Project life cycle or life span is defined as "the sequence of phases through which the project will evolve" (Wideman, 2004). The project life cycle matters in design planning and final execution phases. The time cycle is directly associated with the life span of the project so that from the time of design the project till its final phase of full implementation the life cycle will evolve from one phase to the other…
Download full paperFile format: .doc, available for editing
GRAB THE BEST PAPER97% of users find it useful
Project Management #1
Read TextPreview

Extract of sample "Project Management #1"

Download file to see previous pages The origin of Systems Development Life Cycle (SDLC) or modern version of it known as project life cycle can be traced back to the 1960's when project designers and developers initiated a series of steps in projects in order to track down the progress of a project. As early as in 1976 Archibald first wrote a comprehensive text book on project life cycle management (Archibald, 1976). He came closest to the modern sequence of phases given in SDLC. After Archibald a number of other scholars developed the concept of SDLC so that any project including engineering and IT can be represented.
In 1981 Stuckenbruck developed a very formal sequence of phases to represent the project life cycle (Stuckenbruck, 1981). According to Stuckenbruck PLC is essential to adequately represent the various phases of a project from initiation to finish. Stuckenbruck was the first author to discuss budgeting and resource mapping for PLC. According to him there are just four phases in the life cycle of a project. They are Initiation, Growth, Production and Shutdown (Tinnirello, 1999). The figure he drew just represented a unimodal histogram. Writers tend to distinguish between government projects and private projects. However this paper would adopt a general approach avoiding specificities associated with government projects.
The subsequent developments in the PLC literature were focused on modifying the above theoretical and conceptual models. In the process many new features were included though these changes did not substantially alter the original frameworks. Since 1980's a series of new developments took place and these developments went on till the traditional SDLC models were replaced with new ones (Westland, 2007). These new models are not only complex but also highly technical because many IT projects are designed and planned according to these models. Thus this paper would focus attention on three historical phases of SDLC development.
Phase 1
Figure 1: Archibald's Project Life Span

Start The Total Project
Project Termination
The above figure illustrates Archibald's visual representation of the sequence of phases in a project. According to Archibald the initiation phase of the project begins with its start and both the concept and definition continue with this phase. Assuming that the process of conceptualization of the project begins with designing the diverse parameters of the project, then it is possible that the subsequent definition will involve in outline of project outcomes.
Next comes the design phase. Yet again Archibald did not elaborate how best to make use of diverse skills and tools to carry out the design phase of the project successfully. However he laid the foundation for a structural feasibility design framework that encompassed a range of issues such as the social dimension of the project and the corporate governance parameters (PMI, 2004).
The phase of manufacture according to Archibald is identical to execution of a project. For instance there is a possibility that project ...Download file to see next pagesRead More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project Management #1 Essay Example | Topics and Well Written Essays - 3000 words”, n.d.)
Project Management #1 Essay Example | Topics and Well Written Essays - 3000 words. Retrieved from https://studentshare.org/miscellaneous/1530489-project-management-1
(Project Management #1 Essay Example | Topics and Well Written Essays - 3000 Words)
Project Management #1 Essay Example | Topics and Well Written Essays - 3000 Words. https://studentshare.org/miscellaneous/1530489-project-management-1.
“Project Management #1 Essay Example | Topics and Well Written Essays - 3000 Words”, n.d. https://studentshare.org/miscellaneous/1530489-project-management-1.
  • Cited: 0 times
Comments (0)
Click to create a comment or rate a document

CHECK THESE SAMPLES OF Project Management #1

Project Risk Management Paper 1

It is important to clarify here that risks can be both positive and negative. Therefore, we can also define risk management as the act of reducing negative risks while trying to maximize positive risks. The process of risk management involves determining the outcome of the risk and using it to refine the objectives of the project, determining loose ends, and thus, improve the effectiveness and efficiency of the overall project. We can define the process project risk management into several steps, however, organizations usually combine the steps according to ease of use and utility. One of the main objectives of project risk management is to identify the risks with the highest consequences and possibility of occurrence and then de...
5 Pages(1250 words)Essay

Project Management - Module 1: Working with Teams

This is the fundamental premise behind adapting to non-technical challenges in the project management cycle as a good volume of problems stem from interpersonal relationship conflicts, disagreements over project management, or a general inability to mobilize internal and external stakeholder motivations to meet timeline and productivity expectations. No model of technical best practice is going to identify solutions that would be viable in these circumstances due to the dynamics of human behavior and human needs fulfillment. Thus, the manager must take on a leadership role that support autonomy, establishes behavioral role modeling, and encourages others to manage adaptive challenges. The model of adaptive leadership would also t...
3 Pages(750 words)Coursework

Assignment project management: case 1 Robin Hood case 2 Razorfish

...? Topic: Lecturer: Presentation: Robin Hood Case Robin Hood started his organization by mobilizing a group of discontented individuals especially farmers and peasants, who were resented with the way Nottingham sheriff was handling affairs. Every organization has a strategy that it tries to pursue in order to achieve effectiveness. Barnes (22) strategy is defined as “the direction and scope of organization over the long-term, which achieves advantage in a changing environment through its configuration of resources to fulfill stakeholder expectations.” Strategic management thus involves making decisions on strategies that would enable the firm to gain sustained competitive advantage. Strategy can be at the corporate, business unit...
6 Pages(1500 words)Essay

Project Management- MGMT412 - 1304B - 01 unit 1

...?Project Management Inserts His/Her Inserts Grade Inserts 11th December, Analysis In the process of undertaking this project we have to look into the project stakeholders; in this case they are designers, productions managers and staff, inventory managers and staff, sales and marketing departments. All these people are involved in the project and therefore they are considered the main stakeholders. These stakeholders will be involved in design, production, inventory, marketing and sale of the new plastic produced by Winsome Manufacturing Company (Lewis, 2010). The project sponsor in this project should be the company’s Finance manager since he is in charge of the organization’s financial expenditure. The finance manage is in a position...
3 Pages(750 words)Essay

HCM427-0801A-01 Human Resource Management in Health Care-Phase 1 Individual Project

...Human Resource Management in Health Care - Phase Task The technological improvements in health care have created an increased demand to take care of people with any kind of disease. With the increasing number of people coming for checkups and treatment for even the minutest problems, the staff at the hospital/clinic falls short to cater all the patients. With the higher paying hospitals/medical care facilities employing most of the medical professionals, the lesser successful hospitals are left in need of more staff. Jones Pediatric Services wants to expand its business, however with the current shortages in medical profession it will be extremely difficult to get hire skilled and good quality of employees. The medical care facilities...
2 Pages(500 words)Essay

HCM387-0802A-01 Management Principles in Health Care - Phase 1 Individual Project

... communication. Second, the management can conduct a group discussion to be able to hear both sides of the story and to resolve the conflict. Only the confronting strategy (as tabulated above) can be truly viewed as a resolution approach, since this method addresses the basic differences involved and eventually removes them through creative problem solving. The confronting approach has many behavioural benefits. Both parties will more likely see the recent conflict as productive, since both parties received gains. Also important is their perception that the process was mutually supportive one in which problem solving and collaboration helped integrate the positions of both parties. As a result, participants find the confronting approach...
2 Pages(500 words)Essay

Unit 3/7: Management Research Project Stage 1 -Written Proposal-

...Management Research Project Written Proposal Introduction We investigate the case of the company CNC – Bearbeitung Munzmann (CBM). We producethe business case for the creation of the class of a new product by CBM, namely, CNC grinding products. We identify the research question whether CBM can improve turnover and profit by producing CNC grinding products. Using the research method of regression and survey research, we develop the business case for CBM to make both CNC milling and grinding products. The theories and models used in this proposal are concepts of Managerial Economics, multivariate regression analysis and survey analysis. Primary data used come from surveys, experiments and CBM company information. Secondary data used...
6 Pages(1500 words)Essay

Project Management - Module 1:2 roles in project management

...Project Management CJA/585 September XX, Project Management While there is no doubt that every project needs a leader for its successful completion, the question that arises is what defines that leader, and what thereafter determines his or her success. The answer to that lies in the fact that each project has its own unique requirements, and depending on those requirements, one needs its own way of management. There are various methods of management and control, and each member of a team has their own role to play. According to Kendrick, the members of a team can be divided into four particular roles – leader, manager, facilitator and mentor. A leader is one who directs the team, prescribing purpose and direction to the team. Once...
2 Pages(500 words)Coursework

Project Management - Module 3:3- 1:9

...Project Management - Module 3:3 9 Affiliation with more information about affiliation, research grants, conflict of interest and how to contact Project Management - Module 3:3- 1:9 Part 1: A status report facilitates information to the project team to understand the exact goals of the project and also updates the management properly on the progress, difficulties, and issues that a project may encounter from time to time. Typically, the status report of a project includes, “an executive summary, project issues, scope changes (if any), schedule status, resource status, detail on recent accomplishments, planned work for the next reporting cycle, project variance analysis, current and newly identified risks, additional detail as required...
3 Pages(750 words)Coursework

Project 1

... consists of two variables namely delayed costs and avoided costs. Avoided costs were the maintenance or the operational expenses that were to be incurred but were avoided. Whereas, delayed costs are the ones which were postpones by the violation but will be incurred to attain compliance. On the other hand, gravity based component are the penalties over and above the economic benefit. The gravity based component is more effective because in this way businesses will be encouraged to self-police and not to violate. Ans4. The conditions are that the discovery of violation must be through environmental audits or EMS- Environmental management system; Discovery of violation must be voluntarily; agreement of taking steps for preventions should...
2 Pages(500 words)Assignment

Implementing Schedule of Time Management

... to conclude this discussion by quoting this “quality assurance parameters involvement and their utilization in the project management is really important and effective to have a successful project completion and deployment”. For this reason we also tried to follow these rules to enhance the project management capacity and have effective decision power. References 1. Atkinson R, Crawford L, Ward S. (2006). Fundamental uncertainties in projects and the scope of project management. 24(8):P.P. 687–98. 2. Balachandra R, Friar J. (1997). Factors of success in R&D projects and new product innovation: a contextual approach. IEEE Trans Eng Manage. 44(3):276–87. 3. Kenneth C. Laudon. (1998). Management Information System; Sixth Edition. New York...
6 Pages(1500 words)Coursework

Change Management

In light of these, management must go out of their way to deal with organizational resistance to change because even the most carefully laid out or well-intentioned changes can still meet resistance. Subsequently, an organization’s ability to gain benefits from their change efforts is largely affected by their ability to create environments that encourage support and acceptance from other members of the organization. (Coetsee, 2003)
Some authors assert that resistance to change may be defined as behavior that human beings depict when they are attempting to protect themselves from the effects of change; these effects may be real or they may be imagined depending on the situation under consideration. Others believe that r...
10 Pages(2500 words)Coursework

Introduction to Change Management

Management often follows a “change management process” to change the existing process or activity.
Change management is a systematic approach for dealing with change that takes place in the organization as well as at the individual level. Such change management comprises of three aspects: adapting change, controlling it and finally affecting it. These three aspects of change management were well explained in three stages of change model given by Lewin (1952) and the three stages are “unfreezing”, “change” & “refreezing” (Orlikowski & Hofman, 1997). Another model for change was introduced by Prosci after conducting a research on more than 1000 companies from 59 countries....
7 Pages(1750 words)Case Study

Issues Connected to Human Resources Management

Notably, management professionals would agree, HRM system is an integration of various management practices with ‘people’ at its prime focus (Jackson, Schuler & Werner, 2008); and, the common factor between business organisations and educational institutions is ‘people,’ although their goals differ. This could be one main reason for attempting to implement HRM in educational institutions, although it is customized to organisational benefit.

Halachmi’s (2002a) extensive analysis on performance measurement clearly indicates the need for performance measurement in order to achieve the goals; and, it, in turn, establishes targets aligned to organisational goals and expectations; makes evalu...
8 Pages(2000 words)Assignment

Risk Management in the Airline Industry

With revenues in excess of ₤9 billion and a fleet of 245 aircraft as of March 2009, Heathrow-based BA’s risk management strategies provide an excellent example.
b) easyJet Plc, a Low-Cost Carrier, flying to more than 100 destinations in Europe, UK, and Northern Africa, and clocking over 50 million seats, with revenues of ₤2.4 billion in 2007-08 [2]. Covering over 380 routes with a fleet of 165 aircraft as of September 2008, Luton-based easyJet’s risk management strategies provide another excellent example with a different set of policies.

The airline industry, internationally, is characterized by its exposure to substantial operational and financial risks. Financial risks result in uncertainly in key pa...
6 Pages(1500 words)Case Study

People, Organisations and Management

Organizations and their management styles have evolved to a great extent in the service and manufacturing industry over the last century, and so have been the concepts of management and its functions. These evolutions can be traced to significant developments brought about by the industrial revolution, scientific management principles such as Taylorism and Fordism, transition of feudalistic to capitalistic approach and others in different sectors of manufacturing industries. However, the beginning of the industrial revolution was characterized by a rigid hierarchical bureaucratic way of organizing business enterprises, a style prevalent even today but only in military service organizations. Nevertheless, the manufacturing and busi...
8 Pages(2000 words)Assignment

Comparing Management and Leadership

Once a manager decides on something, his subordinates are required to follow whatever he tells them or else he would have to use the power and authority vested in him to reprimand those who go against his directives. Managers are not their own bosses and as such, they are motivated by the salaries which they are paid for their services. This also makes them subordinates who follow orders from their bosses and who hold them accountable for the progress or failure of the business. Management is a process that focuses on ensuring that there is stability in the organization as well as proper utilization of resources in order to create a harmonious environment for maximizing profits while also minimizing risks, which is the overall sen...
6 Pages(1500 words)Literature review

Nutrition and Lifestyle Management

Vitamins and minerals are micronutrients that are only required in small quantities but are indispensable in maintaining a strong and healthy body. Most individuals should be capable of obtaining all the nutrients they require by consuming a healthy, diverse diet, even though there are a few exemptions. For instance, females thinking about getting pregnant are advised to consume a folic acid supplement to prevent the abnormalities within the child. (What are nutrients? n.d.).

In this study, my case history is presented. I am 41 years of age and trying very hard to lose weight. There are no known diseases in my family that I know of and the only thing that I suffer from is severe constipation. Constipation may be a conti...
11 Pages(2750 words)Case Study

Logistics System Management

The logistics system is designed in such a manner as the combination of various facilities in the transportation at home, and the operations involved in the warehouse and the distribution channels for the manufacturing are the same. The supply chain is a collection of various complicated systems of logistics where they have a collection of raw materials and goods that are useful for the manufacturing of the final product and to the final distributors. “For example, in make-to-assembly (MTA) systems components and semi-finished products are manufactured in a push-based manner while the final assembly stage is pull-based. Hence, the work-in-process inventory at the end of the first stage is used to assemble the finished produc...
15 Pages(3750 words)Coursework

Project Management of Beijing Capital International Airport T3 Terminal

Some stakeholders can be both driving (positive) and restraining (negative) forces, it depends on how the project will meet their interests. These forces are marked by a dotted line. If changes happen, and the project won’t meet the interests of some of these stakeholders, a vector of the corresponding force will be changed onto the opposite and the force will move onto the opposite part of the diagram.

Each half of the diagram (left and right) is divided into three parts – Low, Medium and High. It defines the size of a force vector and indicates the importance (power) of a given force. Short forces have a low level of power.

Civil Aviation Administration of China (CAAC) – undoubtedly advanc...
7 Pages(1750 words)Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Let us find you another Essay on topic Project Management #1 for FREE!

Contact Us