StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Nobody downloaded yet

Parameters in Estimation of the Design of Floods and Catchment Response - Term Paper Example

Cite this document
Summary
The paper "Parameters in Estimation of the Design of Floods and Catchment Response" evaluates different methods of estimating the response time of catchment in the estimation of peak discharge. In this case, three methods were considered; the time of concentration, the time to peak, and the lag time. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.7% of users find it useful

Extract of sample "Parameters in Estimation of the Design of Floods and Catchment Response"

Download file to see previous pages

Floods are extreme events in the hydrologic cycle. Therefore, its magnitude is inversely proportional to its occurrence frequency. For the design of any hydraulic structure such as dams, it is important to determine the estimate of the design flood events. This is because the flood events represent the maximum discharge of a given area during a specified period. The hydraulic structures need to meet their intended purpose; this can be enhanced by determining the estimated design flood accordingly.

Before surface runoff is experienced in any catchment, the rate of infiltration must be less than the rate of precipitation, in that regard, the response and the characteristic of the catchment play a major role in determining the runoff. If the catchment has soils of low infiltration rates then that means that the runoff to be experienced in such a region is more and occurs after a very short time as compared to a catchment characterized by soils of high infiltration rates. In addition, the vegetation influences the rate of water infiltration in that, a catchment with more vegetation, the infiltration rate is higher than a place with low vegetation growth.

It is also important to note that, the distribution and the duration of the rainfall on the catchment will also influence the runoff in that if the distribution is even throughout the catchment and takes a considerably longer time then the runoff experienced would be very high and vice versa (Royappen, M., et al. 2002). Considering the duration of the rainfall in determining the surface runoff, a hyetograph or a hydrograph is used. The time that a catchment takes to respond to rainfall is related to a number of factors such as; the catchment characteristics including the land cover, soils and obstruction, the river channel, and other subsidiary channels’ geomorphology, catchment geomorphology, and climate of the catchment(Ramser 1927). 

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Parameters in Estimation of the Design of Floods and Catchment Term Paper, n.d.)
Parameters in Estimation of the Design of Floods and Catchment Term Paper. https://studentshare.org/engineering-and-construction/2053980-civil-engineering-project-report
(Parameters in Estimation of the Design of Floods and Catchment Term Paper)
Parameters in Estimation of the Design of Floods and Catchment Term Paper. https://studentshare.org/engineering-and-construction/2053980-civil-engineering-project-report.
“Parameters in Estimation of the Design of Floods and Catchment Term Paper”. https://studentshare.org/engineering-and-construction/2053980-civil-engineering-project-report.
  • Cited: 0 times

CHECK THESE SAMPLES OF Parameters in Estimation of the Design of Floods and Catchment Response

Roof Rainwater Harvesting

In the case of roof top unit, the catchment is referred to the roof top available for harvesting the rain water.... Thus the conveyance systems consists of series of gutters and down pipes that are necessary to direct the water from the roof top catchment to the desired location of storage....
7 Pages (1750 words) Essay

An Analysis Between Two Catchments

hellip; The first catchment is Thrushel at Tinhay found in west Cornwall.... In operation since 1969, shales and sandstones of Carboniferous Culm Measures predominate the catchment and are affected by the Roadford Reservoir (mainly for storage, hydro-electric power, and pumped water transfers).... 7m total length with a catchment area totaling 112.... With sandstone and shale, it was a natural catchment until the Roadford Reservoir began to fill and affected flow post in 1988....
5 Pages (1250 words) Assignment

Storm Drainage Design Project: Scientific Methods

This information is then used in the design of flood control facilities.... Flow, being a unit of volume over time or velocity and area, implies that the parameters of area and velocity contribute to how the hydrograph is presented.... The writer of this assignment seeks to comparatively analyze the potential solutions to designing a storm drainage system for flooding situations....
5 Pages (1250 words) Assignment

Storm Drainage Design Project

The rivers with short basin lag are more prone to floods as the respond very quickly to rainfall and hence the discharge in the river increases tremendously sooner the catchment receives a rainfall.... The two major component of the runoff from the catchment that contributes to the volume of water in the river are the surface flow, which includes all the flows through the surface of the river and sub surface flow component which incorporates all the ground water flow discharges into the river after the onset of a storm....
6 Pages (1500 words) Essay

Storm Drainage Design

A clear 'V' shaped catchment with a sharp gradient gives flash floods and a steeper the rising limb of the graph.... The paper "Storm Drainage Design" presents that hydrology and hydraulic modeling systems are extensively used by infrastructure engineers and crisis management departments for estimation of availability of water, design of dams, diversions, and flood control through reservoirs or channels, etc.... The paper also discusses different design considerations for such a pipeline or channel....
6 Pages (1500 words) Coursework

Storm Drainage Design Project

The study "Storm Drainage design Project" presents a thorough hydrological and technical analysis of the Cynon River in Wales aiming at building the storm drainage mechanism.... nbsp;River Cynon in South Wales is located along with coordinates 51° 38' 00” N, 3° 29' 00” W....
7 Pages (1750 words) Case Study

Total Load Exerted by the Bell Tower

Introduction to Engineering design.... One of the most accurate estimation methods that can be used involves calculating the height using the formula: Height of the tower= Number of stories x Average floor to… Generally this method of height estimation is based on the assumption that the floor to floor height of building such as the church is 3.... One of the most accurate estimation methods that can be used involves calculating the height using the formula: Height of the tower= Number of stories x Average floor to floor height....
1 Pages (250 words) Essay

Reverend Thomas Bayes Theorem

In the Bayesian theorem, the conditional probability occur on the bases of unconditional probabilities that are derived using a multiplication rules, that is (Prior x Likelihood) that are further divided by the sum of the possible parameters.... The theorem provides understanding about the how the probability of a theorem is affected by a new set of evidence....
15 Pages (3750 words) Essay
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us