Work Breakdown Structure - Assignment Example

Cite this document
Summary
From the paper "Work Breakdown Structure" it is clear that it is important to highlight that a work breakdown structure dictates the roles and responsibilities that each member in a given task is supposed to do and accomplish within a stated period of time…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER93.5% of users find it useful
Work Breakdown Structure
Read Text Preview

Extract of sample "Work Breakdown Structure"

Below is a Work Breakdown Structure (WBS) of a project I undertook to organize for a system adoption by a community bank so as to make their records automated.

Example WBS: Project Name – Upgrade of automated system in a community bank

LEVEL 1.0 Project Management and quality control.

1.1 Conduct meetings and reviews with management.

1.1.1 Budget on travel and accommodation for the contractor and their consultancy fees.

1.1.2 Contingency plans.
Skills required include management skills.
LEVEL 1.2 Hardware and Software acquisition.
1.2.1 Prepare specifications of the Hardware and Software needed.
1.2.2 Conduct Demos of software needed and site visits to verify specifications.
1.2.3 Hardware and Software purchase
Resources needed here include the Hardware and Software specifications document to be used to showcase what exactly the supplies needed to perform the upgrade. Skills required include Information technology skills.

LEVEL 1.3 Hardware and software installation
1.3.1 Prepare the site for installation of the network, Hardware and Software purchased.
1.3.2 Conduct acceptance tests of Software purchased.
Resources needed include the Hardware and Software equipment itself. Skills required include Information technology skills.
LEVEL 1.4 Application cutover
1.4.1 Prepare application migration and data backup
1.4.2 Prepare system test plan
1.4.3 Conduct system cutover and test plan.
Resources needed include the test plan and the cutover stages document to explain each phase of the upgrade. Skills required include Information technology skills.
Level 1.5 Customer support

1.5.1 Conduct training and acceptance criteria.
1.5.2 Revise on methodology to solve issues undergone.
Resources needed include the use of training manuals about the system. Skills required include Information technology skills.
Level one would need a contingency plan. A contingency plan is used when the business or organization wants to reduce the risks that may be incurred with the outcome of a new venture or new events than usual and also a contingency plan is used for the purpose of preparing for quantifiable crises.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“611 Assignment 3 Example | Topics and Well Written Essays - 500 words”, n.d.)
611 Assignment 3 Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/business/1617043-611-assignment-3
(611 Assignment 3 Example | Topics and Well Written Essays - 500 Words)
611 Assignment 3 Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/business/1617043-611-assignment-3.
“611 Assignment 3 Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/business/1617043-611-assignment-3.
  • Cited: 0 times

CHECK THESE SAMPLES OF Work Breakdown Structure

Rock N Reggae - Work Breakdown Structure

From the paper "Rock N Reggae - Work Breakdown Structure" it is clear that the potential threats and uncertainties associated with staging the Rock 'n' Reggae concert can be many such as securities breach, fire and riots as it is a public event and these hazards are always associated where a huge crowd.... The rate and rhythm of the work is determined by time as illustrated in Figure 1.... As illustrated in Figure 3, the aim for continuous improvement, creativity in the work, understanding and practising ethics, unity of work through integration amongst all the sections and thinking strategically are fundamental values for the management of the event....
6 Pages (1500 words) Case Study

A Work Breakdown Structure as Aspect in Management of Projects

The paper "A Work Breakdown Structure as Aspect in Management of Projects" presents an example of WBS for the provision of services in maintenance, repair, and rebuilding of equipment for the federal government, and the best approach to creating a comprehensive Work Breakdown Structure.... Finally, assuming that cost summary are adequately substantiated, failure to accurately define what work is or not included in the task descriptions, referencing to inexistence paragraphs, classifying materials as commercial off-the-shelf (COTS) or a non-development item (NDI) when extensive modifications are required and not providing negotiated rates and trace between calendar years and the rates used in the proposals are also some of the mistakes normally associated with bid proposals....
8 Pages (2000 words) Assignment

Work Breakdown Structure - Microsoft Project

Generally, from the paper "Work Breakdown Structure - Microsoft Project " it is clear that Project Libre is one of the most downloaded project management software, particularly in the United States.... Work Breakdown Structure (WBS) is one of the most renowned tools of Project Management.... Work Breakdown Structure allows the project to be divided into smaller tasks and by completing each of these tasks the project can be handled in a better way (Hamilton, 2004)....
5 Pages (1250 words) Essay

Riorden Manufacturing Work Breakdown Structure (WBS)

o cope with the competition, upgrading computers operating system to XP profession it will make it compatible with most drivers of Riorden manufacturing Work Breakdown Structure Riorden manufacturing Work Breakdown Structure Step Determination of deliverablesTo upgrade its network operating system from windows NT4.... A face-lift by the internet at the San Jose headquarters will enable office work to be easy and simplified in data.... A face-lift by the internet at the San Jose headquarters will enable office work to be easy and simplified in data manipulation....
1 Pages (250 words) Essay

Estimation Techniques - Work Breakdown Structure

This paper under the headline "Estimation Techniques - Work Breakdown Structure" focuses on the fact that Work Breakdown Structure is used in planning effectively for a project by breaking down the key tasks or activities into smaller manageable units of work.... Advantages of the Work Breakdown Structure are as follows: they can be used to effectively control projects while showing greater accountabilities.... Work Breakdown Structure It is used in planning effectively for a project by breaking down the key tasks or activities into smaller manageable units of work....
1 Pages (250 words) Essay

Detailed Work Breakdown Structure

As a document that outlines the specific ways of implementing the suggested ambition of the company, there are areas that address issues of the justification of the project, deliverables needed to accomplish the project, scope of the project, stakeholders to implement the project, specific objectives to be achieved, key assumptions and above all scope with Work Breakdown Structure.... In the Work Breakdown Structure all that the project encompasses is shown.... The Work Breakdown Structure is going to be really useful as “the Project Manager and project team use the Work Breakdown Structure to develop the project schedule, resource requirements and costs” (Project Management Documents, 2012). ...
2 Pages (500 words) Essay

Manage Your Health Inc - Work Breakdown Structure

This paper "Manage Your Health Inc - Work Breakdown Structure" focuses on the international company that specializes in the provision of various health services in the world.... The company has come up with various projects of updating its strategic plan with the intention of reducing costs....
19 Pages (4750 words) Case Study

Work Breakdown Structure for the Construction of the Bridge Abutment

This report "Work Breakdown Structure for the Construction of the Bridge Abutment" focuses on a retaining structure normally designed and put up at the edge of a bride to act as support.... However, constructing a standard abutment structure is very costly and thus adequate measures need to be in place to manage the entire construction phase....