inventory, costs, and capacity very successfully and was applying for cost reduction programs very well....
13 Pages (3250 words) Case Study

Admin Law and Compulsory Purchase: Construction of Nuclear Power Station

As such, the construction of the nuclear power station on the banks of the Six Estuary must satisfy the provisions of Kyoto Protocol.... The Department of Energy and Climate Change have contacted EDG Energy to construct a nuclear power station on the banks of the Six Estuary.... The site is currently farmland, in mixed ownership....
13 Pages (3250 words) Case Study

Impact of Nestls Approach to CSR on Their Business

The achievements of the company in diverse field are indicative of the company's commitment towards its stakeholders and for global causes.... he uk government describes the term as "the responsibility of an organisation for the impacts of its decisions on society and the environment above and beyond its legal obligations, through transparent and ethical behaviour" (gov.... Nestle is a 140 year old global leader in the FMCG sector with a rich tradition of contributing to the community and a high level of awareness and activities entered on philanthropy, environmental sustainability and promotion of healthy living among its consumers as well as the… The company has diligently strived toward the well being of its stakeholders as well as the general community, and managed to balance it with increased profitability, year after year....
15 Pages (3750 words) Case Study

Project Management for Construction

The report presented here gives a detailed analysis of the examination of a contract on construction offices and yards with regard to a company named Russ Ting Metal Stockholders plc.... The report is based on the financial requirements specified by the Commercial Department of the Contractor and evaluates the financial status of the company considering the different factors that tend to determine the financial status of the project.... These factors would relate to profits of the project, company mission and objectives, the financial issues in the company, the contractual obligations, commercial aspects and marketing procedures, and also the raw materials used by the contractor....
7 Pages (1750 words) Case Study

Offsite Manufacturing and the Underlying Process

Selecting a construction method for a building project will need maximum decision strategy that entails careful comprehension, evaluation, and measurement of various decision factors, which can have the most impact on the efficiency and success of the decisive action undertaken.... Off-site construction takes place in a manufacturing plant definitely designed for this kind of process.... hellip; The paper will further look at the cores of offsite manufacturing as a process in the construction industry, which will allow for a better understanding of this concept as applied in the building industry....
21 Pages (5250 words) Case Study

Engineering and Construction Health and Safety Management

This work "Engineering and Construction health and safety management" describes a case study that evaluates the health and safety measures (H& S) of UK based company in the construction industry.... Balfour Beatty is one of the leading construction companies in the uk.... Its customers are mainly based in the uk, US, South Africa, Australia, Canada, and the Middle East.... in the uk, there is a noteworthy number of people who have lost their lives from accidents and incidents involving construction works....