Managing projects in engineering and construction - Lab Report Example

Cite this document
Summary
Considering ethical and safety requirements during experiments is crucial. An author of this paper performed a triaxial experiment on a sample of soil. This empirical analysis is aiming at allowing students demonstrate their learning outcomes in planning so far. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.6% of users find it useful
Managing projects in engineering and construction
Read Text Preview

Extract of sample "Managing projects in engineering and construction"

 Managing projects in engineering and construction Project Autonomy and Organisation ` Engineers perform triaxial experiments to determine soil properties exhibited in particular soil samples. The universally tested soil abilities include shear properties, hydraulic conductivity and soil effectiveness (Soyoye and Ademosun, 2014 p.2). Considering ethical and safety requirements during experiments is crucial not only for personal safety but also for environmental protection and the safety of others. As a requirement before graduating from the engineering school, I performed a triaxial experiment on a sample of soil. This empirical analysis is aiming at allowing students demonstrate their learning outcomes in planning so far. First, before commencing my project, I developed a time schedule to guide me during the project. The activities listed in my time schedule included organizing for meetings with my supervisors and lecturers for training and orientation before commencing the experiment. Besides, I came up with a separate project plan outlining the specific phases and procedures of the actual experiment. In addition, I made a visit to the school laboratory to book a date on which to perform the triaxial tests. An early reservation ensures that all the necessary pieces of equipment for the experiment are available on the experiment day. A tamping rod, a measuring scale, a measuring cup, de-aired water, a spatula and, pair of scissor is the equipment required in the experiment. Additionally, I acquired a small notebook on which I recorded my meetings with the lecturer and supervisors. I also ensured that the supervisors and laboratory technicians signed the notebook. Signed notebooks serve as evidence for the attended meetings and the booked experiment date. Project planning In an attempt to account for the resources I used during the research, I prepared a budget and a time plan for the activities. Budgets and time plans ensure effective and efficient use of resources. Besides, time plans and budgets act as monitoring and evaluation tools, helping me identify failures and making necessary adjustments to the project In any experimental project, there are potential challenges likely to occur. In my case, I planned for some difficulties liable to affect my experiment. For instance, I was ready to experience limited availability of lecturers and supervisors. Lectures and supervisors are busy people attending to quite a big number of students hence making it difficult to access them every time you want their help. The situation could derail my project resulting to postponement my project to a later date when my supervisors were available. Additionally, inadequacy and unavailability of types of equipment in the school laboratory provide a potential risk. Apparatus used in the experiment are quite expensive and complicated (Soyoye and Ademosun, 2014 p.5). In this situation, procrastination of the project to another date is inevitable. Another potential risk is disparities in the results due to the natural discontinuity existing in the specimens. However, the risk causes an inconsequential discrepancy in the results. The project safety plan adopted for this experiment included ensuring personal safety by putting on protective clothing during the experiment. Besides, safety to others is guaranteed by following the right procedures for the test. This prevents experiments from backfiring posing a threat to others. The primary ethical consideration in the experiment was to ensure proper use of the apparatus and equipment. As earlier mentioned, the apparatus for the experiment are quite expensive. Hence, any damages could cost the school a lot. In addition, the level of accuracy of the experiment may remain affected due to calibration, operator, and output errors. To ensure accuracy, and reliability of results, proper handling of the apparatus was attainable. Stakeholder requirements The main stakeholders in the experiment included the laboratory technician and my academic supervisor. The university supervisor’s requirements were a performance of experiments with minimal errors in the results. Additionally, the supervisor required that the projects should clearly define the elasticity modules in the provided soil samples. Other expected deliverables from the experiment include the shear test, soil pressure, and the type of soil used (Soyoye and Ademosun, 2014 p.4). On the other hand, the laboratory technician expected proper care to the apparatus during the experiment. Fines were applicable on any damages to the laboratory equipment. Most of the stakeholder requirements for this experiment were met. For instance, the accuracy of the results was achievable through the following ways. First, before commencing the experiment, I ensured that all the equipment were cleaned and sterilized to get rid of errors due to contamination of the specimen. Besides, the experiment was performed under the right temperatures to minimize output errors that affect the accuracy of results, hence meeting my supervisor’s requirements. However, I happened to break accidentally the measuring cylinder I was provided with. The laboratory technician helped me get another one so that I could complete my experiment in time. I also agreed to buy a new measuring cylinder to replace the damaged one according to the school laboratory rules Professional conduct To maintain respect and professionalism with my stakeholders, I ensured that I met with them in person. I highly avoided phone conversations with my supervisor because phone conversations do not provide any evidence that I consulted them. Additionally, I ensured that at the end of every meeting, they signed my logbook to serve as prove of consulting them. Besides, when presenting my ideas to the supervisor, I maintained a high degree of confidentiality. I provided evidence to any of my claims of which the supervisor was in disagreement with. Besides, when facing any challenges or in situations of the uncertainty of the procedures, I consulted my supervisor immediately. My relations with the laboratory technician were right. For instance, after breaking the measuring cylinder, I informed her immediately to hold me accountable. Errors likely to occur during the experiment have an insignificant effect on the accuracy of results. However, the quality of results was censured by use of a transducer to measure the confining pressure in the provided sample of soil (Soyoye and Ademosun, 2014 p.6). In addition, to reduce the effects of friction, the axial load of the soil sample was measured directly (Soyoye and Ademosun, 2014 p.6). Finally, I used universally accepted equipment and apparatus free from any pressure influences to limit deformation of the provided specimen. Reference Soyoye, B. O., & Ademosun, O. C. (2014). Investigation into some soil strength parameters using a locally developed soil shearing equipment. Agricultural Engineering International: CIGR Journal, 16(1), 12-20 Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Managing projects in engineering and construction Lab Report”, n.d.)
Managing projects in engineering and construction Lab Report. Retrieved from https://studentshare.org/engineering-and-construction/1700355-managing-projects-in-engineering-and-construction
(Managing Projects in Engineering and Construction Lab Report)
Managing Projects in Engineering and Construction Lab Report. https://studentshare.org/engineering-and-construction/1700355-managing-projects-in-engineering-and-construction.
“Managing Projects in Engineering and Construction Lab Report”, n.d. https://studentshare.org/engineering-and-construction/1700355-managing-projects-in-engineering-and-construction.
  • Cited: 0 times

CHECK THESE SAMPLES OF Managing projects in engineering and construction

Turner Construction Company

Turner construction has contributed fully or sizably to the construction of the United Nations Secretariat building located in Manhattan, New York, the multipurpose indoor venue the Madison Square Garden, passenger terminals at JFK International Airport, LaGuardia Airport, the current world's tallest structure.... hellip; Turner construction Company is regarded as one of the largest construction companies in the United States as well as the world, as its construction volume hovered around $8 billion in the year 2010....
16 Pages (4000 words) Essay

The UKs Construction Industry

engineering and construction Essay Name: Institution: Summary of UK's Construction Industry The construction industry in the United Kingdom has depicted steady growth over the past decade, with the commercial house construction industry and infrastructure or civil engineering sectors occupying the front position of the development trend.... Civil Engineering Sector Civil Engineering, which encompasses public works like railway, highway and other infrastructure constructions, is UK's building and construction industry's largest segment....
9 Pages (2250 words) Essay

Construction Engineering

the construction site is provided by roads to transport goods to that part of the area.... Must have ample space to accommodate construction machinery.... Must have proper area for dumping mud extracted from the construction site.... Quebec is rich in places that are suitable for the construction of power plant.... For the construction of such a facility in Quebec, following considerations are followed.... Facility must be having environmental conditions that support the construction and running of power plant, e....
6 Pages (1500 words) Assignment

Managing risk in construction project in developing countriess Ghana

To study the impact of these risks on the construction projects in Ghana , a quantitative survey has been conducted .... Based on the results of the statistical analyses , the research has suggested a set of strategies for risk management in the construction projects in Ghana .... -------- wish to dedicate this research work Based on the Risk Management in Construction projects in developing countries like Ghana , to my --------------- who had always been my ----------------- and I also dedicate this research work for the benefit of the people involved in the construction sector ....
75 Pages (18750 words) Essay

Managing Construction

In construction, this alternative is least dependable, since many skills are acquired from experience and workshop training.... eports have shown that there is dwindling productivity in the construction industry across UK.... Among the factors that affect productivity as discussed in this paper are employing skilled labor from abroad, increasing overtime for local skilled labor, rapid training of new local workers, and the use of more capital-intensive methods of construction (A 2000)....
8 Pages (2000 words) Essay

MSc in Civil Engineering and Construction Management

The team will determine how the functions of the construction can be simplified without sacrificing quality.... This report consists of a value management and value engineering studies.... The second part deals on value engineering approach and processes which involve imaginative and creative efforts, and methods and means to provide substitute materials, tools and processes which can give a valuing 'map' for the project.... ur company provides services to clients through value management and value engineering initiatives such as functional analysis which seeks to provide a valuing process to an existing project....
15 Pages (3750 words) Assignment

The Governments Programme of Waste Management: Risks in Construction Projects

Value management means looking for ways to increase the value of a proposed project or project under construction.... The second part of the study focuses on value engineering.... Although value management and value engineering are synonymous, they can mean two different things to a project engineer or to a VM study team....
16 Pages (4000 words) Research Paper

Managing Construction Projects

This work called "Managing construction Projects" describes the current trends in the UK construction industry.... The author takes into account the companies Constructing the Team, Rethinking construction, and Never Waste a Good Crisis with the aim of improving effectiveness, quality, and efficiency in the UK construction industry.... hellip; This was the driver to the drafting of the three reports that were aimed to improve the UK construction industry to be a global leader....
13 Pages (3250 words) Report