StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Development Process in Construction Management - Essay Example

Cite this document
Summary
Development Process in Construction Management In the building and construction industry, many projects sprout each year with the expectations of meeting certain objectives in specific timelines and within certain constraint budgets. However, in most cases, most of these projects never get to fruition, with others consuming exaggerated budgets and with serious time constraints that most of them do not meet…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.5% of users find it useful
Development Process in Construction Management
Read Text Preview

Extract of sample "Development Process in Construction Management"

Download file to see previous pages

Hill & Jones (2009) explains a strategy to be a set or related actions that managers have to employ to increase the performance of their projects or companies. A strategy that would result to superior results as compared to the market practices would end up achieving a competitive advantage in the market, and such advantage would result to profitability, efficiency and effectiveness in the building industry. In this article, the planning and initial construction stages would be investigated in light of the applicable management theories that would enhance both efficiency and effectiveness in such a process.

Koontz & Weihrich (2009) explain that the process approach to management theory clearly elaborates the roles of managers in any organization or set up. Generally, the process approach relates to the principles, concepts and techniques that are involved in the process of management. As Kootz & Weihrich elaborate, such activities as staffing, departmentation, managerial appraisals and control techniques can only be well indentified in situations where management is well elaborated. In construction, these processes are well elaborated and utilized effectively in the entire process.

Management may be defined as making things happen through people; meaning that the process of planning, directing, controlling, staffing and remunerating have to be well elaborated in such processes as some of the concepts that have to be applied in such building stages. System theory is one of the theories that would be applicable in the construction stages. Process theory will require that the manager has to view the whole process as a systematic and linked process rather than several individual steps that make up the whole (Koontz & Weihrich, 2009).

From site exploration and demarcation, site preparation, material delivery, hiring of qualified staff and relocating them to site, allocation of the relevant equipment and facilities, and the allocation of the respective duties to the hired staff; the manager in the construction project has to carry out each task systematically, and in respect to the priority of such tasks. This is in line with the planning task in management that has to involve systematic decisions and evaluation of the necessary steps to be taken in accomplishing the respective task.

In this respect, the functional manager in charge of the construction project has to be involved in each of the above planning process before the actual project commences to ensure a smooth flow of operations once the project is initiated without delays and unnecessary idle time in site. Theories in Supply chain management have to be articulated at the planning stage or before the building project commences. One of the industrial theories applicable in supply chain management is the Just in Time delivery system.

This system was initiated in Toyota manufacturing plants in Japan and was aimed at regulating supplies to the Toyota motor factory just in the right –small – bits and in the right time (Vrijhoef & Koskela, 2000). The aim of this approach in supply chain management was to decrease inventories and to regulate the interaction between suppliers and the production line. In a construction

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Development Process in Construction Management Essay”, n.d.)
Development Process in Construction Management Essay. Retrieved from https://studentshare.org/engineering-and-construction/1441407-development-process-in-construction-management
(Development Process in Construction Management Essay)
Development Process in Construction Management Essay. https://studentshare.org/engineering-and-construction/1441407-development-process-in-construction-management.
“Development Process in Construction Management Essay”, n.d. https://studentshare.org/engineering-and-construction/1441407-development-process-in-construction-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Development Process in Construction Management

Current Construction Industry Development in Russia

These include highway construction, sewerage system, metro / subway systems, electricity cables and transmissions systems, nuclear power facilities, water systems, flood management systems, natural disaster and war underground hiding bunkers, and hydropower plant systems (Beer 2009).... 1 INTRODUCTION Over the past five years, the construction industry has been awash with tunnelling projects with there being a lot of enthusiasm globally from industry players (Deloitte 2012)....
50 Pages (12500 words) Dissertation

The Role of Time Management in Construction Projects

ROLE OF TIME MANAGEMENT in construction PROJECTS Research Proposal Names Student Numbers MOITRAYEE BASU ------------------------ Table of Contents 1.... TITLE: ROLE OF TIME MANAGEMENT in construction PROJECTS 2.... Therefore, it will be helpful to experts in construction industry.... Thirdly, it will increase my understanding and insight in construction projects.... DATA COLLECTION METHODOLOGY Primary data will be collected to identify factors and assess effects of time delays in construction projects as well as assess various time management techniques....
5 Pages (1250 words) Essay

What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the Construction

The study "What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the construction?... hellip; The financial variation has developed great challenges to professionals who have engaged in housing and regeneration process.... The housing financial sectors can play very essential and important roles in this process.... The main disadvantage of this process is the instability of the global economic condition....
8 Pages (2000 words) Term Paper

Business Process Reengineering in Construction Industry

Systems and reengineering processes have to be put in place for the replacement of these natural resources with eco-friendly, recyclable material. … Eco-friendly construction not only ensures an amiable exterior, it also helps keep the interior of the building healthier.... The construction industry has also seen tremendous changes in the recent past.... Reengineering of business processes has led to several changes in the way the construction industry operates today....
4 Pages (1000 words) Essay

Role of Time Management in Construction Projects

This paper "Role of Time Management in construction Projects" focuses on the fact that Igroup (2011) revealed that the value of real estate projects under construction in Saudi Arabia is estimated to be about $586 billion.... hellip; The questionnaire will be developed to obtain information regarding appropriate time management techniques as well as causes and effects of project delays in construction projects.... rimary data will be collected to identify factors and assess the effects of time delays in construction projects as well as assess various time management techniques....
5 Pages (1250 words) Research Proposal

Concept of Sustainable Construction

"Concept of Sustainable construction" paper highlights in-depth the concept of sustainable constructions, analyze available methods of assessing sustainable construction, and gives analysis and recommendations for sustainable construction in the United Kingdom.... Sustainable construction involves a range of priorities and restrictions under which to produce good design and well constructed, usable buildings (Kibert, 2008).... lthough it is hindered by time and costing on the achievement of buildings of architectural merit, sustainable construction entails constructing using the best methods and processes....
8 Pages (2000 words) Coursework

Construction of Tall Buildings in South East Asia

The advancement in construction methods such as in-situ concrete and precast, as well as steel structure methods, has made it possible to build tall buildings within a short period.... This report "construction of Tall Buildings in South East Asia" discusses the construction of tall buildings that involves the consideration of many complex factors which include economic, technological, government, or municipal regulations and political stability of the country....
12 Pages (3000 words) Report

Waste Management in Construction Site in Oman

"Waste Management in construction Site in Oman" paper reviews wastes related to the construction sector, strategies of management and their advantages, and the barriers of waste management strategies.... The paper compares waste management strategies between the construction sectors of Oman and the UK.... The menace of waste causes a lot of managerial problems as well as challenges to natural resource management.... More innovation and management measures are therefore created to reduce the impacts of; human activities generating wastes; and reduce the impacts of wastes on the environment....
19 Pages (4750 words) Literature review
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us