StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free
Premium+

Creating A Methodology Case - Essay Example

Cite this document
Summary
This essay is about the "Creating A Methodology Case". Project management requires a company to justify every claim it makes. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.6% of users find it useful

Extract of sample "Creating A Methodology Case"

Creating a Methodology Case Essay

Project management requires a company to justify every claim it makes. This means producing enough evidence to show why change is inevitable. It is only when project management teams justify even the smallest needs for change that they can produce the best outcome. PMO seems to be the best project management tool for different reasons. It is best needed when a company needs to take drastic actions towards achieving its project goals. It brings together project managers from different departments and makes them focus their efforts on a company’s best interest. Here Is how to justify all claims regarding the use of PMOs and EPM systems in a company.

What can be said of the company’s corporate culture, given that it waited for so long before finally thinking of creating space for an EPM system?

It is undeniable that the company’s slow response is caused by its vertical organizational and management structure. All projects decisions are expected to pass through the top managers before being approved for implementation if found to be the best fit. Currently, most units are managed by individuals who are afraid of losing their power if this bureaucratic leadership structure was to be abolished. These managers are holding on to power by all means. The company needs to understand the threats caused by its competitors. The industry is already too competitive to be this slow in detecting and correcting areas of weakness. More recognition should be directed towards project management, which requires flexibility and speed in the implementation of any project deemed useful in the future of the organization. Everyone needs to work together to adopt the use of EPM systems in the company. Otherwise, the power play might be very costly to this company. Things should be changed through proper project management.

Can a PMO speed the acceleration process?

A PMO will speed up the implementation of EPM as it offers a clear guideline on the route to be followed to achieve desirable goals for the projects. Project management teams could use a PMO as a template or guide throughout the process for the avoidance of any confusion. It will bring them together to create a universal methodology that could help revive any company regardless of size or situation. PMO will make everything more uniform and shield everyone, including people in project management positions, from the disputes that could otherwise be caused by some people feeling like their project management ideas, are the best compared to those by others. Sadly, most people project managers never justify their stands with valid evidence. Notable PMO will only produce desired benefits if the steering team can justify most of its ideas.

Is it necessary for the PMO to be accountable to Chief Information Officers or anyone else?

Accountability is a crucial factor in any organization. Therefore, it is very acceptable for the PMO to exercise this virtue before a CIO or any other person in top management. This should be done to eliminate any stumbling blocks that might arise as a result of other people feeling sidelined during the project management exercise. Otherwise, such concerns are highly likely not to arise since the PMO is made up of qualified and experienced project managers from different departments. They understand what is needed to steer a project in the right direction. It could be assumed that they also understand the project that requires extensive consultation and accountability beyond the group setting. As a result, they should be given the benefit of the doubt that they will take the best projects management decision in the company’s best interest.

Why is there a need for a maximum of six life-cycle phases in an EPM system?

Having numerous gates would only be a distraction since the project management team could be forced to spend more time focusing on how to submit reports for each phase. They would lose focus on the final project goal, which is to create a highly effective and productive system. As a result, these phases should even be less than six, if possible. The lesser the distraction witnessed along the way, the higher the chances that this team will achieve its desired projects goal. Anyone could justify the need for fewer barriers in the life-cycle of an initiative.

What is the logic in designing an EPM system around elements that are either flexible or inflexible? Also, do organizations prefer formality or informality when first designing their EPM systems?

It is better to design an EPM systems around flexible elements, whether doing it for the first or umpteenth time. Project management teams should be as formal as they can by using checklists and other guidelines that will help them produces appropriate results. All paperwork must be in check to not only guide but also to document the process. This will help in future reference or during projects inspections to make sure that the right strategies were followed to the later. Being informal only increases the chances of project management team losing track of the process, subsequently increasing the chances of making mistakes along the way.

Should an EPM system be made in a way that makes it able to capture best practice?

An EPM system should definitely be able to capture best practice in an organization. This us of an EPM assures the organization of its longevity as errors are minimized, and drastic measures are taken to make the systems even more productive. In other words, the main interests of an organization should be to use every system it has in place to create a secure environment that detects and corrects faults rather than turning a blind eye on them. All these can be done by project managers who understand the value of operating within a well-organized system. Projects become better when such clear guidelines are followed.

These are some of the ideas you could include in creating a methodology case essay. Be thorough in your analysis. It helps when you sound knowledgeable in your explanation.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Creating A Methodology Case Essay Example | Topics and Well Written Essays - 1000 words, n.d.)
Creating A Methodology Case Essay Example | Topics and Well Written Essays - 1000 words. https://studentshare.org/business/2089391-creating-a-methodology-case-premium-essay
(Creating A Methodology Case Essay Example | Topics and Well Written Essays - 1000 Words)
Creating A Methodology Case Essay Example | Topics and Well Written Essays - 1000 Words. https://studentshare.org/business/2089391-creating-a-methodology-case-premium-essay.
“Creating A Methodology Case Essay Example | Topics and Well Written Essays - 1000 Words”. https://studentshare.org/business/2089391-creating-a-methodology-case-premium-essay.
  • Cited: 0 times

CHECK THESE SAMPLES OF Creating A Methodology Case

System Analysis for Carols Corner Store's Delivery of Goods and Efficient Movements of Products

The key objective of this project may be to implement an effective DBMS, which would enable Carol: - To keep an accurate product inventory, whether on display or within the storeroom; - To alert Caro or her employees in case there might be a need for a restock of the display shelves with goods from the storeroom, then later updating the inventory with the restocked amount; - To making a preparatory timely placement order from every supplier; The primary business benefit that needs to be enjoyed from the use of the new system is for Carol's store to maintain its level of competitiveness within the market at low costs....
8 Pages (2000 words) Case Study

Advanced Planning and Scheduling on the Manufacturer's Assembly Facilities

In manufacturing, APS gives a methodology of concurrent synchronization of material and capacity with customer orders.... This is a case of planning and scheduling for which primarily the concepts of application of Advanced Planning and Scheduling -- APS that is a decision support tool have to be used....
3 Pages (750 words) Case Study

VinKow Electronics, Inc.: Control Issues in Managing Sales returns

case in point, all benefits in the venture account should physically exist and be accessible to pay advantages or plan costs.... Controls ought to be focused around an efficient and danger arranged methodology, to guarantee that there are satisfactory controls in territories with high hazard, and that controls are not over the top in regions with generally safe.... Before settling on the choice to receive a control, investigate the expenses of creating and keeping up it, and consider: Focus THE Plans CONTROL Targets — the initial phase in securing controls over budgetary reporting at the organization's plan is to focus the goals of the controls, or what it needs them to attain: solid monetary explanations that are arranged as per proper accounting rules....
4 Pages (1000 words) Case Study

What Is the Function of the National Archives of Australia

This paper "What Is the Function of the National Archives of Australia" presents the NAA which is the one official archive that works for the maintenance of the Commonwealth of Australia.... The archive is making sure that important documents are available for the coming generations of Australia....
9 Pages (2250 words) Case Study

Highway Engineering Project

The paper "Highway Engineering Project" documented all the positions of the cultural, recreational, and historical significance of highway construction.... It also locates and comments on the geometrical, geological, and geotechnical alignment challenges that will be encountered along the construction process....
5 Pages (1250 words) Case Study

Building a New Organizational Website

This case study "Building a New Organizational Website" analyzes the proposed website that would establish a platform on which customers can interact with the personnel in the business.... The interaction enables customers to express their views on the business's provision of products....
8 Pages (2000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us