StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis - Research Paper Example

Cite this document
Summary
This paper "Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis" describes that when selecting which option is best, there is a need to analyze the financial benefits. This decision will chart the future of the returns and the best analytic tools that should be used…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.7% of users find it useful

Extract of sample "Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis"

Students Name Tutors Name Topic Date Inspection of crude oil unit decisions, cost estimation, and risk analysis Assumption table   failure of pipeline [Unit] release of flammable fluid new part $ 300,000 cost of repair $ 400,000 cost of contractor $ 80,000 Frequency years 2 number of days down days 35 number of days down days 8 failure of every 5 month months 5 loss of profit per day due poor quality $ 4,000,000 loss of profit per day $ 4,000,000 Corrosion of Boilers Failure to control mixing of chemicals new part $ 500,000 cost of repair $ 30,000 cost of contractor $ 75,000 once year years 1 number of days down days 40 number of days down days 2 failure of every 2 years years 2 loss of profit per day due poor quality $ 500,000 loss of profit per day $ 4,000,000 Releasing high-temperature Corrosion of Cooling towers new part $ 100,000 new part $ 250,000 cost of contractor $ 20,000 cost of contractor $ 70,000 number of days down days 2 number of days down days 10 failure of every 2 years years 2 failure of every 2 years years 2 loss of profit per day $ 4,000,000 loss of profit per day $ 4,000,000 Electrical failure Corrosion of other equipment materials $ 2,000 new part $ 250,000 cost of contractor $ 10,000 cost of contractor $ 70,000 number of days down days 5 number of days down days 10 failure of every 2 years years 2 failure of every 2 years years 2 loss of profit per day $ 4,000,000 loss of profit per day $ 4,000,000 Costs associated with Inspection loss of profit per day $ 4,000,000 Longer annual shutdown for maintenance days 5 equipment replaced 800,000 engineers no. Cost per hour number of hours Activity H 2 1000 1 2000 Activity I 2 1000 3 6000 Activity J 1 1000 6 6000 Activity K 3 1000 5 15000 Activity L 2 1000 5 10000 Activity M 1 1000 5 5000 Activity N 3 1000 3 9000 Activity O 2 1000 8 16000 69000 Assistant engineers Activity J 2 600 6 7200 Activity M 3 600 5 9000 Activity N 3 600 3 5400 21600 Interest rate 10% 2. Individual costs of each failure a). failure of pipeline every 5 months new part 300,000 cost of contractor 80,000 loss of profit $ 140,000,000 140,380,000   b). Failure to control mixing of chemicals every years cost of repair $ 30,000 loss of profit per day due poor quality $ 1,000,000 1,030,000 c) Releasing high-temperature every 2 years new part $ 100,000 cost of contractor $ 20,000 loss of profit per day $ 8,000,000 8,120,000 d) Release of flammable fluid cost of repair $ 400,000 loss of profit per day due poor quality $ 32,000,000 32,400,000 e). Corrosion of Boilers new part $ 500,000 cost of contractor $ 75,000 loss of profit per day $ 160,000,000 160,575,000 f) Corrosion of Cooling towers new part $ 250,000 cost of contractor $ 70,000 loss of profit per day $ 40,000,000 40,320,000 g). Corrosion of other equipment $ new part $ 250,000 cost of contractor $ 70,000 loss of profit per day $ 40,000,000 40,320,000 h). Electrical failure materials $ 20,000 cost of contractor $ 10,000 loss of profit per day $ 20,000,000 20,030,000 3. Summaries of costs above This costs are summarized as well their present values are calculated in the table. 0.41667 0.833 1 1.25 1.667 2 2.083 2.5 2.9167 3 $(000) $(000) $(000) $(000) $(000) $(000) $(000) Failure of pipeline 140,380 140,380 140,380 140,380 140,380 140,380 140,380 Failure to control mixing of chemicals 1030 1,030 Releasing high-temperature 8,120 release of flammable fluid 32,400 Corrosion of Boilers 160,575 Corrosion of Cooling towers 40,320 Corrosion of other equipment 40,320 Electrical failure 20,030 total cost 140,380 140,380 1,030 140,380 140,380 302,795 140,380 140,380 140,380 - Present Value factors at 10% 0.9611 0.9236 0.9091 0.8877 0.853124 0.8264 0.8199 0.7880 0.7573 0.751315 present values 134,915 129,662 936 124,613 119,762 250,244 115,099 110,617 106,311 - Net present value 1,092,158 The present value of failure when inspection is not done $ 1,092,158 of represents loss they will incur. The length of years used to calculate the present value however can affect the PV that is why it is also of critical importance to determine the correct length of years to use in the analysis and our case is 3 years. Option of inspection 0.5 1 2 2.5 3 $(000) $(000) $(000) $(000) $(000) Loss of revenue $ 20,000 $ 20,000 $20,000 $ 20,000 $20,000 materials of maintenance $ 800 $ 800 $ 800 $ 800 $ 800 Engineers $ 69 $ 69 $ 69 $ 69 $ 69 assistant engineers $ 21,600 $ 21,600 $ 21,600 $ 21,600 $ 21,600           20,890,600 20,891 20,891 20,891 20,891 10.0% 0.9535 0.9091 0.8668 0.7880 0.7513 19,918 18,991 18,108 16,461 15,695 Present value 89,174 The present value of inspection is $89,174,000. This is lower than the cost incurred when inspection is not done. Case scenario- boiler does spoil within two years 0.41667 0.833 1 1.25 1.667 2 2.083 2.5 2.9167 3 $(000) $(000) $(000) $(000) $(000) $(000) $(000) Failure of pipeline 140,380 140,380 140,380 140,380 140,380 140,380 140,380 Failure to control mixing of chemicals 1030 1,030 Releasing high-temperature 8,120 release of flammable fluid 32,400 Corrosion of Cooling towers 40,320 Corrosion of other equipment 40,320 Electrical failure 20,030 total cost 140,380 140,380 1,030 140,380 140,380 142,220 140,380 140,380 140,380 - Present Value factors at 10% 0.9611 0.9236 0.9091 0.8877 0.853124 0.8264 0.8199 0.7880 0.7573 0.751315 present values 134,915 129,662 936 124,613 119,762 117,537 115,099 110,617 106,311 - Net present value 959,451 The figures used above do not include the boiler values in computation to determine the case scenario. Obviously, the situation remains the same, as the expected PV is already higher than the PV of inspecting. Case scenario- boiler does spoil within two years 0.41667 0.833 1 1.25 1.667 2 2.083 2.5 2.9167 3 $(000) $(000) $(000) $(000) $(000) $(000) $(000) Failure of pipeline 140,380 140,380 140,380 140,380 140,380 140,380 140,380 Failure to control mixing of chemicals 1030 1,030 Releasing high-temperature 8,120 release of flammable fluid 32,400 Corrosion of other equipment 40,320 Electrical failure 20,030 total cost 140,380 140,380 1,030 140,380 140,380 101,900 140,380 140,380 140,380 - Present Value factors at 10% 0.9611 0.9236 0.9091 0.8877 0.853124 0.8264 0.8199 0.7880 0.7573 0.751315 present values 134,915 129,662 936 124,613 119,762 84,217 115,099 110,617 106,311 - Net present value 926,129 Case scenario- first failure then inspection 0.41667 $(000) Failure of pipeline 140,380 Failure to control mixing of chemicals Releasing high-temperature release of flammable fluid Corrosion of Cooling towers Corrosion of other equipment Electrical failure total cost 140,380 Present Value factors at 10% 0.9611 present values 134,915 Net present value 134,915 Since inspection will start during repair of the failed equipment. It will have a figure of $89,174. Comparison of costs of failure and inspection From the graph above it can be noted inspection is necessary as the cost and opportunity associated with inspection is lower as compared to the cost od failure of pipe, boiler and flammable gas. Recommendation regarding the proposed inspection The company should inspect regularly. The numbers does not tell the whole story because the computations will not be able to determine the future events well beyond the 2 years used in computing the NPV. There is big damage even in this situation and the management has everything to win if they are blessed with a more favorable situation. Do we out outsource inspection services or hire our staff Now that the decision is to inspect regularly which is cheaper option – outsourcing or hire staff? In the case of outsourcing, the total cost in outsourcing should be lower than the cost of making the doing it internally. The decision about whether to hire staff or outsource inspection services will depend on the costs and other factors. However, in this scenario the decision is whether to buy using quantitative analysis. The following is the quantitative analysis of the scenario Relevant Items TOTAL Relevant items Hire outsource Engineers 69000 Assistant Engineers 21600 Overhead 800000 700000 Cost of outsourcing 75000 Total costs 896,000 775,000 The decision here is that the inspection services should be outsourced as opposed to hiring staff because the total cost of outsourcing amounts to 775,000 is opposed to 896,000 for the hiring. Apart from the quantitative analysis above that should be considered by the company, qualitative factors needs to be taken into consideration. Some of the qualitative factors that should be considered include the quality of the inspection done supplied by the outsourced company. Reliability of the supply as well as supply schedule should also be taken into consideration. The company should also consider the possibility of the company creating a competitor who will produce the product at competitive prices and take it to the market. The company should consider the fact that they are likely to reduce producing costs by becoming innovative a fact that they cannot have when outsourcing. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis Research Paper Example | Topics and Well Written Essays - 2500 words, n.d.)
Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis Research Paper Example | Topics and Well Written Essays - 2500 words. https://studentshare.org/engineering-and-construction/2052543-crude-oil-unit
(Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis Research Paper Example | Topics and Well Written Essays - 2500 Words)
Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis Research Paper Example | Topics and Well Written Essays - 2500 Words. https://studentshare.org/engineering-and-construction/2052543-crude-oil-unit.
“Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis Research Paper Example | Topics and Well Written Essays - 2500 Words”. https://studentshare.org/engineering-and-construction/2052543-crude-oil-unit.
  • Cited: 0 times

CHECK THESE SAMPLES OF Inspection of Crude Oil Unit Decisions, Cost Estimation, and Risk Analysis

How much volatility is the Saudi Arabian petrochemical industry exposed to

The nation's huge oil reserves have assisted it in getting developed as one of the largest producers and exporters of petroleum and petrochemical goods.... This high degree of dependence of Saudi Arabia upon its oil reserves bore fruit to the nation during the Arab-Israeli war of 1973 which increased oil prices to a peak thus facilitating the process in which Saudi Arabia became one of the fastest growing economies in the world (U.... Such instances had been common for Saudi Arabia as it had been for other oil producing nations in the world....
84 Pages (21000 words) Dissertation

Logistics and Transportation as a Category within a Category

The analysis of various category performances is carried out in the third step and set targets and objectives in the next step.... This essay discusses that Category Management is a retailing and supply management process of managing categories as SBU (strategic business unit) produces better business results, with emphasis on delivering consumer value....
26 Pages (6500 words) Essay

Why are gas prices inflated

In the 90's the West Texas Intermediate (WTI) crude oil was priced at 20 dollars a barrel.... In the 90's the West Texas Intermediate (WTI) crude oil was priced at 20 dollars a barrel.... (Michael Cohen, 2006) Thereafter the Organization of Petroleum Exporting Countries (OPEC) managed to restrict the production levels so as to recover the crude oil prices.... US required less quarter of oil to generate a unit of output while the oil intensity of Canada fluctuated between high and low....
27 Pages (6750 words) Essay

Volatility is the Saudi Arabian petrochemical industry

hellip; The author aims at examining the degree of volatility in the average market returns of the petrochemical industry through an estimation of the Security Market Line equation.... However, Saudi Arabia is immensely dependent upon revenues from oil for its income which helps the country to stick to its strategic plans.... Given the fluctuating nature of the same, it is essential to attach some certainty in the revenue figures in order to initiate a long term plan such as expansion of oil production capacity....
84 Pages (21000 words) Dissertation

Importance of Gold as an Asset Class

However, with the separation of the dollar from the price of gold, no one can exchange a dollar directly for gold.... However, gold reserves remain… Gold is still perceived as a safe haven for nervous investors and also a valued hedging asset that adds stability to investment portfolios. ...
28 Pages (7000 words) Essay

Surfactant Polymer Flooding for Enhanced Oil Recovery

This work "Surfactant Polymer Flooding for Enhanced oil Recovery" focuses on a sandstone core sample with measured porosity and permeability is implemented underwater flooding process.... From this work, it is clear that the flooding process is important in order to promote enhanced oil recovery.... hellip; Surfactant-polymer (SP) flooding is a tertiary recovery technique and quite common nowadays in Enhanced oil recovery .... The oil that is used is from the North Sea and its properties such as density and viscosity are calculated....
50 Pages (12500 words) Research Proposal

Mechanical Engineering at Kuwait National Petroleum Company

… IntroductionSince its establishment in October 1990, the Kuwait National Petroleum Company has served as a hub of engineering activities associated with the mining, processing and exportation of oil and gas.... As a result, KNPC boasts of its vast IntroductionSince its establishment in October 1990, the Kuwait National Petroleum Company has served as a hub of engineering activities associated with the mining, processing and exportation of oil and gas....
12 Pages (3000 words) Assignment

HVAC Systems Proactive Maintenance

The paper "HVAC Systems Proactive Maintenance" focuses on the critical analysis of the main peculiarities of proactive and preventive maintenance of HVAC systems.... They conversely represent over 50% risk due to retained energy efficiency and star rating energy (Levitt, 2005).... anaged HVAC environment is, thus, responsible for low operational cost and increased staff productivity.... Various HVAC practices can result in satisfactory differences when it comes to maintenance cost and the predicted HVAC life....
13 Pages (3250 words) Research Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us