Name Tutor Course Date Construction Methods and means The standards and the outcome or features of this centre determine the rate in which it will take up its market niche and the consequent sustenance (Alpine, Daniel & Ronald, 54). The construction process of DMD center for fitness should be broken down into numerous stages, which include groundbreaking, initial ground leveling, brick construction and finishing…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.8% of users find it useful
Construction management
Read Text Preview

Extract of sample "Construction management"

Download file to see previous pages

The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as instructed by the construction manager and with the help of the project or center map. The function of the superintendent to perform close examination to ensure that, the laid daily schedule is followed such that, the set down period for the whole construction process can be adhered to.

More over, the superintendent ensures that the specified ratio of the materials is followed to the latter. The superintendent, ensures that proper records of equipment is well taken especially when begging the daily schedule and at the end of every day. This practice is endeavored to ensure safety and availability of such equipment as to when and where they are needed in the right condition. Labor situation The concept of labor requires the underlying principle of availability to be embraced.

Te superintendent, under the construction manager’s instruction should ensure that, the adequate labor is sustained all through the construction period. The labor schedule depends on the schedule of each day. For instance, less sub supervisors may be required when more work requires the supervisors. The superintendent, who in turn reports to the construction manager, directly does all this labor adjustments with proper consultation of the supervisors. However, in some cases, the superintendent can deny the construction managers’ projected schedule if it appears untenable.

A successful completion of this project entirely depended on the cordial and timely coordination of among the supervisors, superintendent and the construction. There should be continuous flow of correct information from top to down and vice versa. It should be observed that, the three levels of command have to coordinate all the activities in the site wit all aspects of professionalism and ethics. Construction ethics is necessary follow element because of its fundamental benefits attributed to it.

The site and construction ethics ensures smooth coordination and reduced incidents of accidents. Start up considerations At the commencement of the center’s activities, numerous start-up considerations are critical for a good start. Some of these include the operation staff, which includes the management team and the ordinary staff, training of the employees, motivation and general maintenance of the center facilities. The considerations should be carried out with outmost honesty and professionalism, particularly when recruiting the staff to set a pace, which may form the company’s norm.

Operations staff The owner of the DMD intends to carry out all the activities involving management recruitment. These activities include advertisement for various job opportunities. Having been the district human resource manager at the department of Health and sanitation, he has apt experience in recruiting the required team, which will perform assigned duties in tandem with the dynamism in this industry. The center owner will have to select the appropriate

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction management Essay Example | Topics and Well Written Essays - 1000 words”, n.d.)
Construction management Essay Example | Topics and Well Written Essays - 1000 words. Retrieved from https://studentshare.org/engineering-and-construction/1475405-construction-management
(Construction Management Essay Example | Topics and Well Written Essays - 1000 Words)
Construction Management Essay Example | Topics and Well Written Essays - 1000 Words. https://studentshare.org/engineering-and-construction/1475405-construction-management.
“Construction Management Essay Example | Topics and Well Written Essays - 1000 Words”, n.d. https://studentshare.org/engineering-and-construction/1475405-construction-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction management

Development Process in Construction Management

Development Process in construction management In the building and construction industry, many projects sprout each year with the expectations of meeting certain objectives in specific timelines and within certain constraint budgets.... hellip; The process of development and construction narrows down to management theories applied and the effectiveness in which such theories are applied in the building and construction process.... Construction managers and contractors in order to remain competitive in the current globalised world, have to be conversant with the appropriate theories and practices in the modern management fields to cope with a fast challenging global market....
6 Pages (1500 words) Essay

BIM and Construction management

BIM and Construction Cost management Name: Institution: BIM and Construction Cost management BIM stands for Building information modeling.... BIM is concerned with adoption of new and advanced technology in the construction industry; and emphasizes on information; communication of information across all sectors of the construction work; use of digital options for transforming physical facilities or buildings and sharing of this information for decision making....
4 Pages (1000 words) Assignment

Construction Management and Contract Law

It is better and easier and many times more accurate to adopt and alter the existing standard construction agreements for our own benefit, if needed.... RIBA 2005 is the new set of documents that is available for construction companies and builder to make up contracts with every one of the sub contractors.... construction contracts are more in line with the expectations of the construction industry.... This may not be comfortable in our current case since there could be changes in the design and the concepts which the owner might like to modify as the construction progresses....
19 Pages (4750 words) Essay

Construction Management & Organisation

Project management involves planning, organizing, scheduling, managing, directing, controlling resources and interdependent activities to achieve specified goals or objectives.... An effective project management has got four main functions; Project planning, team building, directing and control measures....
7 Pages (1750 words) Essay

Introduction to Construction Management

I am taking this class to discover new ideas in construction management, and to fulfill my… After attending this class, I became more interested in construction management field.... If I had a chance to change my major, I would definitely choose construction management.... I have Purdue Calumet School of Technology CMET 10300 Introduction to construction management December 9, Dr.... I am taking this class to discover new ideas in construction management, and to fulfill my graduation requirements....
1 Pages (250 words) Essay

Applied Construction Management

The construction will be brought up on an existing green field site that is located to the north of the north west of Leeds.... The city is one of the fastest growing in the United… The constructed car park will be of essence since the off street parking is limited to a maximum of an hour (Arnold, 2012)....
14 Pages (3500 words) Coursework

Construction Management & Economics: Lean Construction

Lean production as associated with management is a systemic approach to minimizing losses or waste and maximizing value creation so that the subsequent techniques are refined to achieve a degree of sophistication in preconceived management settings.... The author concludes that starting from highly theoretical approaches in the early 1990s up to this moment lean construction has come through a labyrinthine of ups and downs.... However, its current literature suggests that there is more promise than dejection in the coming years in lean construction....
10 Pages (2500 words) Literature review

The Construction Management

This paper "The construction management" presents the business of construction that is, indeed, a very rewarding one.... This shows that the owner has opted for a Cost Plus Fee type of construction management procurement method.... Additionally, the interested companies need to present the proof of availability of the required staff educated and trained in construction management practices, and other resources that the owner feels necessary for a construction manager to be equipped with, in order to ensure efficient supervision of the project....
9 Pages (2250 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us