Real Project Planning: Developing a Project Delivery Strategy - Report Example

Cite this document
Summary
This report "Real Project Planning: Developing a Project Delivery Strategy" presents the safety measures, quality achievability, price among other aspects that are substantially achieved above average. This means that the anticipated design and production processes were preliminarily achieved…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94.6% of users find it useful

Extract of sample "Real Project Planning: Developing a Project Delivery Strategy"

Project Work Name Institution Project Work Introduction The idea of developing projects sums up the preliminary idea development before achieving the final target. It is worth noting to categorize the project basing on the costs, material and the need of the final project. The essential significance of outlining the important aspects of the entire project helps in evaluating the performance of the primary product. However, before developing any project, it is important to deduce the pragmatic source of the project, through a clear outline of the basis of the project accompanied with the substantial objectives. In this case, the pragmatic modification of the Mobile Tyre Wheel Lift & Wheel Dolly into the hydraulic lift foot pump forms the foundation of the project under consideration Miller, R., Miller, M. R., & (Stewart, 2004). The client The client Mr. Robinson Humphrey requested for a cheaper modified hydraulic lift foot pump that could serve the ultimate purpose of lifting heavy machines in small premises. The absolute purpose for the request revolved around the entire of simplified simple machines that can be affordable by the local garage and other interested parties. Mr. Robinson, being the chairman of the small enterprise association in the local village, foresaw the benefit of improvising simple machines that can be of benefit in such enterprises like the garages. However, the product itself is quite fascinating and more task oriented as compared to other simple machines. The idea of reducing the primary expenses suggest the cheaper price of the machine thereby saving the extra money that can serve other purposes. In addition, the future of the product does not focus on benefiting the small enterprise association alone but rather the whole community, which is engaged to economic activities that can generate income in various capacities. Constraint The total weight of the final product should not exceed 11 kilograms. The final product value should go beyond $450.00. The base case housing the lift pump wheels and the object sink should not exceed 500cm x 350cm x 200cm. The product must be captivating and affordable. Safety measures should be observed by the user before and during the use. Limitations should be observed on the weight of the machine of component to be lifted by the lift pump. Considerations When the machine is not in use, it is advisable to keep it in the right position with the pedal slackened. Solid rubber can be used if necessary and cost equivalent. Interferences with the hydraulic can subject the machine to temporary destruction thereby demanding the ultimate need for maintenance. Profile of End User Job specification in machinery and maintenance. Interested parties that wish to make work easier at workplaces. Persons handling heavy jobs and lifting. Areas of Research Availability of substitute products in the market accompanied with their total costs. Accessibility of the materials and the strength of metal to be used. The costs of producing a similar copy of the product accompanied with limitations attached to the patent practices. The absolute feasibility study and case research on the number of units availed in the market for the consumers. Specifications Significantly, the focus of developing the project entails prioritizing the interest of the customer, which revolves around quality and utility satisfaction during the absolute use. However, most interesting is the weight of the whole machine that demands achieving the utmost mobility (Bitsch & Pedersen, 2008). This is accompanied with fixation of the wheels, which affects the mobility of the machine from one area to another. Less attention is paid to the color of the casing, the weight limits and the age of the user. Furthermore, the nature of the load to be lifted by the lift pump is a minor factor to be considered in this case. Specific Quality The outdated product design is not significantly incorporated into the design of the final product. Robinson requested that the finished product should withstand seven consecutive years of continuous use in the small enterprise business, especially the garage sector, before approaching the commencement of the product depreciation. In addition, the materials used, metals, should meet the required strength and a required postulated durability basing on the corresponding prices. It is evident that the considerations of the product qualities are primary and should be incorporated into the design and the final product manufacturing. Research Features It is totally pneumatic operation. This lift is convenient to put up and down or move on this lift. The Max. lifting height :1060mm The max. lifting capacity :65kg The total price is $340 Technical Details Air pressure 6-8kg/cm Apply to tire 65kg N.W.(kg) 78.5kg G.W(kg) 83.5kg Mobile Tyre Wheel Lift Best Features It is totally pneumatic operation. This lift is convenient to put up and down or move on this lift. The total price of the mobile tyre wheel lift is approximated to be $200 The Max. lifting height : 830mm The max. lifting capacity :65kg Technical Details Air pressure 8-10kg/cm Apply to tire 65kg N.W.(kg) 72.5kg G.W(kg) 77.5kg The sample advanced four wheel foot pump available in the market. It is significantly utilized in lifting loads by foot pumping as a deployed mechanism. The tyres are solid and rotate through 360 degrees to achieve any dimensional but required movement. The simple machine is valued at $300 in the hardware shop outlets. https://www.google.com/search?q=hydraulic+lift+foot+pump&client=firefox-a&hs The above diagram indicates Wheel assembling process to achieve multi-dimensional movement of the lift pump. The assembling takes care of the tyres and the materials used in making the tyres. The threading is purposefully meant to achieve a certain quantified level of friction depending on the nature of the floor. The tyres sold in a group of four, claims a total cost of $110 accompanied with a discount of 5%. https://www.google.com/search?q=two+wheel+balanced+hydraulic+pump&client=firefox- These are hydraulic hand pumps that can be modified into foot pumps by extending the handle or improvising a peddle to pump the liquid inside the hydraulic pump. The whole component is normally mounted on a stand with major focus on the pumping mechanism and position. The hydraulic hand pumps are currently valued at $50 each in the outlet hardware shops. https://www.google.com/search?q=steel+materials+used+in+hydraulic+foot+pumps&client Ratings Criteria Importance Rating Reason for rating Will the final product be safe to the machine handlers and mechanics Important 8/100 This is one of the significant aspects that is considered to inculcate confidence of the users on the efficiency of the machine. The summed up weight should not exceed 11 kilogram Very important 10/10 This is a factor that focuses on the mobility and stability of the machine during the entire operations or activity. The price of the hydraulic machine that should not exceed $ 340 on the market price scale Important 8/10 The price influences the interest and convenience of the usage of the machine by the consumers. This widens marketability of the machine due to affordable price. The design and assembly process should foster simplicity Very important 9/10 This is an aspect that is observed due to the essence of incorporating available materials and skills that are cheaply available Process design Preferred Option Design option 1 3 3 4 Criteria 1: does the design feature the constraints such as efficiency, 8 8 7 6 Criteria 2: do the structure meet applicability and safety considerations 6 7 8 8 Criteria 3: does the design achieve the primary objectives in the finished product 7 8 6 9 Criteria 4: will the design meet the cost parameters by enhancing cost efficiency 7 8 7 7 Total 29 36 31 34 Through an amicable conversation and discussion with the client Mr. Robinson, it was concluded that the design is the most preferred option. However, Robinson was fully satisfied with the complying criteria that can meet the interest of a potential client or clients depending on the number of parties (Melton, 2008). He further appreciated the design of the wheels that achieved an all angle rotation thereby moving in any possible direction. This, he commented, improves the mobility of the simple machines in the immediate industry available. The efficiency of the machine lies under the applied force by the foot thereby achieving the absolute goal of lifting heavy loads by applying relative a small force. Material and cost list Part Number of items per unit Size Material Supplier ptg ltd Unit cost $ Total cost Metal bars Eight 3m long Steel Regal fabricators 24 112 Tyres Four 10cm diameter Solid rubber Shop outlets 27.5 110 Hydraulic pump One - Oil Fabia-rupper machines ltd 200 200 Sheets Four 3x2 Zinc Outlet hardware shops 35 140 Planned sequence of operation and assembly Step Process and materials Tools, machinery and equipment OH& issues & PPE TIME IN HOURS 1 Metal bars and metal cutting Grinder and welding machine Overall, glasses 2 hours 2 Primary joining of the frame Spanners and welding machine Glasses 3 hours 3 Alignment of the sheets on the frame Screws, screw drivers and drillers Overall, electric boots, electric shocks 2 hours 4 The pump fixation Screws, screw drivers Physical injury, safety boots 1 hour Timeline for design and production Week 1 2 3 4 5 6 7 8 9 Design Of The Brief Constraint X Deducing And Researching For Ideas X X Deciding On Design Option Of The Final Product X X X Preferred Option Selection From Alternatives X X X Final Production X X Overall Evaluation Report The evaluation process focuses on the testing aspects that deduce the quality and effectiveness of both the design and the final product. Responding to the criteria, the testing process focused on the safety, weight as well as the ease of assembling various components. Other testable features include the testable durability and stability placing into consideration, the nature of the work performed in the field (Gudda, 2011). The further focus on the characteristic ideal product fell within the specification brackets that foster and prioritize the customer interests. This called for the highest degree of perfectionism in design and the final production. The evaluation rated different qualities and the results are presented in the graph below. Reflections The results presented in the graph above settles on satisfying evidence that speaks out the effectiveness of the design and production process. The safety measures, quality achievability, price among other aspects are substantially achieved above average. This means that the anticipated design and production processes were preliminarily achieved. In addition, the failure to achieve 100% perfection is due to the complicated challenges that rose in the process. However, this never hindered achieving the final goal. It is recommendable to use the above produced hydraulic lift foot pump due to its effectiveness as further modifications are being worked on. References Miller, R., Miller, M. R., & Stewart, H. L. (2004). Pumps and hydraulics. Indianapolis, Ind: Wiley Pub. Bitsch, O. P., & Pedersen, K. (2008). Problem-oriented project work: A workbook. Frederiksberg: Roskilde University Press. Melton, T. (2008). Real project planning: Developing a project delivery strategy. Amsterdam: Butterworth-Heinemann. Gudda, P. (2011). A guide to project monitoring & evaluation. Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Real Project Planning: Developing a Project Delivery Strategy Report, n.d.)
Real Project Planning: Developing a Project Delivery Strategy Report. https://studentshare.org/technology/2052602-project-work
(Real Project Planning: Developing a Project Delivery Strategy Report)
Real Project Planning: Developing a Project Delivery Strategy Report. https://studentshare.org/technology/2052602-project-work.
“Real Project Planning: Developing a Project Delivery Strategy Report”. https://studentshare.org/technology/2052602-project-work.
  • Cited: 0 times

CHECK THESE SAMPLES OF Real Project Planning: Developing a Project Delivery Strategy

Strategic mgt. process applied to project managemt

Kaplan and Norton argued that modern business is already blessed with the so-called building blocks towards effective strategy formulation and execution, as well as, the necessary tools to ensure operational efficacy.... The Execution Premium Process or XPP is a comprehensive and integrated management system which combines strategy formulation, planning, and operational execution (Kaplan and Norton, 2008).... XPP is comprised of six stages: (1) strategy development; (2) strategy planning; (3) organization alignment; (4) operations planning; (5) monitoring and learning; and (6) strategy testing and adaptation....
12 Pages (3000 words) Dissertation

How service delivery can be improved through better project management

points out, communication skill and good customer relationship are the basic qualities that a project manager must possess.... How service delivery can be improved through better project management?... Since customers get the opportunity to choose from different marketers' products, in addition to product quality they give emphasis on the efficacy of service delivery.... Service delivery system has a considerable significance in South Africa....
5 Pages (1250 words) Case Study

Implementation of the Electronic Government

While, it must be ensured that these projects are aligned with Digital Oman strategy and ITA Policy through close supervision of these projects.... The E-Government initiative is an integral part of ITA's approved ITA Policy and Digital Oman strategy.... The objectives of the E-Government Program are laid down: Increase Efficiency and Effectiveness of the Government Increase Transparency and Accountability in decision making Enhance delivery of public services to Citizens efficiently and effectively In order to achieve these objectives, this IT project has been envisaged and would be executed....
19 Pages (4750 words) Coursework

Front Line Innovations, Inc

The primary business of FLII is developing a loyalty program system integrator to enable the smart card to work with a retailer's POS or any other tracking system.... Investments in additional capital expenditures and manpower are put up by the shareholders as required on a per project basis....
17 Pages (4250 words) Essay

Company Overview

Daryl Scholz is a project management coordinator that utilizes project management methodologies to plan, implement, and evaluate projects related to technology for the Information Technology Services department.... While working on the project Mnscu was developing a similar portal at the state scale that could conflit with scsu student portal.... It proved to be effective because this project was based on developing a “one stop shop” as directly related to each student, and so, it required adaptive planning, evolutionary development and delivery, and encourages rapid and flexible response to change....
7 Pages (1750 words) Essay

Value of a Project Management Office in a Company

Project Management is a planned and organized effort to accomplish a specific time-bound objective, which includes developing a project plan, defining and confirming project goals.... The dissertation “Value of a project Management Office in a Company “ investigates evaluation criteria for PMO in a company.... nbsp;… Managing a project within an organization without a PMO is now being realized as a real overhead in terms of workload....
45 Pages (11250 words) Dissertation

Wembley Stadium: Project Management Principles, Establishment and Measurement of Success and Failure

In every project including the construction of Wembley Stadium, there are four important phases in which a project should follow.... Sources of the factors that are considered at this stage include a project plan that incorporates work breakdown structure, the resource plan, financial plan, quality plan, risk plan, acceptance plan, and communication plan.... Some of the activities that can be accomplished by a project manager include setting monitoring and control deliverables that include time management, cost management, quality management, risk management, and acceptance management....
7 Pages (1750 words) Assignment

Sustainability of Methodologies for the Development of a Fixit TV and Video

Various categories will cover for every methodology; the scope of the information systems development lifecycle, iterative and incremental development, identification of roles and responsibilities for each activity and stage, user/stakeholder participation, project control and planning, the use of project client's information resource, logical and physical models and early delivery of products.... The management enables an effective allocation depending on the project's risks and priorities and it dynamically handles the work on the changes within iterations....
37 Pages (9250 words) Report