Masters Level - Project Management in Construction - Essay Example

Comments (1) Cite this document
Summary
Inclement weather combined with reduced navigability made the English Channel the least preferred of options to connect to Great Britain. However, in context of the Second World…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER92.1% of users find it useful
Masters Level - Project Management in Construction
Read TextPreview

Extract of sample "Masters Level - Project Management in Construction"

Download file to see previous pages However, these ideas remained a distant reality given the technological challenges posed by such a project. Nonetheless speculation thrived on the issue especially throughout the sixties and the seventies.
It became clear that the only viable method of bridging up Great Britain to mainland Europe was a tunnel under the sea. The idea seemed simple at first. The project required the boring of three distinct tunnels from one side of the English Channel to the other. Tunnelling or more specifically boring had been carried out extensively even before the Channel Tunnel project so technical expertise was available on the issue. One thing that was noticeable about the Channel Tunnel project upfront was the fact that boring had never been taken up on such a massive scale before this project.
While the Channel Tunnel project can be seen as a major achievement in terms of technical progress, by any other measure, it has been seen as a pure project management failure. There is little doubt in anyone’s mind that the Channel Tunnel project was less than a Pyrrhic victory. The initial costing for the project was estimated at some £3.5 billion but the eventual execution cost the project team some £9 billion. There was little change in the overall scope of the project but there were myriad changes in the details of the project scope. It was decided initially that the Channel Tunnel would consist of a 32 mile (51.5 kilometres) tunnel under the sea to serve two railway links separately. These two main railway tracks under the sea would be supported by a smaller tunnel in the middle of these tunnels to service shuttle trains carrying vehicles. Once construction commenced, it became apparent that air conditioning was more of a necessity than an auxiliary for the project. One of the more troubling aspects of the Channel Tunnel project was the involvement of the governmental machinery ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Masters Level - Project Management in Construction Essay”, n.d.)
Masters Level - Project Management in Construction Essay. Retrieved from https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction
(Masters Level - Project Management in Construction Essay)
Masters Level - Project Management in Construction Essay. https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction.
“Masters Level - Project Management in Construction Essay”, n.d. https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction.
  • Cited: 0 times
Comments (1)
Click to create a comment or rate a document
ok
oklein added comment 8 months ago
Student rated this paper as
I didn’t know how to start my text. "Masters Level - Project Management in Construction" helped me out a lot! Especially the list of ideas was valuable.

CHECK THESE SAMPLES OF Masters Level - Project Management in Construction

Managing Construction Project Management

...written in the project schedule (Horman & Thomas, 2005; OBrien & Fischer, 2000). For this reason, Horman & Thomas (2005) revealed that it is important to maintain a certain level of raw material inventory since this strategy will enable the lead construction manager effectively and more efficiently manage the daily production process. When buffering the raw material stockpile, the lead construction manager should keep the available inventory level limited to the volume of raw material required for the building construction since purchasing construction materials more...
12 Pages(3000 words)Essay

Construction Management

...by the construction industry at large is still difficult to quantify and in some quarters, there is some dubiety about its diffusion in the construction industry” (2013, p. 99). Australia falls after the United States as it has also relatively adopted partnering and run competitions on satisfactory instances of partnered projects through the Masters Building Association. McGeorge and Zou define partnering as “a process for improving relationships among those involved on a construction project to the benefit of all” (2013, p. 100). The philosophy is being applied as a management tool in the construction...
8 Pages(2000 words)Essay

Construction Project Management

...? International projects. An analysis of about six construction projects which take place in two countries. Research International projects. An analysis of about six construction projects which take place in two countries. Synopsis Even though principles of project management are the same in all nations throughout the world, certain aspects, which may be specific to the nations, may affect projects in different nations differently. Other than the typical constrains of project management such as time, cost and scope, certain aspects such as national...
6 Pages(1500 words)Essay

Masters Level Social Worker

...GRADUATE ADMISSION ESSAY- MASTER IN SOCIAL WORK What is your motivation for becoming a Master’s level social worker? I am a social worker. However, what is a social worker? As it has been defined, “Professional social workers are concerned with social problems, their causes, their solutions and their human impacts. Social workers work with individuals, families, groups, organizations and communities, as members of a profession which is committed to social justice and human rights.” (Reichert, 2003). (Please note this reference came from Wikipedia, please check the link http://en.wikipedia.org/wiki/Social_work as I have cited on the reference page. From this definition, we can deduce...
7 Pages(1750 words)Personal Statement

Masters Level Education for Nurses

...a Masters degree in Health Care Administration because her thought was that she might be able to affect change through management and hospital administration. She became frustrated however, because it did not allow the time for the research that was necessary to affect change. Jean went on to get a second Masters degree in Education and eventually a PhD in Nursing Education. Jean, in a sense, picked became a mentor for this writer. The qualities that she possessed were and are the qualities this writer hopethis writer hopes to possess. She was wise in her passion for nursing. She understood that there were things that affected every nurse in such a way that they might make the wrong...
5 Pages(1250 words)Essay

Project Management for construction

...Construction Management I. Introduction The construction business involves precision in terms of technology and human factors. Its is a given fact that good project management in construction must adhere to means and methods to efficiently use labour, materials and equipment. Of the three factors mentioned, labour productivity plays a vital role and must be given close and continual attention by those responsible for enforcing cost and quality control of constructed facilities. As in all labour intensive business, human resource management often presents formidable challenges to managers. Unlike technologies or equipments, management has to deal with personalities, labour regulations, health and safety. Failure of the management... the...
8 Pages(2000 words)Essay

Case Study Analysis - Masters level (management/Psychology)

...Innostat’s problem and clearly define it; the next step will be to determine the various decision criteria available to Stephanie, analyze the identified decision criteria, various courses of action available to Stephanie will be generated using the analysis carried out, these courses of action will be appraised and finally this analysis will determine the most optimal course of action available to Stephanie Fortas to turn around the fortunes of Innostat. As enumerated by Mintzberg (1975) Stephanie will have to perform many different roles as the CEO of Innostat. The social cognitive theory and the TRD model as outlined by Bandura (1977, 1986, and 1987) will be useful theoretical constructs to analyze the given...
5 Pages(1250 words)Essay

Construction Project Management

...2.0 Executive Summary The recent global economic crisis virtually affected various facets of business in the United Kingdom and the world at large and the construction industry was also not spared. This prompted organisations to review their business strategies by virtue of looking at the possibility of entering new markets. As such, this study seeks to outline and justify the feasibility of harnessing on the opportunities to expand into Russias growing overseas market by Natural Power Consultants Company. With regards to the energy sector, Russia remains heavily dependent on oil and gas but the government has emphasised a policy shift towards renewable energy. Current projected demand for planned wind...
24 Pages(6000 words)Essay

Construction Project Management

...CONSTRUCTION OF 18 TIMBER HOUSES IN MANCHESTER PART A Stages of construction Stage A: Appraisal and feasibility In this stage, theproject manager and the client will determine the requirements and objectives of the project. These requirements and objectives will help in providing a clear project design that has to be agreed between the stakeholders and the project team. The requirements at this stage include the client, risk management, feasibility documents of the project, appointment of the project manager, making an estimate of costs and approval of capital funding....
10 Pages(2500 words)Essay

Financial Risk (Masters Level)

...function’s system to the historical simulations approach as well as full revaluation based upon data existing in front office systems (common model in most banks). The project was structured trough creation of 4 working groups, which included market data, methodology, IT implementation, and procedure. The prove concept was an earlier pilot used to test the model by the team. To face-lift, the stress testing approach of the bank the team put in place some framework, which defined a broad range of shocks, which influenced economy. For creation of a stress test scenario that is customized, client managers mix as well as match such shocks at various levels of severity through some user...
12 Pages(3000 words)Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Essay on topic Masters Level - Project Management in Construction for FREE!

Contact Us