StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Report - Statistics Project Example

Cite this document
Summary
As shown in figure 1, there appears a positive linear relationship between sales per square metre and number of full-timers. The value of the correlation coefficient between sales per square…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.2% of users find it useful
Project report
Read Text Preview

Extract of sample "Report"

Download file to see previous pages

The value of the correlation coefficient between sales per square metre and number of part-timers is about 0.0501. This suggests a very weak (or negligible) positive linear relationship between sales per square metre and number of part-timers. As shown in figure 3, there appears a positive linear relationship between sales per square metre and total number of hours worked. The value of the correlation coefficient between sales per square metre and total number of hours worked is about 0.2630. This suggests a weak positive linear relationship between sales per square metre and total number of hours worked.

Figure 4 shows the scatterplot between sales per square metre and sales floor space of the store. As shown in figure 4, there appears a negative linear relationship between sales per square metre and sales floor space of the store. The value of the correlation coefficient between sales per square metre and sales floor space of the store is about -0.2938. This suggests a weak negative linear relationship between sales per square metre and sales floor space of the store. Since, the value of the test statistic, t = 4.

871 is greater than 1.966, we reject the null hypothesis, H0 and conclude that there is a significant relationship between sales and number of full-timers. Since, the value of the test statistic, t = 1.000 is in-between 1.966 and -1.966 (non-rejection region), we do not reject the null hypothesis, H0 and conclude that there is no significant relationship between sales and number of part-timers. Since, the value of the test statistic, t = 5.438 is greater than 1.966, we reject the null hypothesis, H0 and conclude that there is a significant relationship between sales and total number of hours worked.

Since, the value of the test statistic, t = -6.132 is less than -1.966, we reject the null hypothesis, H0 and conclude that there is a significant

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project report Statistics Example | Topics and Well Written Essays - 1500 words”, n.d.)
Retrieved from https://studentshare.org/statistics/1686328-project-report
(Project Report Statistics Example | Topics and Well Written Essays - 1500 Words)
https://studentshare.org/statistics/1686328-project-report.
“Project Report Statistics Example | Topics and Well Written Essays - 1500 Words”, n.d. https://studentshare.org/statistics/1686328-project-report.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project report

Network Administration Capstone Project

Ths report "Network Administration Capstone Project" analyzes the components and features of the software in relation to the demands of the department.... The result of the component and system analysis is what has been presented in this capstone project....  Like all other forms of major institutional projects, the usage of the present project, which was the internalization of software, was taken through a number of development levels.... At the search level, developers were tasked and at the same time offered the opportunity to undertake comprehensive research and feasibility study about the intended project....
22 Pages (5500 words) Report

Wild Salmon Extinction Linked to Farmed Salmons

Wild salmon extinction linked to farmed salmons Abstract Farmed salmons have been suspected in some studies to be the reason for extinction of wild salmons in the lake.... In some arguments, this is rightly so as reports show valid arguments to back up this statement.... hellip; However, this paper believes otherwise and presents evidences that rejects the assumptions, and say that farmed salmons should not be linked to the extinction of wild salmon....
11 Pages (2750 words) Book Report/Review

Hardware Replacement Project

This report "Hardware Replacement Project" discusses proper customer relationship management (CRM).... They also guide on how to direct activities, report project progress, control project execution and analyzing project results.... The five key variables of project management namely scope, time, cost, quality, and risk apply to this scenario in that their proper analysis can guide the management of this project on organizing and accomplishing the work....
7 Pages (1750 words) Report

IT Project Management Approaches

This report "IT Project Management Approaches" discusses Project management approaches depend on the type of project and the expected outcomes of the project.... The two approaches discussed above present both positive and negative aspects of project management.... hellip; The agile approach is composed of many rapid iterative planning and development cycles that allow a project team to constantly assess the evolving product and obtain instantaneous feedback from customers and stakeholders....
7 Pages (1750 words) Report

Project Management Tools

This report "Project Management Tools" discusses the different project management tools that may be used for the upgrading of 400 computers in 30 locations, from Windows XP to Windows 7.... The purpose of this report is to examine the project management tools that may be used to provide a systematic means of addressing the project's planning and implementation.... An overview of traditional as well as non-traditional project management tools had been conducted....
12 Pages (3000 words) Report

Design Projects for the CQUniversity UniStart Project 2012

Introduction This report outlines the effects of the three design projects attached: brochure, calendar, logo and a poster flyer for CQUniversity in connection with the 2012 CQUniversity UniStart Project.... (p88) This is true both for this designer and for the intended readers of this report.... DESIGN BRIEF: CQUniversity UniStart project 2012 I.... The first explains the background of the projects, which is primarily about the UniStart project event....
6 Pages (1500 words) Book Report/Review

Applied Software Project Management

This report "Applied Software Project Management" presents the design and implementation of an upgrade of the current Information System.... hellip; This project is aimed at providing the company with an advanced Information Technology Infrastructure that will leverage the data collected in Web analytics to promote the company's essential marketing plans.... The project is designed and built to re-engineer the current system used in the company....
5 Pages (1250 words) Report

Carbon Emission as a Global Problem

This paper ''Carbon Emission as a Global Problem'' tells that it has caused great concern due to increased global warming resulting.... Global warming refers to increased temperature levels near the earth's surface caused by trapping and the build-up of heat in the atmosphere (Paterson 2003)....
12 Pages (3000 words) Report
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us