StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Construction of Tall Buildings in South East Asia - Report Example

Cite this document
Summary
This report "Construction of Tall Buildings in South East Asia" discusses the construction of tall buildings that involves the consideration of many complex factors which include economic, technological, government, or municipal regulations and political stability of the country…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.9% of users find it useful

Extract of sample "Construction of Tall Buildings in South East Asia"

Construction of Tall Buildings in South East Asia Name Institution Instructor Course Date Executive summary The construction of tall buildings is one of the most dominating structures in most parts of South East Asia. This is due to the advancement in technology which has resulted in building more stable tall buildings using the available string materials such as concrete and steel. The construction of a tall building g requires the development of a construction process which acts as the guideline for the completion of the project. This also involves the legal formalities which are involved in the constructions of high rise structure. The advancement in construction methods such as in-situ concrete and precast, as well as steel structure methods has made it possible to build tall buildings within a short period. Moreover, the best construction materials depend on the purpose of the building and regulatory requirements as well as the nature of the soil which determines the foundation and construction methods of the basement. The construction methods in South East Asia are more similar to those in Australia. However, Australian engineers have started using wood panels in building high rise buildings. This paper has discussed the construction methods in south East Asia and the materials involved in order to achieve best structures. Introduction The most dominating symbols in terms of buildings in South East Asia are mega structures including tall buildings. Most of the tall buildings in South East Asia were constructed in order to serve as commercial buildings (Ali & Al-Kodmany, 2012, p. 384). The earliest tall buildings were constructed in the United States of America. However, with increases in investment, mostly if the buildings are now common in Asia. This means that there has been an increase in construction of a tall building in Asia than kin any other part of the world. Most of the tall buildings in South East Asia are serving as commercial buildings, residential and hotels. The construction of tall buildings involves the consideration of many complex factors which include economic, technological, government or municipal regulations and political stability of the country (Cuthbert, 2006, p. 45). The most influential factors in the construction of tall buildings include economics and technology. Additionally, the extraordinary nature of the buildings requires the engineers to consider certain factors in materials and methods of constructions in order to make the buildings stronger and prevent them from falling (Ghafoori, 2011, p. 95). The revolution in the structure of buildings from the timber based, and concrete based to the steel based materials have also encouraged the building g of tall structures in various parts of the world. The revolution has also changed to incorporate steel and glass materials for the walls have led to the development of the skyscraper. A tall building requires sophisticated foundations, structural system, and electrical engineering equipment, which is able to support the other building materials (Ali & Al-Kodmany, 2012, p. 385). Moreover, the construction requires a large basement and core area which is able to accommodate the elevator systems services. Tall buildings are also affected by environmental factors such as wind and gravity which is dependent on the material type. The height of the building should also consider factors such as access to light. Thesis Statement The construction of tall buildings requires proper planning and organization. The purpose of this paper is to explore the construction process, building materials that are involved in the construction of tall buildings ion south East Asia. Additionally, the paper will focus on the construction methods in south East Asia and compare them with the construction methods in Australia. The paper will conclude by recommending the best construction materials. The Construction Process The construction of the tallest building in South East Asia involves construction managers who monitor the whole construction process. The tall building construction is headed by a construction and project management committee which is responsible for overseeing the design and construction process of the tall buildings. The construction process can be summarised in a construction cycle which involves programming of the project, schematic design, design development, construction documents, bidding, construction, and occupancy of the building. Programming The committee responsible for the development of the project is responsible for making the necessary decisions on behalf of the stakeholders of the project. This committee makes decisions that regard to the stakeholder’s requirements in the building. During programming, the committee develops a program of requirements which contains the objectives, spaces, the equipment, furniture and all spatial relationships. In addition, the committee develops the documents in the requirements projects which are then approved by the relevant authorities prior to the construction process. The estimated time for programming is estimated to be between two months and six months depending on the nature and number of stories the building should have (Anatomy of a Construction Project (n.d). Design Professionals This is the selection of the company that will be responsible for designing the architecture of the building. There are various firms in south East Asia which offered architecture designs in engineering of tall buildings. In practice, the design professionals are incorporated to the project team in order to work as one team. In most cases, the design professional team is selected through vigorous interviews in the projects in order to select the best team which will offer the best design and services. The firms that win the designing of the building is then provided with the program of requirements, the standard for constructions of building, the schedule in constructing the high rise building, the budget in constructing the building, and all the necessary basics involved in the construction of the building. This process is estimated to take not more than two months (Cuthbert, 2006, 25). Schematic Design In this step, the construction design team considers a variety of factors which include the number of individuals who should be allowed to occupy the building. The design team develops a schematic diagram which shows all sizes of the rooms and systems in the building. This schematic diagram should clearly indicate the water systems, electrical systems and other systems that are crucial in facilitating the use of the building. This schematic diagram will also show the external and interior of the building and their relationship. This schematic diagram is them presented to the relevant committee and authority for approval. Since it involves evaluation and approval at various stages and by different authorities, this step may take 2-4 months. Design Development The design team then splits the schematic design into various plans and elevations. The building committee reviews the colour, materials, and building equipment that will be required in the construction. In this stage, the complete plan of the building is revealed and discussed for approval (Anatomy of a Construction Project (n.d). Construction Documents The approved design and requirements documents are then used by the project manager in securing a building permit. The designs are used to design the comprehensive drawing of the construction and the specifications which are vital in obtaining the construction permit from the relevant authorities. There are various parts, which are followed in obtaining a construction permit in most parts of South East Asia. In an application for the construction permit, the municipal authorities inspect the construction site in order to approve its suitability for the tall building. In this step, the necessary documents for approval are submitted. Before the plan can be approved, the relevant building authorities inspect the building plan and the construction site in order to see whether the plan is suitable with the site of construction. After the approval, the construction manager is given a construction permit. The construction team then requests for a building controller who will be responsible for controlling the construction of the building. This controller is the supervisor of the project. In most cases, the supervisor is the owner of the construction company and is assumed to meet all the necessary requirements. In addition, the company requests for telephone and water connection from the relevant authorities. The company then embarks on the building process of the company. On completion, the inspection authority inspects the building before it is occupied by the president and commercial business owners (Anatomy of a Construction Project (n.d). Construction Materials and Methods The engineers use various construction methods in the construction of tall buildings. Since the buildings in most cities are situated in capital cities, the construction occupies the whole construction site (Short, 2012, p. 26). The methods they used in the construction of tall buildings considered the environmental impacts of the tall building. In their methods, the engineers used a designated off site location in storing the materials used in the constructions of the building. The construction methods are considered facts such as costs, times, environmental impact, logistics and flexibility of the construction method. In-Situ Constructions This is a construction method in which the construction materials are made at the construction site. This is because the construction of tall buildings requires more materials which means they will have to be transported from the factory to the construction site. In situ construction methods consider labour costs in the construction of tall buildings. Since the materials are manufactured at the site of construction, they reduce the cost of transportation. In addition, this technique uses cheaper raw materials in constructing the building. In this method, the engineers use a mixture of builder’s mix which then blended with cement and water. This mixture is freed from oil and acids. The cement in the manufacturing g site is made of lime and gypsum which is readily available in most parts of China, Thailand and other parts of South East Asia. This insitu concrete is stronger and durable, stable, and easy to maintain. This is mostly used in constructions where accessing the construction site is difficult. Since most of the tall buildings require meeting certain condition in order to comply with wind and other environmental constraints such as gravity, the materials require being shaped inn certain shapes. In-situ concrete can be shaped in various ways to accommodate desired shapes. However, the use of in situ construction method is not possible in countries that have changing weather conditions (Bennett, 2002, p. 318). Precast Constructions This is a construction method in which the concrete is manufactured away from the construction site. With the growing technology and the need to reduce cost of construction as well as construct more strong buildings, the use of modern construction methods such as precast is becoming common. In this method of construction, the precast concrete is done by moulding the concrete in a different place in a reusable form and then lifted to the construction sites where it is placed in the desired manner. Tall buildings take a long time to complete hence the need to establish a construction method which is quicker and cost effective (Taranath, 2011, p. 189). The precast construction method offers the engineers with a quicker reaction time, there is a reduced need for a plant in the construction site, good management of the construction site, and can be beneficial especially for tall complex buildings. This method is preferred compared to the in situ constructions since it produces more durable construction materials and can be used for quicker projects with more complex designs. This method offers a lot of advantages include the use of fewer resources on the site of constructions hence cannot be affected by weather conditions. Additionally, the quality of the material is sophisticated since the materials are manufactured at optimized conditions in the manufacturing firms away from the construction sites (Lin, 2009, p. 284). Figure 1. Precast Concrete Material Structural Steel Constructions In south East Asia countries including china, steel structure construction has been used for many decades. Examples of the mega structure that used steel structure construction methods include the Shanghai bank corporations well as the old bank of china building in Hong king china. In the recent years, buildings that have used the steel construction methods include the park lane hotel, convention and exhibition centre and Manulife tower in china. Most of the old structure used steel with broad bases (Lin, 2009, p. 295). However, with the increased demand for high rise structure, the steel structure construction method has been modified in order to suit the tall buildings. The tall buildings using steel structure are built in order to sustain typhoon and high winds. In tall buildings, the steel used is highly tensile, withy improved connection and fireproofing materials. The use of steel structure construction is preferred compared to all other methods because of the following benefits (Taranath, 2011, p. 45). a) Structural performance: The materials made of steel are able to withstand high compression, has a high yield of stress which is able to take any form of tension. This is better as compared to insitu concrete or precast concrete constructions. Tall buildings require the use of light materials in order to reduce the weight of the building during construction. This is to minimize the risk of collapse. Steel is a light material which is stronger. This makes it possible for the engineers to use less building materials. This also reduces the size of the foundations and the size of the column while achieving a large span. Moreover, the fabrication of the steel is done in the factory hence producing high quality building materials. In case of amendments or expansion of the structure is required, the steel materials offer an easy member connection which makes it faster and reliable. b) Construction: The construction speed in steel structure construction is faster. This is because most of the materials made of steel are fabricated away from the construction site. This gives room for other construction works to continue. This means that foundation and erection of the building are faster when using steel structure construction as compared to in situ construction method. c) Maintenance: the cost of maintaining steel structure is less and affordable. However, the use of steel structure has certain limitations. Since the materials are fabricated away from the construction site, there is an increase in labour and transportation costs. In case of fire, the strength of steel is weakened hence may lead to collapse of the building. Moreover, deflection may occur especially when the steel is exposed to varying weights at very extremely high temperature. In addition, the demand for fire and safety securities require the steel to be protected from fire since it loses its strength when exposed to fire. This makes it less common in building of the tall structure especially when there are no enough resources and funds. This means that the performance of steel in tall buildings requires reinforcement with concrete materials in order to make it useable and comply with health and safety regulations as well as fire safety regulations (Takumi et al., 2009). Figure 2: Steel Construction Materials Basement Methods Construction The basement is the most important structure of the tall buildings. The basement is constructed using steel structure methods which are combined with concrete in order to make it more firms. A steel structure is erected in the form of a pile to make steel columns. These steel columns are used to support the basement slab which is made of concrete in a top down construction sequence. The first slab of the basement is usually cast after the after the core wall in order to allow the structural frame and core walls to proceed upwards. Therefore, the construction of the tall building basement involves the excavation of the site, building the concrete, construction of the raft foundation, reinforcing the foundation with steel structures, and covering the structure with a concrete floor. Therefore, the construction methods are top downs and open cut construction methods (Lin, 2009, p. 145). Foundation Construction Methods The foundation of tall buildings determines the stability of the building. There are different types of foundation which include pile foundations, raft foundation and pad foundations which are used in tall buildings. The selection of the type foundation depends on the nature of the soil. Hence, a strong building material is required in order to ensure stability of the high rise structure. The foundation construction methods include in situ constructions, which are used to assess the engineering appropriateness of the strata. The in situ method is preferred since the construction of the building is in its initial stages hence there is not much work at the construction site (Lin, 2009, p. 61). Discussion The construction of tall buildings in South East Asia has incorporated the use of various construction methods. Most of these high rise mega structures are built in order to withstand environmental impacts such as strong wind currents and gravity. There are various construction methods which are used in building tall buildings. The nature of the materials used in the construction of tall buildings determines the type of concrete construction methods (Taranath, 2011, p. 129). The most commonly used construction methods in South East Asia especially and japan includes in situ construction methods, precast concrete construction methods and steel structure constriction methods. The use of in situ method is best when the project manages wants to reduce the construction costs and ensure quicker erection. However, this method is not preferred especially when the structure is several hundreds of meters high. The in situ is best for foundations. The use of steel is the most preferred method due to its strengths and ability to resist fire. However, when exposed to high temperatures, steel loses its tensile strengths and may collapse. Therefore, steel reinforces with concrete in order to abide by fire regulations. In the construction of tall buildings, the construction process involves a variety of steps (Lin, 2009, p. 296). The best steps involved in the construction of tall building include the setup of the project management committee which is headed by a project manager. The project manager chairs the programming team which is responsible for developing the requirements of the construction. The next step is choosing a design professional firm which design the schematic design and develop the construction design, upon approval of the development design, the supervisor of the project seeks the necessary construction permit from the relevant authority which allows the construction firm to start the construction of the building. The construction process in South East Asia countries is more or less similar to that of Australia. Most of the Australian tall buildings are constructed using steel and concrete materials. In the construction of foundations, the engineers in Australia use concrete and steel reinforcements. However, the engineers in Australia also use wooden materials in building tall houses. The woods are used in making the panels of the high rise buildings (Harris, 2012). Conclusion The construction of tall buildings involves the consideration of many complex factors which include economic, technological, government or municipal regulations and political stability of the country. The most influential factors in the construction of tall buildings include economics and technology. The construction of tall building g requires the development of a construction process which acts as the guideline for the completion of the project. This also involves the legal formalities which are involved in the constructions of high rise structure. The advancement in construction methods such as in situ concrete and precast as well as steel structure methods have made it possible to build tall buildings within a short period of time. Therefore, in constructing tall buildings, engineers in south East Asia utilize a variety of construction methods and materials which were discussed in the report. References Anatomy of a Construction Project (n.d). The Design and Construction Process. (Online). Available at :< http://www.cod.edu/facilities_plan/DESIGN1.pdf> accessed on 13-05-2013 Ali, M., & Al-Kodmany, K., 2012. Tall Buildings and Urban Habitat of the 21st Century: A Global Perspective. Buildings, 2: pp. 384-423. Ali, M., & Moon, K., 2007. Structural Developments in Tall Buildings: Current Trends and Future Prospects. Architectural Science Review, 50 (3): pp. 205-223 Bennett, D., 2002. Innovations in Concrete. Hong Kong: Thomas Telford Cuthbert, A., 2006. The Form of Cities: Political Economy and Urban Design. Malden: Blackwell Publishing: Ghafoori, N., 2011. Challenges, Opportunities and Solutions in Structural Engineering and Construction. Boca Raton: CRC Press Harris, M., 2012. Wooden high-rise buildings. (Online). Available at: < http://eandt.theiet.org/magazine/2012/09/wood-goes-high-rise.cfm> Accessed on 13-05-2013. Lin, M., 2009. Construction Technology for Tall Buildings. New Jersey: World Scientific Short, M., 2012. Planning for Tall Buildings SHORT. London: Routledge Takumi, I., Seiji, F., & Akio, O., 2009. Overview and Application of Steel Materials for High-Rise Buildings. JFE Technical Report. Taranath, B., 2011. Structural Analysis and Design of Tall Buildings: Steel and Composite Construction. Boca Raton: Tailor & Francis Appendix 1: Examples of tall buildings in South East Asia. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Construction of Tall Buildings in South East Asia Report, n.d.)
Construction of Tall Buildings in South East Asia Report. https://studentshare.org/engineering-and-construction/2050226-construction-of-tall-buildings-in-south-east-asia
(Construction of Tall Buildings in South East Asia Report)
Construction of Tall Buildings in South East Asia Report. https://studentshare.org/engineering-and-construction/2050226-construction-of-tall-buildings-in-south-east-asia.
“Construction of Tall Buildings in South East Asia Report”. https://studentshare.org/engineering-and-construction/2050226-construction-of-tall-buildings-in-south-east-asia.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction of Tall Buildings in South East Asia

Great Mosque of the Masjid-I-Jami Isfanhan, Iran 1088

It fits the requirements in construction of a mosque which ensures that it should cover its special area distinct from the main city.... hellip; This is the city of Khwarazm and Transoxiana tribes whose homeland is the continent of asia.... Mosque of the Masjid-I-Jami Isfanhan, Iran 1088 Your Instructor Contents Contents 2 Description of the Building 3 The Influence of the Environment 9 The Influence of the Society 11 The Influence on Technology 11 The Influence of the Artistry 12 Conclusion 13 References 13 Mosque of the Masjid-I-Jami Isfanhan, Iran 1088 Description of the Building Mosque of the masjid-I-Jami Isfanhan is located in the capital city of the Seljuks which is about 340 kilometers south of Tehran....
11 Pages (2750 words) Essay

Business Ethics and the Global Dimensions of Business

The strategic path XYZ Construction is considering of expanding into asia is an excellent idea.... I do not recommend a full expansion plan into asia because they are a lot of countries in asia that are extremely poor with a lack of economic resources.... asia is the world's largest continent with an area of 17.... People in asia are disciplined and believe in the common good of the group.... Socialism is widely practice throughout asia....
4 Pages (1000 words) Essay

Design Trends of the Burj Khalifa Building

The construction of this building began on the 21st of September 2004 (Goldsworthy, 8).... Courtesy of this building, it is possible to denote that the honor of having the tallest structure in the globe has returned to the Middle east.... Samsung is a south Korean company that has interests in the construction and the electronics industry.... However, it is important to denote that these changes in height did not encompass a change in the addition of the buildings floors....
6 Pages (1500 words) Essay

Modern Architectural World

In their dimension, intricacy, and prolonged existence, the foremost civilizations to build up in south Asia and China contest and in some respects exceed the earliest civilizations in Mesopotamia and Egypt.... The reporter becomes conscious of how several buildings at the present time, that tend to mimic the natural environment....
4 Pages (1000 words) Essay

Analysis of Shopping Malls - Doha Festival City Center and SM Lanang Premier

The construction design serves to satisfy urban morphology.... The paper "Analysis of Shopping Malls - Doha Festival City Center and SM Lanang Premier" states that SM Lanang Premier mall takes a closed-form from outside.... However, the interior is structured in such an open way that it is possible for visitors to have a clear view of all preceding floors....
2 Pages (500 words) Coursework

The Regional Pattern of Construction in the Globe

"The Regional Pattern of construction in the Globe" paper talks about the strategy most companies use to diversify their business in different sectors.... nbsp;… The factors that will keep construction growing, and where the funds will come from.... nbsp;  At the same time, the paper is going to talk about the analysis of the total volume of international construction, and comment on the trend in the Less Developed Countries, Advanced Industrialized Countries, and Newly Industrialized Countries....
7 Pages (1750 words) Coursework

Land Analysis in the Lao Country

hellip; The Lao Republic is a landlocked country meaning that it is located in a position where it does not have access to the sea, it is located in southeast asia and borders China to the north, Cambodia to the south, and Vietnam to the east, it is a large nation with a total area of 236 square kilometers and a population size of  6.... Terrain: The Lao nation has many rivers and mountains, major rivers include the Mekong river which is a major transport resource, and the Nam Tha river which our dam under analysis is being constructed, to the south of the country there is also the Dong falls which is a major tourist attraction bringing in foreign income to the country....
9 Pages (2250 words) Assignment

Conservation of Old Buildings The Essential Bridge from Yore to Future

"Conservation of Old buildings The Essential Bridge from Yore to Future" paper describes the relationship that human beings have with buildings and argue that ancient buildings need to be preserved, as record points of human evolution, as well as fountains of human inspiration.... hellip; buildings have always been an integral part of human existence; initially as essential shelter and later as a symbol of human development and progress....
7 Pages (1750 words) Term Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us