StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

The Millennium Bridge and Its Construction - Essay Example

Cite this document
Summary
The paper "The Millennium Bridge and Its Construction" describes that to solve the problem, the engineers decided to install a damping mechanism. The mechanism is similar to giant shock absorbers that have limitations in the bridge’s response to external forces. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96.2% of users find it useful
The Millennium Bridge and Its Construction
Read Text Preview

Extract of sample "The Millennium Bridge and Its Construction"

The Millennium Bridge is located in London, exactly linked to St.Paul`s Cathedral with the Tate Modern Gallery. It was opened to the public on 10 June 2000. This bridge was designed by Norman Foster and was considered to be a passing solution for 80,000 to 100,000 people. Unfortunately, after only two days of its opening, the Millennium Bridge had to be closed from the function on 12 June 2000. The problem was a degree of movement in which sideways movements occurred when a large amount of people were crossing. Analyzing the particular problems, this report identifies what happened when there were movements on the Millennium Bridge.

The phenomenon that happened in the Millennium Bridge was rather serious.

In a view, the phenomenon was like a swaying bridge as a fairground ride.

As it had been observed, the movements that occurred on the Millennium Bridge were caused by Synchronous Lateral Excitation. In this case, small sideways oscillations happened because of the natural sway motion of people walking; it in turn caused people who passed the bridge to sway in step, which made the amplitude of the bridge oscillations increase and reinforced the effect continuously. When it occurred, the worst movement was on the central span where the deck moved by up to 70mm. What a dramatic swaying that had made people who passed shocked.

The solutions that had been done to analyze the phenomenon were mostly used tests. Crowd tests were implemented on the bridge deck. In July 2000, 100 people were used in the first test. The purpose of the first test was to devise a load model for the dynamic forces created by people when they were walking. To apply this, the bridge was equipped to measure movements, and a proportion of the crowd was fitted with heel sensors to measure the precise timing of their steps. Following the first test, December 2000 was chosen to be the second time to implement a test. The second test involved 275 people who were used to load test a prototype installation of the proposed solution in reducing the movement of the bridge. Moreover, as it was observed, there are two fundamental ways to limit dynamic excitation; they are to stiffen the structure so the frequency of the bridge and our footsteps no longer match, and add damping to absorb the energy.

All around the world, dampers can be used in bridges and buildings, particularly in areas prone to earthquakes. Furthermore, dampers have another benefit in that most of them could be beneath or within the structure. Therefore, it can be hidden from public view.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Saleh's english Essay Example | Topics and Well Written Essays - 500 words”, n.d.)
Retrieved from https://studentshare.org/other/1422450-saleh-s-english
(Saleh'S English Essay Example | Topics and Well Written Essays - 500 Words)
https://studentshare.org/other/1422450-saleh-s-english.
“Saleh'S English Essay Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/other/1422450-saleh-s-english.
  • Cited: 0 times

CHECK THESE SAMPLES OF The Millennium Bridge and Its Construction

The London Millennium Footbridge Description

The structure of the millennium bridge is innovative and complex but it has been designed to achieve an apparent simple form.... The design of the millennium bridge is based on the following considerations: An evolved support system in which the majority of the bridge stiffness is created by shallow cable profile derived tension.... The complexity of the cable design is caused by the multiple spans of the bridge which makes the millennium bridge slightly different from a typical ribbon bridge....
5 Pages (1250 words) Essay

Bridges Appearance Preservation

The paper "Bridge's Appearance Preservation" discusses the millennium bridge that links St.... he phenomenon of bridge sideways movement is not unique to the millennium bridge only.... However, to prevent any possible physical injuries of the pedestrians as well as for case investigation purposes the millennium bridge was closed on June 12, 2000.... The paper discusses the reasons for the unprecedented and unexpected lateral movement of the bridge and practical solutions implemented to prevent the problem from occurring in the future....
2 Pages (500 words) Essay

The Millennium Bridge

This paper ''the millennium bridge'' tells us that it was opened in June 2000 as a link between Bankside and London.... This bridge was nicknamed by Londoners as the 'wobbly bridge', as they first noticed its unusual swaying during a charity walk across it shortly after it was built.... Their solution of the installation of dampers was successful, as the bridge is easily crossed en masse without making its users seasick.... This report identifies the problems of this bridge's building structure with an explanation of why the bridge swayed as it did with foot traffic....
1 Pages (250 words) Essay

The Millennium Bridge in the UK

The paper "the millennium bridge in the UK" states that the Best design was chosen amongst the various entries from all over the world.... The United Kingdom or UK also saw various projects; the most prominent ones being the Millennium Dome and the millennium bridge.... the millennium bridge was built from the point of view of ushering in a new era into the London cityscape with the bridge's unique design and engineering precision and which would eventually act as a prominent structure for London and UK leading to an increased status all over the world....
4 Pages (1000 words) Essay

Londons Millennium Bridge

A short analysis of the costs, benefits and risks associated with the project will follow and we will conclude with a broad overview of the issues studied with respect to one of the most controversial construction projects in London in recent memory, the building of the millennium bridge (Architects, 2000; Steves, 2006).... It subsequently was nicknamed the Wobbly bridge and was closed for two years following this unexpected occurrence.... Seeking to understand the development of London's millennium bridge, this research paper will provide a brief description of the history and development of London's millennium bridge....
10 Pages (2500 words) Case Study

Londons Millennium Bridge

A short analysis of the costs, benefits and risks associated with the project will follow and we will conclude with a broad overview of the issues studied with respect to one of the most controversial construction projects in London in recent memory, the building of the millennium bridge (Architects, 2000; Steves, 2006). ... As with all bridge structures, the millennium bridge is subject to a degree of movement.... Accordingly, the millennium bridge remains mired in controversy, largely due to its unfortunate introduction back at the dawn of a new millennium (Hollnagel, 2004)....
5 Pages (1250 words) Essay

London Millennium Footbridge

he structure of the millennium bridge is innovative and complex but it has been designed to achieve an apparent simple form.... he design of the millennium bridge is based on the following considerations: ... The complexity of the cable design is caused by the multiple spans of the bridge which makes the millennium bridge slightly different from a typical ribbon bridge.... the millennium bridge is different from the ordinary suspension bridge in many ways as it has the same structural system to resist the lateral wind loads and the normal dead and live loads....
6 Pages (1500 words) Essay

The Negative Reputation of the Constructors of the London Millennium Bridge

the millennium bridge in London was one of these projects. ... his history of the millennium bridge dates to 1996, when the Financial Times, together with the London Borough of Southwark and the Royal Institute of British Architects, held a competition (ARUP, Vision).... Over two hundred people were involved in the background research, testing, and construction of the millennium bridge.... To obtain more specific information about the influence and pressure exerted by walking pedestrians on the millennium bridge, ARUP paid volunteers to walk over the Bridge, so the exact results could be recorded and used in the remedy efforts....
14 Pages (3500 words) Research Paper
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us