An approach list of the lodge substructure; The construction of the lodge will undergo three stages namely ground works, brick work, wall plastering and roofing. Each of the construction stages has several works and costs to be incurred in the process of the construction…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.6% of users find it useful
Construction Cost Control & Management
Read Text Preview

Extract of sample "Construction Cost Control & Management"

Download file to see previous pages

The length of the lodge is 14 meters and the width is 10 meters. The rear roofing will not be excavated. The perimeter area that is to be excavated is the outer 2m width, and the depth will be 2.75 m. On the first day at the site, only the excavator and the driver will be present since the only work on that day will only involve digging up the ground. The material extracted is of poor quality and will be deposited in a pit far away from the site. The material is to be transported to a pit 8 km away by 20 tones capacity lorry.

The number of lorries to be used during excavation period are two, which means the time taken to load one lorry is equal to the time taken by the other lorry to ferry the unwanted soil and come back. The time taken to load a lorry is estimated to be 30 minutes, thus, the speed of the lorry is 32 km per hour. That means in a day each lorry is expected to make 8 trips but one lorry will take one less trip which is lost at the start of the day meaning the total number made in a day are 15. Thus, the excavator and the general operations will take 12 days while the lorry and the loader will cover 12 days.

The ground work will involve the laying down of a building foundation that will include parts of walls, piers and a column. The foundation will have to be strong and this means it has to be dug deeper enough to enable stability of the lodge. The ground work stage will be have various costs expenditures in the excavation process which will include payment of the wheeled excavator, cost of hiring a lorry to transport the excavated soil, paying the loader back hoe, tipping fee and other general operative costs.

The workers will take 8 hours per day and the work will be carried out for six days a week. Thus, the excavation will take 96 hours since the maximum period allowed is two weeks. The tipping site is paid per 10000 m3 lorry capacity deposited for price of $20. The cost of the various tasks attached to the groundwork stage are general operation costs $12 per hour, lorry and driver $38 per hour, wheel excavator and driver $35 per hour and loader backhoe $32 per hour. Brickwork; the walls of the lodge are to be built by bricks with a cement lime mortar.

The number of bricks that will be used in the construction of the lodge will depend on the perimeter, height and partition of the lodge. The costs that will be involved in brickwork are that of purchasing the bricks, cement, cost of hiring a mixer, cost of labor and general operative costs. The price of the block bricks is $ 54 per 1000 bricks and the price of the hollow bricks is $ 100 per 1000 bricks. The overall cost charged by the contractor includes the cost of the materials, 8% on overheads and profit.

The appearance of the wall is to be improved during the course of the contract by hollow bricks of different which will be sourced from a different manufacturer. Thus, the cost of the bricks will different due to their nature. The sunken bricks are more easily broken than the rest and the amount of waste is expected to be twice of the other bricks. The cost of the two types of bricks differs in their prices levels. The cost of block bricks is estimated to cost 75% to the price of the hollow bricks.

Wall cladding; the wall cladding will involve the process of installing the bricks to form walls and the floor of the lodge. The installation process will face two set of periods because of the two types

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction Cost Control & Management Coursework - 1”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1398184-construction-cost-control-management
(Construction Cost Control & Management Coursework - 1)
https://studentshare.org/engineering-and-construction/1398184-construction-cost-control-management.
“Construction Cost Control & Management Coursework - 1”, n.d. https://studentshare.org/engineering-and-construction/1398184-construction-cost-control-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction Cost Control & Management

A Complete Guide to Urban Construction with the Calculation of All Business Variables

[Finance, planning and budgeting of construction of houses in urban areas] by Gregory Whitfield [Project management for Construction] [University of] [4/5/11] Acknowledgement I would take this opportunity to thank my research supervisor, family and friends for their support and guidance without which this research would not have been possible.... Table of Contents Acknowledgement ii DECLARATION iii Abstract iv CHAPTER 1: INTRODUCTION 1 Background of the research 1 Problem Statement 1 Aims and Objectives 1 Restrains Affecting the Thesis 2 Ethical Concern 2 CHAPTER 2: LITERATURE REVIEW 4 Sustainable urban development 4 Roadmap for sustainable development 5 Documentation for Planning and Integrated 7 Planning and Building control 8 Sections of the work 10 Personal and Financial Programs 13 Main Controls 15 New Urbanism 17 CHAPTER 3: METHODOLOGY 19 Research Method 20 Research Instruments 20 Sampling 20 CHAPTER 4: DISCUSSION AND ANALYSIS 21 Construction 21 Residential Houses: Constructional procedure 23 Quality features of the process 24 Quality features of the product 25 Aims and Rationale for Budgeting 26 Principles of Change with Impact on Budgeting 27 Leadership Challenges in Budgeting 27 Space Personalization 936w 28 Decorating Trends 28 Building a Home Construction Budget 550w 31 Statistics and Housing 33 Mortgage Economics 34 Government Policy 36 Housing Boom and Bust 39 Upcoming Research Prospects 42 CHAPTER 5: CONCLUSION 44 Analytical Conclusion 47 BIBLIOGRAPHY 48 Heather, S....
50 Pages (12500 words) Essay

Project Performance and Control on the London 2012 Construction Programme

The overall performance of the program is indicative of the accuracy of methods employed, the appropriate estimations, and the quality of controls and management systems employed before and in the course of the construction.... Forensic schedule analysis and cost management are some of the key indicators of success that attend to construction projects in many parts of the world.... On this note, it becomes important to assess the program as a case in point of the effect of coordination and management on the performance of processes as understood within the construction industry....
4 Pages (1000 words) Essay

What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the Construction

While undertaking this task the government must simultaneously launch measures to reduce the price hike and cost of living among common men, so that the government can succeed in bringing the poverty under control.... The study "What Forced Governmental Agencies in Chesterfield Derbyshire to Study Planning in the construction?...
8 Pages (2000 words) Term Paper

Bulding and Constraction Company

Project management is an option when there are… e coordination issues, given the scope and scale of project undertaking, which deals with uniting various disciplines and professions toward specific objectives.... Engineers invented project management, given certain special habits of the trade in problem solving.... Tracking progress, reporting problems and altering the plan of action, requires the application of several project management tools....
17 Pages (4250 words) Research Paper

Supply chain management plan in construction project

This supply chain management (SCM) plan aims at centrally controlling and also linking the production, ferrying or shipment of construction materials, excellent information movement, and least financial costs from one point to another and finally to the site of construction a… The strategy lies in proper linking of the all stakeholders in material movement process ensuring that there is no break at any point of material transfer or material shortage whatsoever.... In the new multi-storey car park, emphasis is placed on the reduction of the inventory costs, timely availing of the construction items without delay of the required goods, least manpower wastage entailed in the process and professional management of the process....
6 Pages (1500 words) Coursework

The Risk and the Cost of the Construction Project of the Power Station

“The less business risk the owner wishes to assume, the higher the cost of construction and management.... Two forms of construction contracts are there, one is the EPC (Engineering, Procurement and Construction) while the other is EPCM (Engineering, Procurement and Construction management).... This paper "The Risk and the cost of the Construction Project of the Power Station" mentions that the Government of Ruritania is the commissioner of the project for the construction of a hydroelectric power station....
16 Pages (4000 words) Research Paper

Role of Time Management in Construction Projects

This paper "Role of Time management in Construction Projects" focuses on the fact that Igroup (2011) revealed that the value of real estate projects under construction in Saudi Arabia is estimated to be about $586 billion.... hellip; The questionnaire will be developed to obtain information regarding appropriate time management techniques as well as causes and effects of project delays in construction projects.... rimary data will be collected to identify factors and assess the effects of time delays in construction projects as well as assess various time management techniques....
5 Pages (1250 words) Research Proposal

Safe Work Method in Building and Construction

As a result, the building contractor will be required to have a greater awareness of construction waste disposal and management.... The author of the paper "Safe Work Method in Building and construction" states that building and construction present potential risks revolving around the contamination of water supplies, pollution, and physical damages among many other risk factors.... nbsp;… The risks posed in the paper depend on factors such as the site of construction, the materials used, the working practices, and the cleanness of the personnel involved....
7 Pages (1750 words) Assignment